BUSCH Mink MV 1202 A Instruction Manual

Instruction Manual
Mink
Claw Vacuum Pumps
MV 1202 A
0870159870/A0001_en / Original instructions / Modifications reserved 12/04/2017
Busch Produktions GmbH Schauinslandstraße 1, 79689 Maulburg Germany
Table of Contents
2 / 20 0870159870_MV1202A_A0001_IM_en
Table of Contents
1 Safety........................................................................................................................... 3
2 Product Description ..................................................................................................... 4
2.1 Operating Principle...............................................................................................4
2.2 Application ........................................................................................................... 5
2.3 Standard Features.................................................................................................5
2.3.1 Vacuum Relief Valve..................................................................................5
2.4 Optional Accessories............................................................................................. 5
2.4.1 Inlet Filter ..................................................................................................5
3 Transport ..................................................................................................................... 5
4 Storage......................................................................................................................... 6
5 Installation................................................................................................................... 6
5.1 Installation Conditions .......................................................................................... 6
5.2 Connecting Lines / Pipes ......................................................................................7
5.2.1 Suction Connection....................................................................................7
5.2.2 Discharge Connection................................................................................7
5.3 Filling Oil.............................................................................................................. 7
5.4 Electrical Connection ............................................................................................8
5.4.1 Wiring Diagram Three-Phase Motor ..........................................................8
6 Commissioning............................................................................................................ 10
6.1 Conveying Condensable Vapours ......................................................................... 10
7 Maintenance................................................................................................................ 11
7.1 Maintenance Schedule.......................................................................................... 11
7.2 Oil Level Inspection .............................................................................................. 11
7.3 Cleaning from Dust and Dirt.................................................................................12
7.4 Oil Change........................................................................................................... 13
8 Overhaul...................................................................................................................... 14
9 Decommissioning ........................................................................................................ 14
9.1 Dismantling and Disposal...................................................................................... 14
10 Spare Parts ................................................................................................................... 15
11 Troubleshooting........................................................................................................... 16
12 Technical Data ............................................................................................................. 18
13 Oil ............................................................................................................................... 18
14 EU Declaration of Conformity ...................................................................................... 19
Safety | 1
0870159870_MV1202A_A0001_IM_en 3 / 20
1 Safety
Prior to handling the machine this instruction manual should be read and understood. If anything needs to be clarified please contact your Busch representative.
Read carefully before use and keep for future reference.
This instruction manual remains valid as long as the customer does not change anything on the product.
The machine is intended for industrial use. It must be handled only by technically trained personnel.
The machine has been designed and manufactured according to state-of-the-art meth­ods. Nevertheless, residual risks may remain. This instruction manual highlights potential hazards where appropriate. Safety notes and warning messages are tagged with one of the keywords DANGER, WARNING, CAUTION, NOTICE and NOTE as follows:
DANGER
... indicates an imminent dangerous situation that will result in death or serious injuries if not prevented.
WARNING
... indicates a potentially dangerous situation that could result in death or serious injuries.
CAUTION
... indicates a potentially dangerous situation that could result in minor injuries.
NOTICE
... indicates a potentially dangerous situation that could result in damage to property.
NOTE
... indicates helpful tips and recommendations, as well as information for efficient and trouble-free operation.
2 | Product Description
4 / 20 0870159870_MV1202A_A0001_IM_en
2 Product Description
CAI IN OFP MTB
OUTODPOSG CAO
IN Suction connection ODP Oil drain plug
OUT Discharge connection MTB Motor terminal box
OFP Oil fill plug (=Venting valve) CAI Cooling air inlet
OSG Oil sight glass CAO Cooling air outlet
NOTE
Technical term.
In this instruction manual, we consider that the term ‘machine’ refers to the ‘vacuum pump’.
2.1 Operating Principle
The machine works on the claw principle.
Transport | 3
0870159870_MV1202A_A0001_IM_en 5 / 20
2.2 Application
The machine is intended for the suction of air and other dry, non-aggressive, non-toxic and non-explosive gases.
Conveying of other media leads to an increased thermal and/or mechanical load on the machine and is permissible only after a consultation with Busch.
The machine is intended for the placement in a non-potentially explosive environment.
The machine is suitable for continuous operation.
Permitted environmental conditions see Technical Data [}18].
2.3 Standard Features
2.3.1 Vacuum Relief Valve
The ultimate pressure is limited by a vacuum relief valve. The vacuum relief valve is ad­justed ex-works to the minimum permitted ultimate pressure (see nameplate).
2.4 Optional Accessories
2.4.1 Inlet Filter
It protects the machine against dust and other solids in the process gas. The inlet filter is available with a paper or polyester cartridge.
3 Transport
WARNING
Suspended load.
Risk of severe injury!
• Do not walk, stand or work under suspended loads.
SCH
Mink
B
U
Use both eye bolts!
Machine weight: see the technical data or the nameplate
4 | Storage
6 / 20 0870159870_MV1202A_A0001_IM_en
• Check the machine for transport damage.
In case of the machine being secured to a base plate:
• Remove the fixations.
WARNING
Lifting the machine using the motor eye bolt.
Risk of severe injury!
• Do not lift the machine using the eye bolt fitted to the motor. Only lift the machine as previously shown.
4 Storage
• Seal all apertures with adhesive tape or reuse provided caps.
In case of storage of more than 3months is scheduled:
• Wrap the machine in a corrosion inhibiting film.
• Store the machine indoors, dry, dust free and if possible in original packaging preferably at temperatures between 0 ... 40 °C.
5 Installation
5.1 Installation Conditions
SCH
Mink
B
U
~1 m
~1 m
~1 m
~1 m
• Make sure that the environment of the machine is not potentially explosive.
• Make sure that the ambient conditions comply with the Technical Data [}18].
• Make sure that the environmental conditions comply with the protection class of the motor.
• Make sure that the installation space or location is vented such that sufficient cooling of the machine is provided.
• Make sure that cooling air inlets and outlets are not covered or obstructed and that the cooling air flow is not affected adversely in any other way.
Installation | 5
0870159870_MV1202A_A0001_IM_en 7 / 20
• Make sure that the oil sight glass (OSG) remains easily visible.
• Make sure that enough space remains for maintenance work.
• Make sure that the machine is placed or mounted horizontally, a maximum of 1° in any direction.
• Check the oil level, see Oil Level Inspection [}11].
• Make sure that all provided covers, guards, hoods, etc. are mounted.
5.2 Connecting Lines / Pipes
• Make sure that the connection lines cause no stress on the machine‘s connection, if necessary use flexible joints.
• Make sure that the line size of the connection lines over the entire length is at least as large as the connections of the machine.
In case of very long connection lines it is advisable to use larger line sizes in order to avoid a loss of efficiency. Seek advice from your Busch representative.
5.2.1 Suction Connection
NOTICE
Intruding foreign objects or liquids.
Risk of damage to the machine!
In case of the inlet gas contains dust or other foreign solid particles:
• Install a suitable filter (5micron or less) upstream the machine.
Connection size:
– DN100 PN10/16
Depending on the specific order, other connection dimensions may apply.
5.2.2 Discharge Connection
Connection size:
– DN100 PN10/16
Depending on the specific order, other connection dimensions may apply.
• Make sure that the discharged gas will flow without obstruction. Do not shut off or throttle the discharge line or use it as a pressurised air source.
Unless the aspirated air is discharged to the environment right at the machine:
• Make sure that the discharge line either slopes away from the machine or provide a li­quid separator or a siphon with a drain cock, so that no liquids can flow back into the machine.
5.3 Filling Oil
The oil level should stay constant over the lifetime of the oil. If the level does fall, the gear is leaky and the machine requires repair.
5 | Installation
8 / 20 0870159870_MV1202A_A0001_IM_en
For oil type and oil capacity see Technical Data [}18] and Oil [}18].
1
4
MAX
MIN
3
2
Busch Oil
SCH
Mink
B
U
Check oil level
5.4 Electrical Connection
DANGER
Live wires.
Risk of electrical shock.
• Electrical installation work must only be executed by qualified personnel.
• Make sure that the power supply for the motor is compatible with the data on the nameplate of the motor.
• Provide an overload protection according to EN 60204-1 for the motor.
• Connect the protective earth conductor.
• Electrically connect the motor.
NOTICE
Incorrect connection.
Risk of damage to the motor!
• The wiring diagrams given below are typical. Check the inside of the terminal box for motor connection instructions/diagrams.
5.4.1 Wiring Diagram Three-Phase Motor
Installation | 5
0870159870_MV1202A_A0001_IM_en 9 / 20
Delta connection (low voltage): Star connection (high voltage):
Double star connection, multi-voltage motor with 9 pins (low voltage):
Star connection, multi-voltage motor with 9 pins (high voltage):
Double star connection, multi-voltage motor with 12 pins (low voltage):
4
4
4
Star connection, multi-voltage motor with 12 pins (high voltage):
4
4
4
Delta connection, multi-voltage motor with 12 pins (middle voltage):
4
4
4
NOTICE
Incorrect direction of rotation.
Risk of damage to the motor!
• Operation in the wrong direction of rotation can destroy the machine in a short time! Prior to starting-up make sure that the machine is operated in the right direction.
• Determine the intended direction of rotation with the arrow (stuck on or cast).
• Jog the motor briefly.
If the rotation must be changed:
• Switch any two of the motor phase wires.
6 | Commissioning
10 / 20 0870159870_MV1202A_A0001_IM_en
6 Commissioning
NOTICE
Lubricating a dry running machine (process chamber).
Risk of damage to the machine!
• Do not lubricate the process chamber of the machine with oil or grease.
CAUTION
During operation the surface of the machine may reach temperatures of more than 70°C.
Risk of burns!
• Avoid contact with the machine during and directly after operation.
CAUTION
Noise of running machine.
Risk of damage to hearing!
If persons are present in the vicinity of a non noise insulated machine over extended periods:
• Make sure that ear protection is being used.
• Make sure that the installation conditions (see Installation Conditions [}6]) are com­plied with.
• Switch on the machine.
• Make sure that the maximum permissible number of starts does not exceed 12 starts per hour.
As soon as the machine is operated under normal operating conditions:
• Measure the motor current and record it as reference for future maintenance and troubleshooting work.
6.1 Conveying Condensable Vapours
Water vapour within the gas flow is tolerated within certain limits. The conveyance of other vapours shall be agreed upon with Busch.
In order to use the machine for the conveyance of condensable vapours, the machine must be equipped with a corrosion protection coating (Aqua version) and a drain cock in the silencer.
If condensable vapours are to be conveyed:
Before process:
• Warm up the machine for approximately half an hour.
After process:
• Operate the machine for approximately another half an hour.
• Regularly drain condensate from the silencer with the drain cock.
Maintenance | 7
0870159870_MV1202A_A0001_IM_en 11 / 20
7 Maintenance
WARNING
Machines contaminated with hazardous material.
Risk of poisoning!
Risk of infection!
If the machine is contaminated with hazardous material:
• Wear appropriate personal protective equipment.
CAUTION
Hot surface.
Risk of burns!
• Prior to any action requiring touching the machine, let the machine cool down first.
• Shut down the machine and lock against inadvertent start up.
• Vent the connected lines to atmospheric pressure.
If necessary:
• Disconnect all connections.
7.1 Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The intervals given below are desired to be considered as starting values which should be shortened or extended as appropriate. Particularly heavy duty operation, such as high dust loads in the environment or in the process gas, other contamination or ingress of process material, can make it necessary to shorten the maintenance intervals significant­ly.
Monthly In case of an inlet filter being installed:
• Check the inlet filter cartridge, replace if neces­sary.
Every 3 months
• Check the oil level, see Oil Level Inspection [}11]. Every 6 months • Clean the machine from dust and dirt. Every 20000 hours • Change the oil.
The change interval of 20000 operating hours is valid for Busch approved oils only. The change interval de­pends very much on the operating conditions. Border­line operation may reduce the change interval down to approximately 5000 operating hours. Other oils may re­duce the change interval.
Every 6 years • Have a major overhaul on the machine (contact
Busch).
7.2 Oil Level Inspection
• Shut down the machine.
• When the machine is stopped, wait 1 minute before checking the oil level.
7 | Maintenance
12 / 20 0870159870_MV1202A_A0001_IM_en
MAX
MIN
MAX
MIN
MAX
MIN
The oil level should stay constant over the lifetime of the oil. If the level does fall, the gear is leaky and the machine requires repair.
• Fill up if necessary, see Oil Filling [}7].
7.3 Cleaning from Dust and Dirt
SCH
Mink
B
U
Clean the ventilation grilles and cooling fins
4 mm hex key
Maintenance | 7
0870159870_MV1202A_A0001_IM_en 13 / 20
7.4 Oil Change
1
3
2
SCH
Mink
B
U
Drain pan
Cleaning cloth
The oil level should stay constant over the lifetime of the oil. If the level does fall, the gear is leaky and the machine requires repair.
1
4
MAX
MIN
3
2
Busch Oil
SCH
Mink
B
U
Check oil level
8 | Overhaul
14 / 20 0870159870_MV1202A_A0001_IM_en
8 Overhaul
NOTICE
Improper assembly.
Risk of premature failure!
Loss of efficiency!
• It is highly recommended that any dismantling of the machine that goes beyond any­thing that is described in this manual should be done through Busch.
WARNING
Machines contaminated with hazardous material.
Risk of poisoning!
Risk of infection!
If the machine is contaminated with hazardous material:
• Wear appropriate personal protective equipment.
In case of the machine having conveyed gas that was contaminated with foreign materi­als which are dangerous to health:
• Decontaminate the machine as good as possible and state the contamination status in a ‘Declaration of Contamination’.
Busch will only accept machines that come with a complete filled in and legally binding signed ‘Declaration of Contamination’.
(Form downloadable from www.buschvacuum.com)
9 Decommissioning
• Shut down the machine and lock against inadvertent start up.
• Vent the connected lines to atmospheric pressure.
• Disconnect all connections.
In case of storage is planned:
• See Storage [}6].
9.1 Dismantling and Disposal
• Drain the oil.
• Separate special waste from the machine.
• Dispose of special waste in compliance with applicable regulations.
• Dispose of the machine as scrap metal.
Spare Parts | 10
0870159870_MV1202A_A0001_IM_en 15 / 20
10 Spare Parts
NOTICE
Use of non-Busch genuine spare parts.
Risk of premature failure!
Loss of efficiency!
• The exclusive use of Busch genuine spare parts and consumables is recommended for the proper function of the machine and for granting of warranty.
Spare part Description Part no.
Oil fill plug (=Venting valve)
Includes appropriate seal ring 0543 107 407
Oil sight glass 0583 000 001 Seal ring For oil sight glass 0480 000 271 Oil drain plug Includes appropriate seal ring 0415 134 870 Seal ring For oil drain plug 0482 137 352 Inlet screen 0534 159 449
If other parts are required:
• Contact your Busch representative for the detailed spare parts list.
11 | Troubleshooting
16 / 20 0870159870_MV1202A_A0001_IM_en
11 Troubleshooting
DANGER
Live wires.
Risk of electrical shock.
• Electrical installation work must only be executed by qualified personnel.
CAUTION
Hot surface.
Risk of burns!
• Prior to any action requiring touching the machine, let the machine cool down first.
S
C
H
Mink
B
U
VRE IS CPL
Problem Possible Cause Remedy
The machine does not start. The motor is not supplied
with the correct voltage.
• Check the power supply.
The motor is defective. • Replace the motor. The coupling (CPL) is de-
fective.
• Replace the coupling (CPL).
The machine does not reach the usual pressure on the suction connection.
The inlet screen (IS) is par­tially clogged.
• Clean the inlet screen (IS).
The vacuum relief valve (VRE) is misadjusted or de­fective.
• Replace the vacuum relief valve (VRE)
The inlet filter cartridge (op­tional) is partially clogged.
• Replace the inlet filter cartridge.
Internal parts are worn or damaged.
• Repair the machine (con­tact Busch).
Troubleshooting | 11
0870159870_MV1202A_A0001_IM_en 17 / 20
The machine runs very nois­ily.
Worn coupling (CPL). • Replace the coupling
(CPL). Oil level too low. • Top up oil. Defective bearings. • Repair the machine (con-
tact Busch).
The machine runs too hot. Insufficient cooling. • Remove dust and dirt
from the machine. Ambient temperature too
high.
• Observe the permitted ambient temperature, see
Technical Data [}18].
Temperature of the process gases at the inlet too high.
• Observe the permitted gas inlet temperature, see
Technical Data [}18].
Oil level too low. • Top up oil.
For the solution of problems not mentioned in the troubleshooting chart contact your Busch representative.
12 | Technical Data
18 / 20 0870159870_MV1202A_A0001_IM_en
12 Technical Data
MV 1202 A
Nominal pumping speed (50Hz / 60Hz) m³/h 950 / 1150 Ultimate pressure hPa (mbar) abs. see nameplate Nominal motor rating (50Hz / 60Hz) kW 18.5 / 22.0 Nominal motor speed (50Hz / 60Hz) min
-1
3000 / 3600
Noise level (ENISO2151) at 400 hPa (mbar) abs. suction pressure (50Hz / 60Hz)
dB(A) 79 / 82
Ambient temperature range °C 0 … 40 Ambient pressure Atmospheric pressure Oil capacity l 3.5 Weight approx. kg 750
13 Oil
VS 150 VSB 100
ISO-VG 150 100 Part number 1L packaging 0831 164 883 0831 168 351 Part number 5L packaging 0831 164 884 0831 168 352 Remark Standard oil for non-demanding
applications
Food applications (H1)
EU Declaration of Conformity | 14
0870159870_MV1202A_A0001_IM_en 19 / 20
14 EU Declaration of Conformity
This Declaration of Conformity and the CE-mark affixed to the nameplate are valid for the machine within the Busch scope of delivery. This Declaration of Conformity is issued under the sole responsibility of the manufacturer. When this machine is integrated into superordinate machinery the manufacturer of the superordinate machinery (this may be the operating company) must conduct the conformity assessment process for the superordinate ma­chine or plant, issue the Declaration of Conformity for it and affix the CE-mark.
The manufacturer Busch Produktions GmbH
Schauinslandstr. 1 DE-79689 Maulburg
declare that the machine(s): Mink MV 1202 A with a serial number from D1701… to D1852… has (have) been manufactured in accordance with the European Directives:
– ‘Machinery’ 2006/42/EC
– ‘Electromagnetic Compatibility’ 2014/30/EU
– ‘RoHS’ 2011/65/EU, restriction of the use of certain hazardous substances in electrical and electronic equip-
ment
and following the standards.
Standard Title of the Standard
EN ISO 12100:2010 Safety of machinery - Basic concepts, general principles of design EN ISO 13857:2008 Safety of machinery - Safety distances to prevent hazard zones being reached
by the upper and lower limbs
EN 1012-1:2010 EN 1012-2:1996 + A1:2009
Compressors and vacuum pumps - Safety requirements - Part 1 and Part 2
EN ISO 2151:2008 Acoustics - Noise test code for compressors and vacuum pumps - Engineering
method (grade 2)
EN 60204-1:2006 Safety of machinery - Electrical equipment of machines - Part 1: General re-
quirements
EN 61000-6-2:2005 Electromagnetic compatibility (EMC) - Generic standards. Immunity for indus-
trial environments
EN 61000-6-4:2007 + A1:2011 Electromagnetic compatibility (EMC) - Generic standards. Emission standard
for industrial environments
EN ISO 13849-1:2015
(1)
Safety of machinery - Safety-related parts of control systems - Part 1: General principles for design
Person authorised to compile the technical file: Andrej Riwe
Busch Produktions GmbH Schauinslandstr. 1 DE-79689 Maulburg
Maulburg, 08.01.2017
Dr.-Ing Karl Busch, General director
(1)
In case control systems are integrated.
Argentina
www.busch-vacuum.com.ar
Australia
www.busch.com.au
Austria
www.busch.at
Belgium
www.busch.be
Brazil
www.buschdobrasil.com.br
Canada
www.busch.ca
Chile
www.busch.cl
China
www.busch-china.com
Colombia
www.buschvacuum.co
Czech Republic
www.buschvacuum.cz
Denmark
www.busch.dk
Finland
www.busch.fi
France
www.busch.fr
Germany
www.busch.de
Hungary
www.buschvacuum.hu
India
www.buschindia.com
Ireland
www.busch.ie
Israel
www.busch.co.il
Italy
www.busch.it
Japan
www.busch.co.jp
Korea
www.busch.co.kr
Malaysia
www.busch.com.my
Mexico
www.busch.com.mx
Netherlands
www.busch.nl
New Zealand
www.busch.com.au
Norway
www.busch.no
Peru
www.busch.com.pe
Poland
www.busch.com.pl
Portugal
www.busch.pt
Russia
www.busch.ru
Singapore
www.busch.com.sg
South Africa
www.busch.co.za
Spain
www.buschiberica.es
Sweden
www.busch.se
Switzerland
www.busch.ch
Taiwan
www.busch.com.tw
Thailand
www.busch.co.th
Turkey
www.buschvacuum.com
United Arab Emirates
www.busch.ae
United Kingdom
www.busch.co.uk
USA
www.buschusa.com
www.buschvacuum.com
Busch Vacuum Pumps and Systems
All over the World in Industry
0870159870/A0001_en / © Busch Produktions GmbH
Loading...