Bunn ES.2C User Manual

BUNNEspress
N
IO
T
U
A
ces
C
T
urfa
O H
HOT
-S
m
id-Stea
u
Liq
®
F
F
O
N
O
5 , 0
0,5
0
1
0
5
,
4
1
1,5
2
8
2
L
CL 2
C
5
,
2,5
2
1212
1616
r a
b
bar
Espresso Brewer
OPERATING & SERVICE MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
10837.0000C 6/96 ©1994 Bunn-O-Matic Corporation
BUNN Espress
®
GENERAL
ES•2C
User notices......................................................................................................................... 3
Site Requirements ...............................................................................................................4
Installation ........................................................................................................................... 5
Operating Controls............................................................................................................... 6
Adjustments ........................................................................................................................ 7
Operation ............................................................................................................................. 8
Brewing tips ........................................................................................................................ 9
Cleaning............................................................................................................................. 10
Alarms ............................................................................................................................... 11
Troubleshooting ................................................................................................................ 12
Plumbing Diagram............................................................................................................. 16
Wiring Diagram ................................................................................................................. 17
INTRODUCTION
This compact, easy-to-operate equipment produces consistently fine esspresso and related beverages with the push of a button. The brewer has two group heads, each selectable to deliver one of four different programmed amounts of beverage. It has two milk steam wands and a hot water wand. All of the critical functions of the brewer are electronically controlled.
WARRANTY
Bunn-O-Matic Corp. (“Bunn”) warrants the equipment manufactured by it to be commercially free from defects in material and workmanship existing at the time of manufacture and appearing within one year from the date of installation. This warranty does not apply to any equipment, component or part that was not manufactured by Bunn or that, in Bunn’s judgement, has been affected by misuse, neglect, alteration, improper installation or operation, improper maintenance or repair, damage or casualty.
THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR ORAL, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER MERCHANTABIL­ITY OR FITNESS FOR A PARTICULAR PURPOSE. The agents, dealers or employees of Bunn are not authorized to make
modifications to this warranty or to make additional warranties that are binding on Bunn. Accordingly, statements by such individuals, whether oral or written, do not constitute warranties and should not be relied upon.
The Buyer shall give Bunn prompt notice of any claim to be made under this warranty by telephone at (217) 529­6601 or by writing to Post Office Box 3227, Springfield, Illinois, 62708-3227. If requested by Bunn, the Buyer shall ship the defective equipment prepaid to an authorized Bunn service location. If Bunn determines, in its sole discretion, that the equipment does not conform to the warranty, Bunn shall repair the equipment with no charge for parts during the one year warranty period and no charge for labor by a Bunn Authorized Service Representative during the one year warranty period. If Bunn determines that repair is not feasible, Bunn shall, at its sole option, replace the equipment or refund the purchase price for the equipment.
THE BUYER’S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AS SPECIFIED HEREIN, TO REPAIR OR, AT BUNN’S SOLE OPTION, REPLACEMENT OR REFUND. Bunn shall not be liable for any other
damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
2
BUNN Espress
The notices on this brewer should be kept in good condition. Replace unreadable or damaged labels.
®
USER NOTICES
00656.0000
ES•2C
00831.0000
CAUTION
HOT
Liquid-Steam-Surfaces
24246.0000
24247.0000
3
BUNN Espress
®
SITE REQUIREMENTS
ES•2C
PHYSICAL
The brewer is for indoor use only on a sturdy counter. It is 261⁄2” (67 cm) wide,16” (40.5 cm) tall, and 191⁄2” (49 cm) deep. The brewer weighs approximately 142 pounds (64.5 kg) when the water tank is filled.
PLUMBING
The brewer must be connected to a cold water source with operating pressure between 20 and 90 psi (1.5-
6.5 bar) from a 1⁄2” or larger supply line. Install a valve in the water line before the brewer. Install a regulator before the brewer when the pressure is greater than 100 psi (7 bar) to reduce it to 45-60 psi ( 3-4 bar). The enclosed water strainer and either of the two enclosed water inlet hose assemblies must be installed before the brewer.
NOTE-Only softened or demineralized water should ever be used in this espresso brewer to reduce the service problems caused by naturally occuring elements in your local water supply. A polyphosphate feeder is not recommended because it does not remove minerals.
NOTE-Bunn-O-Matic recommends 3⁄8” copper tubing for no more than 25 feet from the 1⁄2” water supply line. Bunn-O-Matic does not recommentd the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
ELECTRICAL
The brewer is equipped with an attached cordset and requires a 2-wire, grounded mating receptacle rated 208-240 volts ac, 20 amp, single phase, 60 Hz. An electrician must properly install a NEMA L6-20R connector to the appropriate electrical service on an individual branch circuit to install this brewer.
CAUTION-The brewer must be properly grounded. A plumbing line will not provide an adequate ground.
4
BUNN Espress
®
PLUMBING
Install the brewer as indicated below
FROM
WATER
SUPPLY
From Water Treatment
WATER STRAINER
24682.0000 Adaptor
ASSY.
INSTALLATION
INLET HOSE
24684.0000
Sealing Washer
23820.0000
Strainer Assy.
BUNN
s
m
ig
p
0
9
S
M
O
B
ES•2C
24684.0000
Sealing Washer
24683.0000 Adapter
To Espresso Brewer
W
O
L
F
e
r
s
s
u
e
r
p
g
tin
a
r
e
p
x
o
a
r
e
in
a
r
t
Inlet Hose
ELECTRICAL
CAUTION-The brewer must be disconnected from the power source until specified. Improper electrical
installation will damage electronic components.
1. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
2. When instructed to proceed, connect the brewer to the power source.
CAUTION-The brewer must be properly grounded. A plumbing line will not provide an adequate ground.
INITIAL FILL & HEAT
CAUTION-The brewer must be disconnected from the power source until specified. Improper electrical
installation will damage electronic components. Plumbing must be connected to the brewer before proceeding.
1. Watch the tank water level gage and push the tank/boiler manual fill button. Hold the button until the water level is visible in the sight gage.
2. Connect the brewer to the power source.
3. Place the main power switch in the “ON” position. The automatic refill function of the electronic control system will engage at this time. The refill indicator will glow and the tank will automatically fill with water. This switch also initiates the heating of the water in the tank/boiler.
4. Press the continuous flow button on each of the group control panels just until water flows from the group heads. This will purge air from the lines and allow faster heating of the group heads.
5
BUNN Espress
®
OPERATING CONTROLS
1 .............. Tank/Boiler Manual Fill Button
2 .............. Pressure Gage
3 .............. Hot Water Wand
4 .............. Tank Water Level Gage
5 .............. Hot Water Wand Control Knob
6 .............. Espresso Group Head
7 .............. Cup Warmer Tray
8 .............. Steam Wand Control Knob
9 .............. Power Indicator Lamp
10 ............ Main Power Switch
11 ............ Steam Wand
12 ............ Drip Tray
13 ............ Drip Tray Grate
14 ............ Filter Holder
15 ............ Program Switch
ES•2C
16 ............ Group Control Panel
A .............. One Half-Cup Selector
B .............. One Full-Cup Selector
C .............. Two Half-Cups Selector
D.............. Two Full-Cups Selector
E .............. Continuous Flow Button
F .............. Brew Indicator
6
Loading...
+ 11 hidden pages