APPENDIX
Task Lists
Task List for MGX 8240 Private Line Service Gateway
• Prepare site
• Unpack/Required tools
• Inventory parts
• Check condition
• Physically mount chassis
• Check cable length
• Check air flow ventilation and obstruction
• Check air for contamination, humidity, and temperature
• Mount I/O cards (including IMC I/O)
• Mount PSM cards and IMC card
• Connect bits clocks (if necessary)
• Check voltage
• Install power
• Connect power from chassis to power source
• Check fuses (if used)
• Check voltage
• Check Ready LED
• Configure PC/terminal
• Check software versions and revisions
• Perform FDOS
A
Task List for Common Interface Module
• Prepare site
• Unpack/Required tools
• Inventory parts
Release 2.2, 78-10084-01, November 1999
Cisco MGX 8240 Hardware Installation Guide
A-1
Task List for Common Interface Module
• Check condition of CIM
• Mount the Common Interface Module in rack
• Check cable length
• Check air flow ventilation and obstruction
• Check for air contamination, humidity, and temperature
• Connect 10Base-T between the Common Interface Module and 1600
• Connect other cables
• Check voltage
• Install power from the Common Interface Module to power source
• Check fuses (if used)
• Configure PC/terminal
• FDOS
Appendix A Task Lists
A-2
Cisco MGX 8240 Hardware Installation Guide
Release 2.2, 78-10084-01, November 1999