Bryan Boilers CL, RW User Manual

0 (0)
Bryan Boilers CL, RW User Manual

Form No. 8200

(05/02)

TM BRYAN STEAM

Automatic Surface and Bottom

Blowdown System

Features

UL/CSA recognized components

Honeywell 24 hour time clock

Dial marked in quarter hour increments

Motorized ball valve with state-of-the-art electric actuator

Valve actuator is sealed and permanently lubricated

Controls enclosed in a NEMA Type 1 enclosure

All boilers require proper care and maintenance to maintain optimal performance. In particular, steam boilers will operate more efficiently if serviced by either a surface or bottom blowdown system. Bryan Boilers can provide these systems in either manual or automatic designs. A regular blowdown procedure to remove accumulated sludge will extend the life and performance of your boiler. A BRYAN AUTOMATIC BLOWDOWN SYSTEM will assure that your boiler has regular blowdown on a preset schedule.

The time and duration of the blowdown period is selectable. Multiple sequences during a

Benefits

Helps maintain safe levels of dissolved solids in boiler water

Prevents scale formation

Helps to eliminate costly down time

Frees boiler operator for other duties

24-hour period can be achieved if necessary. The system is comprised of a 24-hour syn-

chronous drive time clock and a time delay relay in a NEMA Type 1 panel. This controls a motorized ball valve. Our bottom blowdown system includes manually operated quick opening and slow opening blowdown valves. Our surface blowdown system includes a gate valve and a motorized valve. The bottom blowdown is piped to allow for manual bypassing of the automatic system should the need arise. These systems can be installed at the factory or are available for field installation on existing boilers.

Loading...
+ 1 hidden pages