Positive pressure storage systems are designed to provide safe and reliable service when operated within
design specifications. When operating this equipment,
use good judgment and safety precautions to avoid damage to equipment and property or injury to personnel.
Installation, start-up, and servicing of this equipment
can be hazardous due to system pressures, electrical
components, and equipment location (roofs, elevated
structures, etc.). Only trained, qualified installers and
service technicians should install, start up, and service
this equipment.
Be sure you understand and follow the procedures and
safety precautions contained in this guide.
DANGER
Failure to follow these procedures will result in severe personal injury or death.
DO NOT VENT refrigerant relief valves within a building.
Outlet from rupture disc or relief valve must be vented outdoors in accordance with the latest edition of ASHRAE 15
(American Society of Heating, Refrigerating, and AirConditioning Engineers). The accumulation of refrigerant
in an enclosed space can displace oxygen and cause
asphyxiation.
PROVIDE adequate ventilation in accordance with
ASHRAE 15, especially for enclosed and low overhead
spaces. Inhalation of high concentrations of vapor is harmful and may cause heart irregularities, unconsciousness, or
death. Misuse can be fatal. Vapor is heavier than air and
reduces the amount of oxygen available for breathing.
Product causes eye and skin irritation. Decomposition
products are hazardous.
DO NOT USE OXYGEN to purge lines or to pressurize a
machine for any purpose. Oxygen gas reacts violently with
oil, grease, and other common substances.
NEVER EXCEED specified test pressures, VERIFY the
allowable test pressure by checking the instruction literature and the design pressures on the equipment nameplate.
DO NOT USE air for leak testing. Use only tracer gases
and dry nitrogen.
DO NOT VALVE OFF any safety device.
BE SURE that all pressure relief devices are properly
installed and functioning before operating any machine.
WARNING
Failure to follow these procedures may result in personal
injury or death.
DO NOT USE TORCH to remove any component. System
contains oil and refrigerant under pressure.
To remove a component, wear protective gloves and goggles and proceed as follows:
a. Shut off electrical power to unit.
b. Recover refrigerant to relieve all pressure from sys-
tem using both high-pressure and low-pressure ports.
c. Traces of vapor should be displaced with nitrogen
and the work area should be well ventilated. Refrigerant in contact with an open flame produces toxic
gases.
d. Cut component connection tubing with tubing cutter,
and remove component from unit. Use a pan to catch
any oil that may come out of the lines and as a gage
for how much oil to add to the system.
e. Carefully unsweat remaining tubing stubs when nec-
essary. Oil can ignite when exposed to torch flame.
DO NOT USE eyebolts or eyebolt holes to rig machine
sections or the entire assembly.
DO NOT work on high-voltage equipment unless you are a
qualified electrician.
DO NOT WORK ON electrical components, including
control panels, switches, starters, or oil heater until you are
sure ALL POWER IS OFF and no residual voltage can
leak from capacitors or solid-state components.
LOCK OPEN AND TAG electrical circuits during servicing. IF WORK IS INTERRUPTED, confirm that all circuits are de-energized before resuming work.
AVOID SPILLING liquid refrigerant on skin or getting it
into the eyes. USE SAFETY GOGGLES. Wash any spills
from the skin with soap and water. If any enters the eyes,
IMMEDIATELY FLUSH EYES with water and consult a
physician.
NEVER APPLY an open flame or live steam to a refrigerant cylinder. Dangerous overpressure can result. When
necessary to heat refrigerant, use only warm (110 F [43 C])
water.
DO NOT REUSE disposable (nonreturnable) cylinders or
attempt to refill them. It is DANGEROUS AND ILLEGAL. When cylinder is emptied, evacuate remaining gas
pressure, loosen the collar and unscrew and discard the
valve stem. DO NOT INCINERATE.
(Warnings continued on next page.)
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-531900050-01Printed in U.S.A.Form 19XR-CLT-16SIPg 1 5-17Replaces: 19XR-6SI
WARNING
CHECK THE REFRIGERANT TYPE before transferring
refrigerant to the machine. The introduction of the wrong
refrigerant can cause damage or malfunction to this
machine.
Operation of this equipment with refrigerants other than
those cited herein should comply with ASHRAE 15 (latest
edition). Contact Carrier for further information on use of
this machine with other refrigerants.
ENSURE that refrigerant is only pumped to or stored in
tanks that are ASME (American Society of Mechanical
Engineers) certified for the pressures appropriate to the
refrigerant being handled.
DO NOT ATTEMPT TO REMOVE fittings, covers, etc.,
while machine is under pressure or while machine is running. Be sure pressure is at 0 psig (0 kPa) before breaking
any refrigerant connection.
CAREFULLY INSPECT all relief devices, rupture discs,
and other relief devices AT LEAST ONCE A YEAR. If
machine operates in a corrosive atmosphere, inspect the
devices at more frequent intervals.
DO NOT ATTEMPT TO REPAIR OR RECONDITION
any relief device when corrosion or build-up of foreign
material (rust, dirt, scale, etc.) is found within the valve
body or mechanism. Replace the device.
DO NOT install relief devices in series or backwards.
USE CARE when working near or in line with a com-
pressed spring. Sudden release of the spring can cause it
and objects in its path to act as projectiles.
CAUTION
Failure to follow these procedures may result in personal
injury or damage to equipment.
EQUIPMENT should be operated by certified personnel
only.
DO NOT STEP on refrigerant lines. Broken lines can whip
about and cause personal injury and damage to the
machine.
DO NOT climb over a machine. Use platform, catwalk, or
staging. Follow safe practices when using ladders.
USE MECHANICAL EQUIPMENT (crane, hoist, etc.) to
lift or move inspection covers or other heavy components.
Even if components are light, use such equipment when
there is a risk of slipping or losing your balance.
BE AWARE that certain automatic start arrangements
CAN ENGAGE THE STARTER. Open the disconnect
ahead of the starter in addition to shutting off the machine
or pump.
USE only repair or replacement parts that meet the code
requirements of the original equipment.
DOUBLE-CHECK that coupling nut wrenches, dial indicators, or other items have been removed before rotating
any shafts.
DO NOT LOOSEN a packing gland nut before checking
that the nut has a positive thread engagement.
PERIODICALLY INSPECT all valves, fittings, and piping
for corrosion, rust, leaks, or damage.
DO NOT MIX REFRIGERANT from chillers that use different compressor oils. Compressor damage can result.
(Cautions continued in next column.)
CAUTION
DO NOT re-use compressor oil or any oil that has been
exposed to the atmosphere. Dispose of oil per local codes
and regulations.
DO NOT leave refrigerant system open to air any longer
than the actual time required to service the equipment. Seal
circuits being serviced and charge with dry nitrogen to prevent oil contamination when timely repairs cannot be
completed.
The 19XR Positive Pressure Storage (PPS) system has been
designed to help owners and operators of positive pressure
chillers store HFC-134a refrigerant during service and repair
work. The 19XR system conserves this refrigerant and prevents the release of excessive amounts of refrigerant into the
2
atmosphere. The proper use of this equipment minimizes the
loss of HFCs.
The 19XR PPS system shown in Fig. 1 consists of a pumpout unit mounted on a storage tank. The pumpout unit is
offered as a free-standing unit that can be used with chillers
that have an existing storage tank or with chillers that have isolation valves that permit built-in refrigerant storage.
The 19XR PPS systems are factory tested and certified to
the American Society of Mechanical Engineers (ASME) pressure vessel code. The tanks are constructed of certified steel
and are pressure rated at 185 psig (1276 kPa). The PPS storage
tank is equipped with dual relief valves for proper venting per
ASHRAE 15 (American Society of Heating, Refrigerating, and
Air-Conditioning Engineers) guidelines. An automatic level
switch is prewired to the control circuit to ensure proper storage levels.
The 19XR pumpout unit is a complete, hermetic, compact
unit that consists of:
•a hermetic reciprocating compressor with a direct-drive
motor.
•a water-cooled refrigerant condenser.
•an oil separator.
•suction and discharge valves to control refrigerant flow.
•prewired safety and control devices.
Step 1 — Complete Pre-Installation Checks
IDENTIFY UNIT — Identify the assembly number (see
Table 1) printed on the pumpout unit and storage tank nameplates. Check this information against the job requirements.
Figure 1 shows the PPS system and its major components.
Refer to Tables 2 and 3 for physical data.
INSPECT SHIPMENT — Inspect unit for damage before
removing unit from shipping conveyance. If unit appears damaged, it should be inspected by a shipping inspector before
removal. File a claim with the shipping company if shipment is
damaged or incomplete. The manufacturer is not responsible
for damage incurred during transit.
Check all components. Notify the supplier immediately if
any item is missing. To prevent loss or damage, leave all parts
in their original package until they are needed.
Step 2 —
Mount the Pumpout Unit — The
pumpout unit, if purchased separately, may be mounted
directly on the chiller or it may be floor mounted.
MOUNTING ON THE CHILLER — See instructions provided with the chiller for mounting the pumpout unit. A typical
chiller mount is shown in Fig. 2.
FLOOR MOUNTING — Select a ventilated and accessible
INSTALLATION
area, free of traffic or other hazards. Remove and discard the
4 angle supports at the base of the pumpout unit and bolt the
unit to the floor through the holes at the base of the pumpout
unit. Special isolation is unnecessary. Contact surface and
dimensions for the pumpout unit are given in Fig. 3.
Table 1 — Positive Pressure System Assembly Numbers (R-134a)
PUMPOUT
SYSTEM
ARRANGEMENT
NUMBER
19XR0402740119XR04035801208/230-3-50/6015.8105.028 cu ft (0.8 cu m)
19XR0402740219XR04035802460-3-607.852.028 cu ft (0.8 cu m)
19XR0402740319XR04035803400-3-507.852.028 cu ft (0.8 cu m)
19XR0402750119XR04035801208/230-3-50/6015.8105.052 cu ft (1.5 cu m)
19XR0402750219XR04035802460-3-607.852.052 cu ft (1.5 cu m)
19XR0402750319XR04035803400-3-507.852.052 cu ft (1.5 cu m)
19XR0402680119XR04035801208/230-3-50/6015.8105.0Free-standing
19XR0402680219XR04035802460-3-607.852.0Free-standing
19XR0402680319XR04035803400-3-507.852.0Free-standing
19XR1401780119XR04035801208/230-3-50/6015.8105.0Unit-mounted, frame 1
19XR1401780219XR04035802460-3-607.852.0Unit-mounted, frame 1
19XR1401780319XR04035803400-3-507.852.0Unit-mounted, frame 1
19XR3401780119XR04035801208/230-3-50/6015.8105.0Unit-mounted, frame 2 or 3
19XR3401780219XR04035802460-3-607.852.0Unit-mounted, frame 2 or 3
19XR3401780319XR04035803400-3-507.852.0Unit-mounted, frame 2 or 3
19XR4401780119XR04035801208/230-3-50/6015.8105.0Unit-mounted, frame 4
19XR4401780219XR04035802460-3-607.852.0Unit-mounted, frame 4
19XR4401780319XR04035803400-3-507.852.0Unit-mounted, frame 4
19XR5401780119XR04035801208/230-3-50/6015.8105.0Unit-mounted, frame 5
19XR5401780219XR04035803460-3-607.852.0Unit-mounted, frame 5
19XR5401780319XR04035803400-3-507.852.0Unit-mounted, frame 5
19XR6401780119XR04035801208/230-3-50/6015.8105.0Unit-mounted, frame 6
19XR6401780219XR04035802460-3-607.852.0Unit-mounted, frame 6
19XR6401780319XR04035803400-3-507.852.0Unit-mounted, frame 6
19XR7401780119XR04035801208/230-3-50/6015.8105.0Unit-mounted, frame 7
19XR7401780219XR04035802460-3-607.852.0Unit-mounted, frame 7
19XR7401780319XR04035803400-3-507.852.0Unit-mounted, frame 7
19XR8401780119XR04035801208/230-3-50/6015.8105.0Unit-mounted, frame 8
19XR8401780219XR04035802460-3-607.852.0Unit-mounted, frame 8
19XR8401780319XR04035803400-3-507.852.0Unit-mounted, frame 8
LEGEND
LRA— Locked Rotor Amps
RLA— Rated Load Amps
PUMPOUT UNIT
ASSEMBLY NUMBER
COMPRESSOR MOTOR
(V-PH-Hz)
NOTES:
1. All storage vessels are 185 psig (1276 kPa) designs per the ASME (Ameri-
2. All units above are shipped with a 15 psig (103 kPa) nitrogen charge.
3. Nominal horsepower for all pumpout units is 3.0.
MAXIMUM
RLA
can Society of Mechanical Engineers) Boiler Pressure Vessel Code, Section VIII Division 1.
LRASTORAGE TANK
3
Step 3 —
Fig.1 — 19XR Positive Pressure Storage System
CONTACTOR
TERMINAL
STRIP
FUSES
TRANSFORMER
SWITCH
19XR PUMPOUT UNIT
19XR CONTROL BOX (INTERIOR)
a19-2444
a19-2444
a19-1569ef
COMPRESSOR
CONTROL
BOX
VALV E
ASSEMBLY
CONDENSER
OIL
SEPARATOR
Fig. 2 — 19XR Pumpout Unit: Typical Chiller Mount
a19-1570ef
Rig the Storage Tank — The complete
19XR system can be rigged as a single assembly. See the rigging instructions on the label attached to the assembly. Also
refer to the rigging guide (Fig. 4), physical data in Tables 2 and
3, and contact surface and dimensions for the complete system in Fig. 5. Lift the assembly only from the 4 points indicatedin the rigging guide. Each rigging cable must be capable of
supporting the entire weight of the assembly.
FRAME
ASSEMBLY
COMPRESSOR
VALVE 2
VALVE 3
VALVE 4
VALVE 5
CONTROL
PANEL
WARNING
Lifting the assembly from points other than those specified may result in serious damage to the assembly and
personal injury. Rigging equipment and procedures must
be adequate for assembly. See Tables 2 and 3 for weights.
(These weights are broken down into pumpout unit and
storage tank weights. For the complete assembly weight,
add all components together.)
ENTERING
WATER
LEAVING
WATER CONDENSER
OIL
SEPARATOR
OIL
HEATER
4
NOTE: Dimensions in inches (millimeters).
Fig. 3 — Pumpout Unit Contact Surfaces and Dimensions
VAPOR CONNECTIONS
ELECTRICAL CONNECTION OPTION LIST
TRADE SIZE
(in.)
QTYLOCATION
1
/
2
1TOP
3
/
4
1BOTTOM
11MIDDLE
1
1
/
4
1MIDDLE
a19-2445
Fig. 4 — Rigging Guide
NOTES:
1. Each chain must be capable of supporting the entire weight of the machine.
2. Minimum chain length:
28 ft
3
(0.79 m3) tank — 10-0 (3098 mm)
52 ft
3
(1.47 m3) tank — 15-6 (4724 mm)
STORAGE
TANK
SIZE
CENTER OF
GRAVITY
DIMENSIONS
(APPROX.)
ft-in. (mm)
OVERALL DIMENSIONS
(APPROX.)
ft-in. (mm)
EMPTY
WEIGHT
lb (kg)
ABCDE
28 CU FT
(0.8 CU M)
4-9
1
/8
(1451)
1-77/
8
(505)
10-5
(3175)
2-4
3
/
4
(730)
4-4
1
/
4
(1327)
2,385
(1082)
52 CU FT
(1.5 CU M)
6-11
5
/
8
(2124)
1-83/
4
(527)
14-111/
4
(4553)
2-81/
2
(826)
4-81/
4
(1429)
3,415
(1549)
a19-1572ef
WATER CONNECTIONS
3/4" FNPT
1/2" MALE FLARE
ELECTRICAL
CONNECTION
LOCATION
3.25
(83)
CONTROL PANEL
28.45
(723)
24.75
(629)
VACUUM SWITCH
OIL SEPARATORHIGH-PRESSURE SWITCH
COMPRESSOR
23.00
(584)
13.12
(333)
1.00
9.74
(247)
(25)
2.88
(73)
4.58
(116)
9.50
(241)
13.25
(337)
9.48
(250)
19.00
(438)
4.25
(108)
18.13
(461)
11.59
(294)
8.21
(209)
CONDENSER
(2X) 1.82
(33)
7.94
(202)
OIL SIGHTGLASS
10.50
(267)
MOUNTING HOLES
5
Table 2 — Physical Data — 19XR Pumpout Unit
ENGLISHSI
Pumpout Unit Weight*lb (kg)164(75)
Pumpout Condenser Water Flow Rategpm (L/s)7-9(.45-.58)
Pumpout Condenser Water Pressure Droppsig (kPa)0.3(2.0)
Maximum Entering Condenser Water TemperatureF (C)85(29)
Maximum Leaving Condenser Water TemperatureF (C)100(37)
Relief Valvepsig (kPa)235(1620)
Condenser Pressure Rating
*The pumpout unit weight includes the compressor/condenser, control box, and the oil separator.
NOTES:
1. The motor is hermetic with thermal protection.
2. The control box is mounted and wired with an ON/OFF/AUTO.
switch according to NEMA 1 (National Electrical Manufacturing
Association).
3. The starter contactor is located in the control box. The overloads on the motor are wired and the internal disconnect switch
is supplied by the customer.
Table 3 — 19XR Storage Tank Rated Dry Weight and Refrigerant Capacity
ANSI— American National Standards Institute
ASHRAE — American Society of Heating, Refrigeration,
UL— Underwriters’ Laboratories
*The above dry weight includes the pumpout unit weight of 164 lb
(75 kg).
and Air-Conditioning Engineers
TANK OD
in. (mm)
DRY WEIGHT*
lb (kg)
MAXIMUM REFRIGERANT CAPACITY LB (KG)
ASHRAE/ANSI 15UL 1963
R-134aR-134a
Step 4 — Make Piping Connections — Figure 5
represents typical pumpout unit/chiller piping connections.
Standard connections for
1
/2-in. OD copper tubing are provided. Install the field-supplied FPT tee with pipe plug in the piping as shown in Fig. 5. This tee is used for refrigerant charging.
NOTE: If any field piping runs exceed 50 ft in length, use
7
/8-in. OD copper tubing to minimize pressure drop.
Pumpout unit water piping connections are shown in Fig. 5.
Both connections are
3
/4-in. NPT (female). A shutoff valve
should be installed in the water line. Provide a means for blowing water from the condenser coil at winter shutdown to
prevent freeze-up damage. Refer to the Job Data for water
piping particulars.
INSTALL VENT PIPING TO RELIEF DEVICES — The
pumpout storage tank is factory-equipped with relief devices.
Refer to Fig. 6 and Table 4 for size and location of the relief
devices. Vent the relief devices to the outdoors in accordance
with ANSI/ASHRAE 15 Safety Code (latest edition) for
Mechanical Refrigeration and all other applicable codes.
Pumpout unit relief devices are set to relieve at 235 psig
(1620 kPa). Storage tank relief devices are set to relieve at
185 psig (1276 kPa).
DANGER
Refrigerant discharged into confined spaces can displace
oxygen and cause asphyxiation.
1. If relief devices are manifolded, the cross-sectional area
of the relief pipe must at least equal the sum of the areas
required for individual relief pipes.
2. Provide a pipe plug near outlet side of each relief device
for leak testing. Provide pipe fittings that allow vent piping to be disconnected periodically for inspection of valve
mechanism.
3. Piping to relief devices must not apply stress to the
device. Adequately support piping. A length of flexible
tubing or piping near the device is essential on springisolated machines.
4. Cover the outdoor vent with a rain cap and place a condensation drain at the low point in the vent piping to prevent water build-up on the atmospheric side of the relief
device.
Step 5 —
Make Electrical Connections — See
nameplate on compressor of pumpout unit and Table 1 for
motor electrical data. Wire unit according to the diagram inside
the control box.
Figure 7 is the wiring schematic for a complete system that
includes the 19XR storage tank and the pumpout unit. Figure 8
is the wiring schematic for the pumpout unit. Use this schematic for installations that do not include an auxiliary pumpout
storage tank.
NOTE: Use copper conductors only.
6
0’- 3 1/2"
[89mm]
2’- 9 7/8"
[860mm]
2’- 5"
[737mm]
0’- 9 7/8"
[249mm]
4’- 9 1/2"
[1451mm]
6’- 4 3/16"
[1935mm]
1" NPT
LIQUID CONN.
0’- 9"
[229mm]
TYPICAL
3’- 1 1/4"
[946mm]
3’- 4 5/8"
[1032mm]
3’- 4 7/8"
[1038mm]
2’- 9 9/16"
[852mm]
VAPOR
3/4" NPT
PUMPOUT CONDENSER
WATER INLET CONN.
1/2" MALE FLARE
VAPOR CONN.
3/4" NPT
PUMPOUT CONDENSER
WATER OUTLET CONN.
ELECTRICAL SERVICE
ACCESS SPACE
20 3/4" X 8 3/4" X 4 1/2"
(BOTH SIDES)
28 CU.FT. [.79 CU. METER]
STORGE TANK WITH PUMPOUT UNIT
10’- 5 "
[3175mm]
NOTES:
1. Denotes center of gravity.
2. Dimensions in [ ] are in millimeters.
3. The weights and center of gravity values given are for an empty
storage tank.
4. For additional information on the pumpout unit, see certified
drawings.
5. Conduit knockout is located on the side of the control box.
3. The weights and center of gravity values given are for an empty
storage tank.
4. For additional information on the pumpout unit, see certified
drawings.
5. Conduit knockout is located on the side of the control box.
6. Storage tank weight: 3414 lb (1549 kg).
FRONT VIEW
TOP VIEW
LEFT SIDE VIEW
52 CU FT [1.5 CU METER] STORAGE TANK WITH PUMPOUT UNIT
a19-2443
a19-1583
a19-1582
8
SERVICE VALVES
PUMPOUT
COMPRESSOR
PRESSURE RELIEF
VALV E
OIL
SEPARATOR
PUMPOUT
CONDENSER
WATER
CONNECTIONS
2
3
4
5
TO TOP OF
STORAGE TANK
STORAGE TANK
VAPOR VALVE
FROM BOTTOM
OF STORAGE TANK
STORAGE TANK
LIQUID REFRIGERANT VALVE
TEE FOR
REFRIGERANT
CHARGING
TO TOP OF
CHILLER
CONDENSER
SEE NOTE
# 1
TO TOP OF
CHILLER
COOLER
SEE NOTES
# 1 AND 2
CHECK
VALV E
SERVICE VALVES
PUMPOUT
COMPRESSOR
PRESSURE RELIEF
VALV E
OIL
SEPARATOR
PUMPOUT
CONDENSER
WATER
CONNECTIONS
2
3
4
5
TO TOP OF
STORAGE TANK
STORAGE TANK
VAPOR VALVE
FROM BOTTOM
OF STORAGE TANK
STORAGE TANK
LIQUID REFRIGERANT VALVE
TEE FOR
REFRIGERANT
CHARGING
TO BOTTOM OF
COOLER AND
CHILLER
CONDENSER
SEE NOTE
# 1
TO TOP OF
CHILLER
COOLER
OR CONDENSER
SEE NOTES
# 1 AND 2
TO ADDITIONAL
CHILLERS
CHECK
VALV E
CHILLERS WITHOUT ISOLATION VALVES
CHILLERS WITH ISOLATION VALVES
(WITH OR WITHOUT PUMPOUT STORAGE TANKS)
GENERAL PIPING CONNECTION SIZES
NOTES:
1. The field-supplied tubing is to be 1/2-in. OD tubing (min.) and
must be arranged and supported to avoid stresses on the equipment, transmission of vibrations, and interference with routine
access during the reading, adjusting, and servicing of the equipment. If the distance from the chiller to the pumpout unit is over
50 ft, then
7
/8-in. OD tubing (min.) must be used. Provisions
should be made for adjustment in each plane of the tubing and
for both periodic and major servicing of the equipment. Special
care must be taken so that the safety head does not experience
tubing strain. Vent the safety head per ASHRAE 15 (American
Society of Heating, Refrigerating, and Air-Conditioning Engineers), latest revision.
2. The tubing and valve from the storage tank to the pumpout compressor is factory supplied when the unit is factory mounted.
CONNECTIONSIZE (in.)
Refrigerant Transfer Connections
1
/2 Flare (male)
Condenser Water Cooling Connectors
3
/4 NPT (female)
Safety Relief Head Pumpdown
3
/8 Flare (male)
LEGEND
Factory-Supplied Tubing
Field-Supplied Tubing
Field-Supplied Tubing (Multiple Chillers)
Service Valve (Factory Supplied)
Service Valve (Field Supplied)
Figure 1 shows the major components of the PPS system.
Pumpout Unit — The pumpout unit consists of a
hermetic reciprocating compressor, a water cooled refrigerant
condenser, an oil separator, and prewired safety and control
devices. The pumpout unit comes equipped with a 4-way
transfer valve manifold to interconnect both liquid and vapor
transfer and to pressurize the chiller during transfer of refrigerant from chiller to storage tank.
CONTROLS — The pumpout unit has the following controls:
manual/off/automatic selector switch, transformer, .25 amp
fuses for the primary side of the transformer, 5 amp fuse for the
secondary side of the transformer, contactor, terminal strip,
high pressure cutout switch and low pressure switch.
SAFETY CONTROL SETTINGS — The pumpout unit highpressure switch (Fig. 3) is set to open at the settings listed in
Table 5. The switch setting is checked by operating the pumpout
condenser and slowly throttling the pumpout condenser water.
When the selector switch is in the Automatic position, the
pumpout will cycle on a low pressure/vacuum switch. This
switch will shut down the pumpout compressor when suction
pressure reaches 7 ± 1.5 psia or 15 ± 3 in. Hg vacuum
(51.7 kPa absolute). When the selector switch is in the On
position, the pumpout compressor will continue to run until
refrigerant vapor flow is so low that the compressor motor
overheats. At this time the compressor motor overload will
shut off the compressor. This is NOT recommended.
Table 5 — High Pressure Switch Settings
REFRIGERANT
R-134a
HIGH-PRESSURE SWITCH
CUTOUTCUT-IN
185 ± 10 psig
(1276 ± 69 kPa)
140 ± 10 psig
(965 ± 69 kPa)
COMPRESSOR — The hermetic compressor assembly
comes equipped with internal thermal protection on the motor
and a self-regulating crankcase heater.
CONDENSER — The water-cooled condenser is a brazed
plate heat exchanger. During transfer, it condenses refrigerant
vapor to liquid.
OIL SEPARATOR — The pumpout unit includes an in-line
oil separator to remove oil that becomes mixed with refrigerant
and returns the oil to the compressor.
SUCTION AND DISCHARGE VALVES — The pumpout
unit comes with a 4-way transfer valve manifold to interconnect both liquid and vapor transfer and to pressurize the chiller
during transfer of refrigerant from chiller to storage tank or
from one chiller vessel to another.
Storage Tank — The storage tank is rated for positive
pressure refrigerants under ASME Section VIII pressure vessel
codes with a minimum of 185 psig (1276 kPa) rating. The tank
components include:
DRAIN VALVE — Located at its lowest point of drain with a
minimum of 1 in. NPT.
DUAL RELIEF VALVES — Two relief valves and a 3-way
shut-off valve.
PRESSURE GAGE — A 30 in. Hg vacuum -0-400 psig
(101-0-2760 kPa) compound pressure gage.
LEVEL GAGE — Liquid level gage (magnetically coupled
dial type) with electronic shut-off at 90% liquid capacity.
WARNING
During transfer of refrigerant into and out of the pumpout
storage tank, carefully monitor the storage tank level gage.
Do not fill the tank more than 90% of capacity to allow for
refrigerant expansion. Overfilling may result in damage to
the tank and personal injury. For maximum refrigerant
capacity, refer to Table 3.
OPERATION
Overview —
another is accomplished by using either gravity or pressure
differential. A difference in elevation between 2 vessels results
in a gravity flow of liquid; a difference in pressure forces the
liquid from one vessel to the other. The latter method requires
lowering the pressure in one vessel. If there is liquid in that
vessel, its temperature must be lowered, and the pressure in the
other vessel must be simultaneously increased.
Under most circumstances, creating the pressure differential
is not a difficult process. Some applications, such as ice
storage, outdoor installations, or installations with high temperature differentials between the storage tank and the chiller
may require additional consideration. In some instances, it may
be necessary to add auxiliary heat to one of the vessels or to insulate the storage tank at job sites where high ambient temperature or sun load make it difficult to reduce the temperature and
pressure in the tank. Outdoor installations must have a roof or
cover over the storage tank to ensure that the pressure in the
tank does not exceed the chiller relief pressure setting.
REFRIGERANT TRANSFER — When refrigerant is being
evacuated from the chiller cooler or condenser vessels, any
liquid refrigerant left in a vessel will flash off, lowering the
temperature in that vessel enough to freeze the fluid (usually
water) flowing through the cooler or condenser tubes. This
event, called tube freeze-up, can cause extensive damage to the
chiller; therefore, all liquid refrigerant must be removed from a
vessel before evacuation of refrigerant vapor is started. If all
the liquid cannot be removed, then the cooler water and condenser water pumps must be operated throughout the process
of evacuating refrigerant vapor to keep fluid moving through
the cooler and condenser tubes.
TRANSFERRING LIQUID REFRIGERANT FROM THE
CHILLER COOLER TO THE CHILLER CONDENSER
OR PUMPOUT STORAGE TANK — Chiller and pumpout
unit valves are set to permit the pumpout compressor to
discharge refrigerant vapor into the cooler vessel, lowering
pressure in the condenser vessel/storage tank. The pressure
differential forces liquid from the cooler vessel into the condenser vessel/storage tank. After all the liquid is transferred, the
refrigerant vapor remaining in the cooler vessel can be drawn
off by reducing pressure in the chiller and discharging the
vapor through the pumpout unit condenser into the condenser
vessel/storage tank.
NOTE: The pumpout selector switch can be placed in On
or Automatic mode. In Automatic mode, the compressor will
shut off automatically once the suction pressure drops to 7 psia
or 15 in. Hg vacuum (51.7 kPa absolute). In On mode, the unit
will continue to pumpout regardless of the suction (vacuum)
pressure.
TRANSFERRING LIQUID REFRIGERANT FROM THE
CHILLER CONDENSER OR PUMPOUT STORAGE
TANK TO THE CHILLER COOLER — Chiller and pumpout unit valves are set to increase pressure in the chiller
condenser vessel/storage tank and to reduce pressure in the
cooler vessel. Pressure in the cooler vessel is lowered to correspond to a saturated refrigerant liquid temperature 2° F (1.1° C)
above the freezing temperature of the liquid circulating through
the chiller cooler/condenser tubes (34 F [1.1 C] for water). The
valves are set so that the pressure in the cooler vessel is lower
than that of the condenser vessel/storage tank, forcing the liquid into the cooler vessel.
NOTE: The pumpout selector switch can be placed in On or
Automatic mode. In Automatic mode, the compressor will shut
off automatically once the suction pressure drops to 7 psia or
15 in. Hg vacuum (51.7 kPa absolute). In On mode, the unit
will continue to pumpout regardless of the suction (vacuum)
pressure.
Transferring refrigerant from one vessel to
11
NOTE: During this operation, maintain water circulation
through the chiller cooler and condenser vessels to prevent
tube freeze-up.
DISTILLING THE REFRIGERANT — Refrigerant vapor is
transferred from the chiller cooler vessel or pumpout storage
tank through the pumpout condenser, condensed to a liquid,
and pumped to the chiller condenser vessel. During this operation, water circulation must be maintained in the pump-out
condenser. Refrigerant impurities left in the chiller cooler vessel or storage tank are then drained off. This operation can take
from 4 to 14 hours, depending on the type and amount of refrigerant being distilled.
The Pumpout and Refrigerant Transfer Procedures section
gives step-by-step instructions on performing these operations.
Pumpout and Refrigerant Transfer
Procedures
PREPARATION — The 19XR chiller may come equipped
with an optional pumpout storage tank, pumpout system, or
pumpout compressor. The refrigerant can be pumped for service work to either the chiller compressor vessel or chiller condenser vessel by using the optional pumpout system. If a
pumpout storage tank is supplied, the refrigerant can be isolated in the storage tank. The following procedures describe
how to transfer refrigerant from vessel to vessel and perform
chiller evacuation.
CAUTION
The power to the pumpout compressor oil heater must be
on whenever any valve connecting the pumpout compressor to the chiller or storage tank is open. Leaving the heater
off will result in oil dilution by refrigerant and can lead to
compressor failure.
If the compressor is found with the heater off and a
valve open the heater must be on for at least 4 hours to
drive the refrigerant from the oil. When heating the oil the
compressor suction must be open to a vessel to give the refrigerant a means to leave the compressor.
CAUTION
CAUTION
Do not mix refrigerants from chillers that use different
compressor oils. Compressor damage can result. The
pumpout oil separator comes pre-charged with 13 oz of
ISO viscosity 220 POE (Polyol Ester) oil. The pumpout
compressor is approved for use with ISO viscosity 220
POE oil or ISO viscosity 68 POE oil. The pumpout compressor is also factory precharged with oil.
OPERATING THE OPTIONAL PUMPOUT UNIT (Fig. 9)
— Oil should be visible in the pumpout unit compressor sight
glass under all operating conditions and during shutdown. If oil
is low, add oil as described under Maintenance section, page
17. The pumpout unit control wiring schematic is detailed in
Fig. 8.
To Read Refrigerant Pressures (during pumpout or leak testing):
1. The ICVC display on the chiller control panel is suitable
for determining refrigerant-side pressures and low (soft)
vacuum. To assure the desired range and accuracy when
measuring evacuation and dehydration, use a quality
vacuum indicator or manometer. This can be placed on
the Schrader connections on each vessel by removing the
pressure transducer.
2. To determine pumpout storage tank pressure, a 30 in. Hg
vacuum -0-400 psi (-101-0-2769 kPa) gage is attached to
the storage tank.
3. Refer to Fig. 10 and 11 for valve locations and numbers.
CAUTION
Transfer, addition, or removal of refrigerant in springisolated chillers may place severe stress on external piping
if springs have not been blocked in both up and down
directions.
Positive Pressure Chillers With Storage Tanks
Valve/Condition tables that accompany these instructions, the
letter “C” indicates a closed valve. Figures 9 and 10 show the
locations of the valves.
— In the
Always run the chiller cooler and condenser water pumps
and always charge or transfer refrigerant as a gas when the
chiller pressure is less than 35 psig (241 kPa). Below these
pressures, liquid refrigerant flashes into gas, resulting in
extremely low temperatures in the cooler/condenser tubes
and possibly causing tube freeze-up.
DANGER
During transfer of refrigerant into and out of the optional
storage tank, carefully monitor the storage tank level gage.
Do not fill the tank more than 90% of capacity to allow for
refrigerant expansion. Overfilling may result in damage to
the tank or the release of refrigerant which will result in
personal injury or death.
CAUTION
Always run chiller cooler and condenser water pumps and
always charge or transfer refrigerant as a gas when chiller
vessel pressure is less than 35 psig (241 kPa). Below these
pressures, liquid refrigerant flashes into gas, resulting in
extremely low temperatures in the cooler/condenser tubes
and possibly causing tube freeze-up.
CAUTION
The power to the pumpout compressor oil heater must be
on whenever any valve connecting the pumpout compressor to the chiller or storage tank is open. Leaving the heater
off will result in oil dilution by refrigerant and can lead to
compressor failure.
If the compressor is found with the heater off and a valve
open the heater must be on for at least 4 hours to drive the
refrigerant from the oil. When heating the oil the compressor suction must be open to a vessel to give the refrigerant
a means to leave the compressor.
12
Fig. 9 — Pumpout Unit
OIL FILL 1/4-IN. FLARE VALVE
a19-2446
FRAME
ASSEMBLY
CONTROL
PANEL
VALVE 2
VALVE 4
VALVE 5
VALVE 3
ENTERING
WATER
LEAVING
WATERCONDENSER
OIL
SEPARATOR
OIL
HEATER
COMPRESSOR
a19-
2444
Transfer Refrigerant from Storage Tank Vessel to Chiller
WARNING
During transfer of refrigerant into and out of the 19XR
storage tank, carefully monitor the storage tank level gage.
Do not fill the tank more than 90% of capacity to allow for
refrigerant expansion. Overfilling may result in damage to
the tank and personal injury.
1. Equalize refrigerant pressure.
a. Turn on chiller water pumps, establishing water
flow (assumes vacuum condition in chiller system).
b. Close pumpout and storage tank valves 2, 4, 5, 7,
8, 10 (if present open isolation valve 11 and other
isolation valves between cooler and condenser).
Open storage tank valve 6; open chiller valves 1A
and 1B.
VALVE 1A1B23456781011
CONDITIONCCCCCC
c. Gradually open valve 5 to slowly increase chiller
pressure to 35 psig (241 kPa) to reduce the potential of tube freeze up.
d. Open valve 5 fully after the chiller pressure
reaches 35 psig (241 kPa) or greater. Let chiller
pressure reach 40 psig (276 kPa), then chiller water
CONDITIONCCCCCC
CONDITIONCCCC
pumps can be turned off. Fully close valve 5.
VALVE 1A1B23456781011
e. Open valve 8 and 10 to let higher pressure in the
recovery tank push liquid refrigerant into the condenser float chamber and heat exchangers until the
refrigerant pressure equalizes between the recovery tank and chiller.
VALVE 1A1B23456781011
2. Push liquid to chiller, them remove remaining vapor from
storage tank:
a. To prepare for liquid, push open valve 4.
VALVE 1A1B23456781011
CONDITIONCCC
b. Ensure pumpout condenser water is off, then turn
on the pumpout compressor in manual mode to
push liquid to chiller. Monitor the storage tank
level until tank is empty of liquid refrigerant.
c. Close charging valves 8 and 10.
d. Turn off the pumpout compressor.
e. To prepare for removal of remaining refrigerant
vapor in storage tank, close pumpout valves 3 and
4 and open valves 2 and 5.
VALVE 1A1B23456781011
CONDITIONCCCCC
f. Turn on pumpout condenser water.
g. Run pumpout unit in auto until the vacuum switch
is satisfied. This occurs approximately at 15 in Hg
vacuum (48 kPa absolute or 7 psia), removing the
residual refrigerant vapor from the recovery tank
and condensing to a liquid in the chiller.
h. Close valves 1A, 1B, 2, 5, 6.
VALVE 1A1B23456781011
CONDITIONCCCCCCCCCC
i. Turn off pumpout condenser water.
Transfer Refrigerant from Chiller to Storage Tank Vessel
1. Equalize refrigerant pressure.
a. Dehydrate the refrigerant storage vessel, and con-
nected hoses/piping so there are no non-condensables mixed with the refrigerant.
b. Locate valves as identified below:
VALVE 1A1B23456781011
CONDITIONCCCCCC
c. Slowly open valve 5 until the refrigerant pressure
reaches 35 psig (241 kPa) in the storage
13
tank, followed by valves 7 and 10 to allow liquid
refrigerant to drain by gravity.
VALVE 1A1B23456781011
CONDITIONCCC
2. Push remaining liquid, followed by refrigerant vapor removal from chiller.
a. To prepare for liquid push, turn off the pumpout
condenser water. Place valves in the following
positions:
VALVE 1A1B23456781011
CONDITIONCCC
b. Run the pumpout compressor in manual until all
liquid is pushed out of the chiller (approximately
45 minutes). Close valves 2, 5, 7, and 10, then stop
compressor.
VALVE 1A1B23456781011
CONDITIONCCCCCCC
c. Turn on pumpout condenser water.
d. Open valves 3 and 4, and place valves in the fol-
lowing positions:
VALVE 1A1B23456781011
CONDITIONCCCCC
e. Run the pumpout compressor until the chiller pres-
sure reaches 35 psig (241 kPa), followed by turning off the pumpout compressor. Warm chiller
condenser water will boil off any entrapped liquid
refrigerant, and chiller pressure will rise.
f. When chiller pressure rises to 40 psig (276 kPa),
turn on the pumpout compressor until the pressure
reaches 35 psig (241 kPa) again; then turn off the
pumpout compressor. Repeat this process until the
chiller pressure no longer rises.
g. Start the chiller water pumps (condenser and
cooler), establishing water flow. At this point, turn
on the pumpout compressor in auto until the vacuum switch is satisfied. This occurs at approximately 15 in Hg vacuum (48 kPa absolute or
7psia).
h. Close valves.
VALVE 1A1B23456781011
CONDITIONCCCCCCCCCC
i. Turn off the pumpout condenser water.
Chillers With Isolation Valves
— In the Valve/Condition tables that accompany these instructions, the letter “C” indicates
a closed valve.
The valves referred to in the following instructions are
shown in Fig. 9 and 11. The cooler/condenser vessels can be
used for refrigerant isolation for certain service conditions
when the isolation valve package is specified.
Transfer Refrigerant from Cooler to Condenser
a. Turn off chiller water pumps and pumpout con-
denser water supply (if applicable). It is assumed
that the starting point is as shown in the following
table and that pressures in both vessels are above
35 psig (241 kPa).
VALVE 1A1B23457811
CONDITION CCCCCCCCC
b. Keeping valves 7 and 8 closed, install charging
hose from liquid line charging valve 7 to valve 8
on the condenser float chamber. Evacuate or purge
hose of non-condensables. Note that this creates a
flow path between cooler and condenser that
bypasses the linear float, reducing the potential for
damage during refrigerant transfer.
c. Open valves 1A, 1B, 2, 5, and 8.
VALVE 1A1B23457811
CONDITIONCCCC
d. Turn on pumpout compressor, generating a refrig-
erant pressure differential of 10 to 20 psi (69 to
138 kPa) to push liquid out of the chiller cooler
vessel.
e. Slowly
open valve 7 to allow liquid transfer. Rapid
opening of valve 7 can result in float valve damage.
f. When all liquid has been pushed into the chiller
condenser vessel, close valve 8.
VALVE 1A1B23457811
CONDITIONCCCC
g. Turn off the pumpout compressor.
h. Close pumpout valves 2 and 5 while opening valve
3 and 4 to prepare for removal of remaining refrigerant vapor in cooler vessel.
VALVE 1A1B23457811
CONDITIONCCCC
i. Turn on pumpout condenser water.
j. Turn on pumpout compressor. Turn on the chiller
water pump to establish water flow when the
cooler refrigerant pressure is 35 psig (241 kPa).
The water pumps have to be in operation whenever the refrigerant pressure is equal to or less
than 35 psig (241 kPa) to reduce the potential of
tube damage.
k. Run the pumpout compressor until the cooler pres-
sure reaches 35 psig (241 kPa), then turn off the
pumpout compressor. Warm chiller cooler water
will boil off any entrapped liquid refrigerant, and
chiller pressure will rise. Repeat this process until
the chiller pressure no longer rises.
l. Run pumpout unit in auto until the vacuum switch
is satisfied; this occurs at approximately 15 in. Hg
vacuum (48 kPa absolute or 7 psia). Close valve
1A.
VALVE 1A1B23457811
CONDITIONCCCCC
m. Monitor that cooler pressure does not rise (if it
does, then repeat previous step).
n. With service valve 1A closed, shut down pumpout
compressor (if still running).
o. Close remaining valves.
VALVE 1A1B23457811
CONDITION CCCCCCCCC
p. Remove charging hose between 7 and 8 (evacuate
prior to removal).
q. Turn off pumpout condenser water.
r. Turn off chiller water pumps, and lockout chiller
compressor.
Transfer Refrigerant from Condenser to Cooler
a. Turn off chiller water pumps and pumpout con-
denser water supply (if applicable). It is assumed
that the starting point is as shown in the following
14
table and that pressures in both vessels are above
35 psig (241 kPa).
VALVE 1A1B23457811
CONDITION CCCCCCCCC
b. Set valves as shown below to allow the refrigerant
to equalize:
VALVE 1A1B23457811
CONDITIONCCCCC
c. Turn on pumpout compressor, and develop a 10 to
20 psi (69 to 138 kPa) refrigerant differential pressure between the vessels.
d. Partially open valve 11 while maintaining a refrig-
erant pressure differential to push liquid refrigerant
out of the chiller condenser to the cooler.
e. When all liquid is out of the chiller condenser,
close valve 11 and any other isolation valves on the
chiller.
f. Turn off the pumpout compressor.
g. Close pumpout valves 3 and 4 while opening valve
2 and 5 to prepare for removal of remaining refrig-
erant vapor in condenser vessel.
VALVE 1A1B23457811
CONDITIONCCCCC
h. Turn on pumpout condenser water.
i. Turn on pumpout compressor.
j. Turn on the chiller water pumps, establishing water
flow when the condenser refrigerant pressure is 35
psig (241 kPa). The water pumps have to be in
operation whenever the refrigerant pressure is
equal to or less than 35 psig (241 kPa) to reduce
the potential of tube damage.
k. Run the pumpout compressor until the condenser
refrigerant pressure reaches 35 psig (241 kPa) then
turn off the pumpout compressor. Warm condenser
water will boil off any entrapped liquid refrigerant,
and chiller pressure will rise. Repeat this process
until the chiller pressure no longer rises.
l. Run pumpout unit in auto until the vacuum switch
is satisfied; this occurs at approximately 15 in. Hg
vacuum (48 kPa absolute or 7 psia). Close
valve 1B.
VALVE 1A1B23457811
CONDITIONCCCCCC
m. Monitor that condenser pressure does not rise (if it
does, then repeat previous step).
n. With service valve 1B closed, shut down pumpout
compressor (if still running).
o. Close remaining valves.
VALVE 1A1B23457811
CONDITION CCCCCCCCC
p. Turn off pumpout condenser water.
q. Turn off chiller water pumps, and lock out chiller
compressor.
Return Chiller to Normal Operating Conditions
1. Vapor Pressure Equalization:
a. Ensure that the chiller vessel that was exposed to
ambient has been evacuated. Final vacuum prior to
charging with refrigerant should in all cases be
29.9 in. Hg (500 microns, 0.07 kPa [abs]) or less.
b. Turn on chiller water pumps.
c. Open valves 1A, 1B, and 2.
VALVE 1A1B23457811
CONDITIONCCCCCC
d. Slowly open valve 4, gradually increasing pressure
in the evacuated vessel to 35 psig (241 kPa).
e. Leak test to ensure chiller vessel integrity.
f. Open valve 4 fully for cooler and condenser pres-
sure equalization (vapor equalization).
VALVE 1A1B23457811
CONDITIONCCCCC
g. Close valves 1A, 1B, 2, and 4.
VALVE 1A1B23457811
CONDITION CCCCCCCCC
2. Liquid equalization:
a. If refrigerant is stored in cooler, install a charging
hose between valves 7 and 8, and open both the
valves and any other isolation valves (except valve
11) for liquid to drain into the condenser while
bypassing the linear float valve. If refrigerant is
stored in the condenser, keep valve 11 and any
other isolation valves open for liquid drain.
VALVE 1A1B23457811
CONDITION
(CHARGE IN
COOLER)
CONDITION
(CHARGE IN
CONDENSER)
CCCCCCC
CCCCCCCC
b. If valves 7 and 8 were used to bypass the linear
float valve, once the liquid transfer is complete,
close these valves, and slowly open valve 11.
c. Turn off chiller water pumps.
Distilling the Refrigerant
1. Transfer the refrigerant from the chiller to the pumpout
storage tank as described in the Transfer Refrigerant from
Chiller to Storage Tank Vessel section.
2. Equalize the refrigerant pressure.
a. Turn on chiller water pumps and monitor chiller
pressures.
b. Close pumpout and storage tank valves 2, 4, 5, and
10, and close chiller charging valve 7; open chiller
isolation valve 11 and any other chiller isolation
valves, if present.
c. Open pumpout and storage tank valves 3 and 6;
open chiller valves 1a and 1b.
VALVE 1A1B2345671011
CONDITIONCCCCC
d. Gradually crack open valve 5 to increase chiller
pressure to 35 psig (241 kPa). Slowly feed refrigerant to prevent freeze-up.
e. Open valve 5 fully after the chiller pressure rises
above the freezing point of the refrigerant. Let the
storage tank and chiller pressure equalize.
3. Transfer remaining refrigerant.
a. Close valve 3.
b. Open valve 2.
VALVE 1A1B2345671011
CONDITIONCCCC
c. Turn on pumpout condenser water.
15
d. Run the pumpout compressor until the storage tank
a19-2434
COMPRESSOR
Fig. 10 — Typical Optional Pumpout System Piping Schematic with Storage Tank
NOTES:
1. Maintain at least 2 feet (610 mm) clearance around storage tank for service and operation work.
2. Valve 8 is only applicable for products with linear float valves.
pressure reaches 5 psig (34 kPa), 18 in. Hg vacuum
(41 kPa absolute) in Manual or Automatic mode.
e. Turn off the pumpout compressor.
f. Close valves 1a, 1b, 2, 5, and 6.Turn off pumpout
condenser water.
VALVE 1A1B2345671011
CONDITION CCCCCCCCC
4. Drain the contaminants from the bottom of the storage
tank into a container. Dispose of contaminants safely.
CONDENSER
COOLER
PUMPOUT
8
7
2
6
10
RELIEF
VALVE
OIL
SEPARATOR
PUMPOUT
CONDENSER
CHECK
VALVE
STORAGE VESSEL
16
a19-2435
PUMPOUT
COMPRESSOR
OIL
SEPARATOR
V
CONDENSER
Fig. 11 — Typical Optional Pumpout System Piping Schematic without Storage Tank
NOTE: Valve 8 is only applicable for products with linear float valves.
RELIEF
ALVE
PUMPOUT
CONDENSER
8
7
2
MAINTENANCE
Periodic maintenance is necessary to keep all components
functioning as designed. A maintenance log is recommended
to ensure a proper maintenance schedule is followed.
Pumpout Compressor Oil Charge — Use oil con-
forming to Carrier specifications for centrifugal or screw compressor use. Oil requirements are listed in Table 6.
Monitor and adjust compressor oil level as often as
necessary. When replacing lost oil, add the same type of oil that
is used in the chiller being pumped out.
Table 6 — Pumpout Compressor Requirements
REFRIGERANT
R-134a
The pumpout oil separator comes pre-charged with 13 oz of
ISO viscosity 220 POE (Polyol Ester) oil. The pumpout compressor is approved for use with ISO viscosity 220 POE oil or
ISO viscosity 68 POE oil. The pumpout compressor is also factory precharged with POE oil.
Oil should be visible in the pumpout compressor sight glass
both during operation and at shutdown. Always check the oil
level before operating the pumpout compressor.
Oil can be added to the 1/4-in. SAE flare access valve port
running from the top of the oil separator to the compressor
while the compressor is running. Be careful not to overfill.
NOTE: Compressor access valve has a self-sealing fitting
which will require a hose connection with a depressor to open.
To change or remove oil, the compressor will have to be removed from the assembly. Compressor can be disconnected
from connected tubing by the quick connect fittings at suction
and discharge and oil recovery line.
Prior to removal, close service valves 2, 3, 4, and 5, and run
the pumpout compressor in AUTOMATIC until the vacuum
switch is satisfied and the compressor shuts off.
ISO
VISCOSITY
68PP47-31
220PP47-32
COOLER
CARRIER
SPECIFICATION NO.
CHECK
VALVE
Move pumpout selector switch to OFF, and turn off all power
to unit prior to removing compressor unit from pumpout assembly frame and connecting tubing.
Service valves 2, 3, 4, and 5 remain closed while compressor is removed. Put compressor back in place. Use the torque
values listed in Table 7 for reassembly:
Table 7 — Torque Values for Reassembly
PARAMETER
Suction80 to 100109 to 136
Discharge50 to 6068 to 81
O-ring Face Seal7 to 910 to 12
VALUES
ft-lbNm
Be sure to use backup wrench and pull a deep vacuum in the
serviced pumpout tubing prior to any refrigerant exposure. At
this point, confirm that the oil level is satisfactory and put the
pumpout back in service.
Storage Tank — To prevent moisture and contaminants
from entering the storage tank, maintain positive pressure in
the tank when not transferring refrigerant. Leak test the storage
tank periodically.
Ordering Replacement Parts — The following in-
formation must accompany an order for Carrier-specified parts:
•machine model number and serial number
•name, quantity, and part number of the part required
•delivery address and method of shipment
TROUBLESHOOTING
Information on troubleshooting for the PPS system is included in Table8.
17
Table 8 — Troubleshooting
SYMPTOMPROBABLE CAUSEREMEDY
Compressor Does Not
Run
Compressor Cycles On
High-Pressure Control
Unit Operates Too LongIsolation valves partially openClose valves.
System NoisesPiping vibrationsSupport piping as required. Check for loose pipe connectors.
Compressor Loses OilLeak in systemLocate and repair leak.
Main power line openReplace fuse or reset circuit breaker.
Loose terminal connectionCheck connections.
Improperly wired controlsCheck wiring and rewire.
Low line voltageCheck line voltage; determine location of voltage drop.
Compressor motor defectiveCheck motor winding for open or short. Replace compressor if
Seized compressorReplace compressor.
High level gage alarmCheck refrigerant level and remove excess.
High-pressure control erratic in actionCheck capillary tube for pinches. Set control as required.
Discharge valve partially closed.Open valve.
Air in systemPurge system.
Condenser scaled.Clean condenser.
Condenser water pump or fans not
operating.
Insufficient compressor oilAdd oil.
Plugged or stuck compressor oil return
check valve
Liquid refrigerant carries oil out of
compressor
Motor shutdown on internal thermal protection high temperature cutout.
necessary.
Start pump or fans.
Repair or replace valve.
Check to ensure only refrigerant vapor enters compressor suction line. Add oil as necessary.
High temperature cutout should reset within 120 minutes.