ASSE 1017 & UPC Certified
Installation
S59-3130
Table of Contents
Supplies Required ............................ 2
Installation Instructions ........................ 3
Troubleshooting .............................. 5
Inlet Connections: 1-1/4" NPT
Outlet Connection: 1-1/2" NPT
Temperature Range: 90 – 120°F
Maximum Pressure: 125 PSIG
Inlet Temperature Hot: 120 – 200° F
Inlet Temperature Cold: 33 – 80° F
Minimum Temperature Differential (from valve set point): 20° F
215-1302 Rev. K; ECN 14-09-029 © 2014 Bradley Page 1 of 7 11/7/2014
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 800 BRADLEY (800 272 3539) +1 262 251 6000
bradleycorp.com
Page 2
S59-3130 Installation
IMPORTANT
WARNING! Make sure that all water supply lines have been flushed and then completely turned off before beginning installation. Debris in supply lines can cause valves to malfunction.
WARNING! Failure to comply with proper installation and maintenance instructions could contribute to a valve failure resulting in severe bodily injury including scalding, chilling and/or death depending upon system water pressure changes and/or supply water temperature changes.
This thermostatic mixing valve is designed to be installed at or near the boiler or water heater. It is not designed to compensate for system pressure fluctuations and should not be used where ASSE standard 1016, 1069 or 1070 devices are required. These valves should never be used to provide "anti-scald" or "anti­chill" service. This valve does not provide protection from pipe freezing.
Consult local building and plumbing codes prior to installation. Should these codes differ from the information in the manual, follow the local codes. Inquire with governing authorities for additional local requirements.
Regular checking and cleaning of the valve's internal components and check stops is necessary for maximum life and proper product function. Periodic inspection and yearly maintenance by a licensed contractor is required. Corrosive water conditions and/or unauthorized adjustments or repairs could render the valve ineffective for it's intended service. Frequency of cleaning and inspection depends upon local water conditions.
Output temperature of the valve must be checked and adjusted at initial installation and on a quarterly basis.
Read this entire installation manual to ensure proper installation. When finished with the installation, file this manual with the owner or maintenance department. Compliance and conformity to local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Product warranties may be found under “Products” on our web site at bradleycorp.com.
Supplies recommended for installation
• Lockable shut-off on the outlet if tempered water is supplied to one or more remote fixtures
• Lockable shut-off on the inlets/supplies
• (6) 3/8" wall anchors and fasteners for surface-mounted cabinet
• (4) 1/4" and (2) 3/8" fasteners (and wall anchors, if necessary) for recess-mounted cabinet
• Unions on all connections to facilitate removal of valve
Tools required for temperature adjustment
• 5/32" Allen wrench
• Blade screwdriver
2 11/7/2014 Bradley • 215-1302 Rev. K; ECN 14-09-029
Page 3
Installation S59-3130
1
Connect Supply Lines and Install Thermometer
Flush the supply lines before beginning installation.
When the check valves are in the open (opera ting) position, the cover screw for the stop/check stem will be flush with the valve cap.
Install Optional Thermometer using pipe sealant or teflon tape.
Check for leaks by pressurizing unit SLOWLY.
Valve appearance may differ slightly.
Check
Stop
Nut
Thermometer
Tempered
Water (to
Fixture)
HOT
Slotted Cover
Screw
Stop/Check
Cover Screw
Water
Recirculation
Plug
COLD
2
3
Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off, check to make sure the cold water is significantly reduced. If the cold water is reduced properly, reopen the hot water supply.
Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off, check to make sure that the hot water flow has shut down. If hot water is shut down, reopen cold water supply. Test unit weekly for proper function and desired set temperature.
Adjust Temperature with Water Running
Check the temperature when approximately 10 GPM water flow is reached (equivalent to four standard showers).
This device must be checked for final temperature and adjusted as necessary. The standard preset factory temperature setting is 105°F (40°C). [the
range of the valve is 90°F – 120°F (32°C – 49°C)].
Consult proper medical and/or safety authorities for the optimum temperature recommended for your particular application.
Test Unit
DO NOT SKIP THIS STEP!!!
5/32" Allen Wrench
Temperature
Set Screw
H
Slotted
Cover Screw
C
Bradley • 215-1302 Rev. K; ECN 14-09-029 11/7/2014 3
Page 4
S59-3130 Installation
4
Optional Water Recirculation Setup
Recirculating the water in the system provides constant regulation of the water temperature. Flush the supply lines thoroughly after completing installation. Close off all fixtures and label them as not available for use durin g the recirculating process.
Check Valve
(Typ)
Tempered Water Flow
COLD
Cold
Water
Heat
Trap 28"
Drop
Check Valve
Temperature Switch
Alternate
Recirculation (more
HOT
Water
Heater
1. Turn off the recirculating pump and turn on the water supply (a water flow rate of 10-15 GPM is required).
2. Let the water run through the system until a consistent temperature is obtained. If you do not obtain the required temperature, refer to step #2 on previous page for temperature readjustment.
3. As soon as the water reaches the proper temperature, turn on the recirculating pump (make certain the proper system temperature has been achieved before proceeding).
4. Check the water temperature at the return pump. If the temperature exceeds the appropriate level by 2°F, adjust the temperature high-limit switch (this will turn off the pump). Wait until the return water temperature is 5°F below the appropriate level and adjust the low-limit switch (this will turn the pump back on).
5. Open the balancing valve completely.
6. Turn off all fixtures and make sure there is no water running through the system (the cold inlet pipe should feel warm to the touch).
7. Let the system run for 30 minutes or longer without water. If, after 30 minutes, the water temperature increases, you may readjust the temperature by slowly closing the balancing valve until the appropriate temperature is reached.
Storage
Tank
than 5 GPM)
Return Flow
Balancing
Valve (Typ)
Recirculated
Tempered
Water
Recirculating
Pump
4 11/7/2014 Bradley • 215-1302 Rev. K; ECN 14-09-029
Page 5
Installation S59-3130
Troubleshooting Thermostatic Mixing Valve
Before attempting to troubleshoot the valve or disassemble the components, check for the following:
• Stop/check valves are fully open (the slotted stem must be flush with the stop/check cap) and that all inlet and outlet shut-off valves are open
• Hot and cold inlet pipes are connected properly, and that there are no cross-connectio ns or leaking stop/check valves
• Water heater output is at least 15° F above the set temperature.
Be sure to close the appropriate shut-off valves prior to disassembly of the valve and reopen the valves after inspection and repair is complete.
Valve appearance may differ slightly.
Problem Cause Solution
External leaks in the system
No hot water flow (cold water flow only)
Limited water flow The inlet shut-off valve may be partially
Temperature fluctuation or improper Temperature
Either the NPT joints or the o-rings have been damaged.
The thermostat has failed and, subsequently, the safety shut-off has engaged.
closed or there has been a significant decrease in water pressure.
Dirt and debris have collected on the check screen or seat, limiting the movement of the stop and checks.
The stop and check sections of the valve do not move freely.
Thermostat is slowly failing. Check Thermostat as described above, or replace.
Inlet supply line to the mixing valve is being shared by other pieces of equipment that are used only periodically, such as laundry appliances or washdown stations. It may reduce the inlet pressure to the mixing valve to less than 10 PSI. The supply line size may not be large enough to supply both the valve and the other appliances.
Recirculation is not balanced. Review recirculation set up on page 5.
Piston does not move freely and must be cleaned.
Replace the NPT joints and/or o-rings where necessary. For replacement of o-rings, contact your Bradley representative and ask for O-Ring Seal Kit (S65-215).
Inspect Thermostat:
1. Remove the top cap and pull out the push rod and thermostat.
2. Insert a 7/16" dia. rod into the thermostat bellows.
3. Mark the length of the thermostat bellows (at room temperature, with 10 lb. of force, the bellows length should be approx. 2-25/35" to 3-1/4").
4. If the thermostat bellows length is not in the proper range, the thermostat must be replaced (it cannot be repaired). Contact your Bradley representative and ask for Thermostat Kit (S65-194).
Clean Stop and Check Valves:
Remove the stop and checks, clean the screen and seat and reassemble the valve. Do not remove the seat. The components may be scraped with a screwdriver to remove debris. A pair of tweezers works well for pulling debris out from the seat. If the stop and checks need to be replaced, contact your Bradley representative and ask for Check/Stop Kit (S65-
212).
Clean Stop and Check Valves as described above.
Enlarge the supply line size, reconfigure the supply line or regulate the supply usage.
See next page for piston disassembly and cleaning directions.
Stop/Check
Valve
Stop/
Check
Strainer
Valve
Seat
Bradley • 215-1302 Rev. K; ECN 14-09-029 11/7/2014 5
Page 6
S59-3130 Installation
Troubleshooting: Piston Disassembly and Cleaning
WARNING! To prevent injuries, use proper protective
equipment for eyes and skin when using a propane torch.
Remove the valve’s top cap and pull out the thermostat and push rod. You may use a needle-
A
nose pliers to remove the thermostat from the valve body if desired.
Insert a 7/16" dia. rod into the valve and into the piston overheat chamber. Mark the length of the rod inside the valve. Push the rod until the piston
B
stops and mark the new length.
If the rod travels less than 9/16", the piston is not moving freely within the liner and they must be cleaned:
1. Remove the control section assembly, top cap and thermostat.
2. Unthread the liner from the cap (it is glued
C
together; the o-rings must be removed and heat should be applied to melt the glue and loosen the liner).
3. Clean the piston and liner with any cleaner suitable for brass and stainless steel (400-grit sandpaper may be used to polish and hone the piston and liner).
7/16" Rod
Top Cap
Thermostat
Valve appearance may differ slightly.
The second mark
should be 9/16" higher
on the rod than the
first mark.
Piston Overheat
Chamber
Push the mechanism up and down several times to make sure the piston moves smoothly and consistently. If it is not consistent, repeat Procedure C until it moves freely, or replace.
D
Contact your Bradley representative and ask for Piston/Liner Kit (part number S65-216).
6 11/7/2014 Bradley • 215-1302 Rev. K; ECN 14-09-029
Page 7
Installation S59-3130
Parts Breakdown
34
33
32
31
30
29
28
27
26
25
24
23
10
9
8
7
6
5
4
3
14
13
12
11
22
21
20
19
18
17
16
15
Thermometer
Thermostat Kit S65-194
Item Qty. Description
12 1 Thermostat 14 1 O-Ring 19 1 O-Ring
Piston & Liner Kit S65-216
Item Qty. Description
2 1 O-Ring 3 1 Liner 4 1 Washer 5 1 Screw 6 1 Spring 7 1 Lower
Chamber 8 1 Spring 9 1 Washer
10 1 Piston 11 1 Upper
Chamber
2
Valve Body
Washer/Seal Kit S65-320
Item Qty. Description
4 1 Washer
9 1 Washer 26 2 Washer 27 2 Seal
O-Ring Kit S65-215
Item Qty. Description
2 1 O-Ring 14 1 O-Ring 15 1 O-Ring 16 1 O-Ring 19 1 O-Ring 23 2 O-Ring 31 2 O-Ring 33 2 O-Ring
Brass Pipe
Plug (1" IPS)
Check/Stop Kit S65-212
Item Qty. Description
23 2 O-Ring 24 2 Seat 25 2 Nut 26 2 Washer 27 2 Seal 28 2 Holder (for
Seal) 29 2 Spring 30 2 Strainer 31 2 O-Ring 32 2 Stem 33 2 O-Ring 34 2 Cap
Kit numbers for rough brass finish. Contact Bradley for other configurations.
Center Section Kit S65-301
Item Qty. Description
2 1 O-Ring 3 1 Liner 4 1 Washer 5 1 Screw 6 1 Spring 7 1 Lower Chamber 8 1 Spring
9 1 Piston 10 1 Push Rod 11 1 Upper Chamber 12 1 Thermostat 13 1 Push Rod 14 1 O-Ring 15 1 O-Ring 16 1 O-Ring 17 1 Control Cap 18 4 Bolt 19 1 O-Ring 20 1 Top Cap 21 1 Set Screw 22 1 Screw