Installation and Start-Up Instructions
NOTE: Read the entire instruction manual before starting the
installation. This symbol indicates a change since the last issue.
SAFETY CONSIDERATIONS
Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Use quenching cloth for brazing operations. Have fire extinguisher available. Read these instructions thor­oughly and follow all warnings or cautions included in literature and attached to the unit. Consult local building codes and National Electrical Code (NEC) for special requirements.
Recognize safety information. This is the safety-alert symbol When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.
Understand the signal words DANGER, WARNING, and CAU­TION. These words are used with the safety-alert symbol. DAN­GER identifies the most serious hazards which willresultinsevere personal injury or death. WARNING signifies hazards which could result in personal injury or death. CAUTION is used to identify unsafe practices which would result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.
Before installing, modifying, or servicing system, main elec­trical disconnect switch must be in the OFF position. There may be more than 1 disconnect switch. Lock out and tag switch(es) with a suitable warning label. Electrical shock can cause personal injury or death.
INTRODUCTION AND RECOMMENDATIONS
NOTE: In some cases noise has been traced to improper instal-
lation of equipment.
1. Locate unit away from windows, patios, decks, and so forth where unit operation sounds may disturb customer.
2. Ensure that vapor- and liquid-tubediametersare appropriate to capacity of unit.
3. Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends.
38YCW
10 SEER Split-System
Heat Pump
A98525
Fig. 1—Model 38YCW
.
4. Leave some slack between structure and unit to absorb vibration.
5. When passing refrigerant tubes through the wall, seal opening with RTV or other pliable silicon-based caulk. (See Fig. 2.)
6. Avoid direct refrigerant tubing contact with water pipes, duct work, floor joists, wall studs, floors, and walls.
7. Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap that comes in direct contact with tubing. (See Fig. 2.)
8. Ensure that refrigerant tubing insulation is pliable and com­pletely surrounds vapor tube.
9. When necessary, use hanger straps which are 1 in. wide and conform to shape of tubing insulation. (See Fig. 2.)
10. Isolate hanger straps from insulation by using metal sleeves bent to conform to shape of insulation.
When outdoor unit is connected to factory-approved indoor unit, outdoor unit contains system-refrigerant charge for operation with indoor unit of the same size when connected by 15 ft of field-supplied or factory-accessory tubing. For proper unit opera­tion, check refrigerant charge using charging information located on control-box cover and/or in the Check Charge section of this Instruction.
IMPORTANT: Maximum liquid-line size is 5/8-in. O.D. for all residential applications including long line applications.
IMPORTANT: Always install a liquid-line filter drier. Refer to Product Data Digest for appropriate part number. Obtain filter drier from your distributor or branch.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4 Tab 5a 5a
PC 101 Catalog No. 533-80020 Printed in U.S.A. Form 38YCW-3SI Pg 1 2-02 Replaces: 38YCC-4SI
Avoid contact between tubing and structureNOTE:
OUTDOOR WALL INDOOR WALL
CAULK
LIQUID TUBE
C
INSULATION
THROUGH THE WALL
HANGER STRAP
(AROUND VAPOR
TUBE ONLY)
1 MIN.
SUSPENSION
VAPOR TUBE
JOIST
INSULATION
VAPOR TUBE
LIQUID TUBE
A94028
Fig. 2Connecting Tubing Installation
INSTALLATION
Step 1Check Equipment and Job Site
UNPACK UNIT Move to final location. Remove carton, taking care not to damage
unit. INSPECT EQUIPMENT
File claim with shipping company prior to installation if shipment is damaged or incomplete. Locate unit-rating plate on unit-service panel. It contains information needed to properly install unit. Check rating plate to be sure unit matches job specifications.
3
⁄8″D. (9.53) TIEDOWN
A
KNOCKOUTS (2) PLACES
B
A94199
Dimensions (In.)
UNIT
SIZE
018–030 22-1/2 x 22-1/2 3-11/16 18-1/8 14-3/8 036–060 30 x 30 6-1/2 23-1/2 20
MINIMUM
MOUNTING-PAD
DIMENSIONS
TIEDOWN KNOCKOUT LOCATIONS
ABC
Fig. 3Mounting Unit to Pad
Step 4Operating Ambients
The minimum outdoor-operating ambient in cooling mode is 55°F, and the maximum outdoor-operating ambient in cooling mode is 125°F. The maximum outdoor-operating ambient in heating mode is 66°F.
Step 5Elevate Unit
Step 2Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie-down bolts should be used and fastened through knockouts provided in unit base pan. Refer to unit-mounting pattern in Fig. 3 to determine base-pan size and knockout-hole location.
On rooftop applications, mount on level platform or frame 6 in. above roof surface. Place unit above a load-bearing wall and isolate unit and tubing set from structure. Arrange supporting members to adequately support unit and minimize transmission of vibration to building. Consult local codes governing rooftop applications.
Roof-mounted units exposed to winds above 5 mph may require wind baffles to achieve adequate defrost. Consult Low-Ambient Guideline for wind-baffle construction.
NOTE: Unit must be level to within ±2° (±3/8 in./ft) per compressor manufacturer specifications.
Step 3Clearance Requirements
When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 30-in. clearance to service end of unit and 48 in. above unit. For proper airflow, a 6-in. clearance on 1 side of unit and 12 in. on all remaining sides must be maintained. Maintain a distance of 24 in. between units. Position so water, snow, or ice from roof or eaves cannot fall directly on unit.
On rooftop applications, locate unit at least 6 in. above roof surface.
Accumulation of water and ice in base pan may cause equipment damage.
In areas where prolonged freezing temperatures are encountered, elevate unit per local climate and code requirements to provide clearance above estimated snowfall level and ensure adequate drainage of unit.
Step 6Check Indoor And Outdoor AccuRater® Piston
Check indoor-coil piston to see if it matches the required piston shown on outdoor unit-rating plate. If it does not match, replace indoor-coil piston with piston shipped with outdoor unit. The piston shipped with outdoor unit is correct for any approved indoor-coil combination.
Remove indoor-coil piston if unit is to be installed on system with a TXV-metering device.
Step 7Check Defrost Thermostat
Check defrost thermostat to ensure it is properly located and securely attached. There is a liquid header with a brass distributor and feeder tube going into outdoor coil. At the end of 1 of the feeder tubes, there is a 3/8-in. O.D. stub tube approximately 3 in. long. The defrost thermostat should be located on stub tube. Note that there is only 1 stub tube used with liquid header, and on most units it is the bottom circuit.
2
Table 1Refrigerant Connections and Recommended Liquid- and Vapor-Tube Diameters (In.)
UNIT
SIZE
018, 024 3/8 3/8 3/4 3/4 3/4 3/4 030, 036 3/8 3/8 3/4 3/4 3/4 7/8 042, 048 3/8 3/8 7/8 7/8 7/8 1-1/8
060 3/8 3/8 7/8 1-1/8 7/8 1-1/8
NOTES:
1. Tube diameters are for lengths up to 50 ft. For tubing lengths greater than 50 ft, consult Long Line section of the Application Guideline.
2. Do not apply capillary-tube indoor coils to these units.
Connection Diameter Tube Diameter Connection Diameter Tube Diameter Connection Diameter Tube Diameter
LIQUID VAPOR VAPOR (LONG LINE)
Step 8Make Piping Connections
Relieve pressure and recover all refrigerant before system repair or final unit disposal to avoid personal injury or death. Use all service ports and open all flow-control devices, including solenoid valves.
If ANY refrigerant tubing is buried, provide a 6 in. vertical rise at service valve. Refrigerant tubing lengths up to 36 in. may be buried without further special consideration. For lengths above 36 in., consult your local distributor.
To prevent damage to unit or service valves observe the following:
Use a brazing shield.
Wrap service valves with wet cloth or use a heat-sink
material.
Outdoor units may be connected to indoor section using accessory­tubing package or field-supplied refrigerant-grade tubing of cor­rect size and condition. For tubing requirements beyond 50 ft length or 20 ft vertical differential, substantial capacity and performance losses can occur. Following the recommendations in the Residential Split-System Long-Line Application Guideline will reduce these losses. Refer to Table 1 for field-tubing diam­eters.
REFRIGERANT TUBING Connect tubing to fittings on outdoor unit vapor- and liquid-
service valves. (See Table 1.) Use refrigerant-grade tubing. Refer to appropriate section below for type of service valves installed on unit.
SWEAT CONNECTION
non-silver-bearing brazing material. Consult local code re­quirements.
Refrigerant tubing and indoor coil are now ready for leak testing. This check should include all field and factory joints.
PISTON BODY
PISTON
PISTON RETAINER
STRAINER
SWEAT/FLARE ADAPTER
A97512
Fig. 4Liquid-Service Valve with Sweat-Adapter
Tube
FINAL TUBING CHECK IMPORTANT: Check to be certain factory tubing on both indoor
and outdoor unit has not shifted during shipment. Ensure tubes are not rubbing against each other or any sheet metal. Pay close attention to feeder tubes, making sure wire ties on feeder tubes are secure and tight.
Step 9Make Electrical Connections
To avoid valve damage while brazing, service valves must be wrapped in a heat-sinking material such as a wet cloth.
1. Remove plastic retainer holding outdoor piston in liquid­service valve.
2. Locate adapter tube shipped with unit.
3. Install strainer in adapter tube and connect tube to service valve. (See Fig. 4.)
4. Connect refrigerant tubing to fittings on outdoor-unit vapor­and liquid-service valves.
5. Service valves are closed from factory and ready for brazing. After wrapping service valve with a wet cloth, tubing set can be brazed to service valve using either silver-bearing or
To avoid personal injury or death, do not supply power to unit with compressor terminal-box cover removed.
Be sure field wiring complies with local and national fire, safety, and electrical codes, and voltage to system is within limits shown on unit-rating plate. Contact local power company for correction of improper voltage. See unit-rating plate for recommended circuit­protection device.
NOTE: Operation of unit on improper line voltage constitutes abuse and could affect unit reliability. See unit-rating plate. Do not install unit in system where voltage or phase imbalance (3 phase) may fluctuate above or below permissible limits.
NOTE: Use copper wire only between disconnect switch and unit.