
Using a #2 Phillips screw driver, tighten the top and bottom captive screws to secure
5.
the PRE5.
QUICK START GUIDE
Installing the PRE5
Before you begin installing the PRE5, you must install the foam gaskets
on the LCD display panel of the Cisco uBR10012 router to meet the EMI
requirements. Read the instructions in the Installing the Foam Gaskets
for PRE5 section in the PRE5 Hardware Installation Guide document
at:
http://www.cisco.com/en/US/docs/interfaces_modules/cable/performanc
e_routing_engine/installation/guide/b_pre5_hig.html
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883
Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks,
go to this URL: www.cisco.com/go/trademarks. Third-party trademarks mentioned are the property of their respective owners. The use of the word partner does
not imply a partnership relationship between Cisco and any other company. (1110R)
© 2013 Cisco Systems, Inc. All rights reserved.
Printed in the USA on recycled paper containing 10% postconsumer waste.
78-21148-02

1.
Ensure that the ejector levers of the PRE5 are at a fully-open position.
2.
Grasp the PRE5 and position it in the slot.
303383
3.
Keep the ejector levers of the PRE5 at the fully-open position, without exerting
excessive force. Then slide the PRE5 into the slot, slowly.
Chassis
front panel
surface
End of
ejector lever
361402
4.
Slide the PRE5 into the slot until the ends of both ejector levers touch the front panel
surface of the chassis. Then, pivot both the ejector levers toward each other to firmly
seat the PRE5 in the backplane.