Bradley Corporation S19-430EH User Manual

Installation
S19-430EH
douche oculaire Kit de rociador para unidades de
lavaojos
Table of Contents
Pre-Installation Information ...................... 2
Installation (eyewash unit) ....................... 3
Installation (combination unit) .................... 4
Installation (Halo™) ............................ 4
Assembly of Components and Parts List ........... 5
Table des matières
Avant l’installation ............................. 6
Installation (unités de douche oculaire)............. 7
Installation (unités de combiné)................... 8
Installation (Halo™) ............................ 8
Assemblage des composantes et liste des pièces .... 9
Contenido
Información previa a la instalación ............... 10
Instalación (unidades de lavaojos) ............... 11
Instalación (unidades de combinada) ............. 12
Instalación (Halo™) ........................... 12
Armado de los componentes y lista de piezas ...... 13
215-868 Rev. L; ECN 12-05-003C © 2012 Bradley Page 1 of 13 10/22/2012
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE 800.BRADLEY (800.272.3539) FAX 262.251 5817 bradleycorp.com
S19-430EH Installation
IMPORTANT
Installation
R
WI 53051
alls,
HENTLICH ZU WEEK WÖC
P.O. Box 309, Menomonee F
DAIRE
e(s) each week and sign
UNIT EACH
y malfunctions immediatel
hentlich im
TEST THIS
hrift. Jeglic
DIESES GERÄT 1ST ESSAI HEBDOMA
Test-operate valv Report an
Ventil(e) wöc
t immédiatement.
durch Untersc
Test le fonctionnement des v signe en bas. S'il y à quelqu
un rappor
Date
Datum Date
114-051
PRÜFEN.
Testbetrieb prüfen, he Störung sofor
Signed Unterschrift
below.
bestätigt t melden.
y.
alves chaque semaine et e chose qui ne v
Date Signed
Signe
THIS SIDE UP
a pas fait
Signed Signed
Date Date
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
Packing List
Read this installation manual completely to ensure proper installation, then file it with the
owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.
com or call 800.BRADLEY (800.272.3539).
Product warranties and service parts information may also be found under ”Products” on our
web site at bradleycorp.com.
2
10/22/2012 Bradley • 215-868 Rev. L; ECN 12-05-003C
Installation S19-430EH
Installation for Eyewash Units
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
• Pipe sealant
• Hardware to mount wall bracket to wall
Close the water supply before connecting the hose assembly.
Apply pipe sealant (supplied by installer) to all male threaded pipe joints.
Use a strap wrench around the yellow pipes to prevent marring.
Step 1: Mount the hose and wall bracket
1. Connect the pipe nipple and the pipe tee to the eyewash valve.
2. Mount the wall bracket to the wall with hardware supplied by the installer. Mount in a location unobstructed to the user.
Step 2: Connect the water supply
1. Connect the ½" NPT water supply piping to the pipe tee.
2. Open the water supply line. Test for leaks and adequate water flow.
Standard eyewash unit is shown. Other units are similar.
½" NPT
Pipe
Nipple
Eyewash
Valve
Supply Inlet
Spray
Hose
Wall
Bracket
Tee
Bradley • 215-868 Rev. L; ECN 12-05-003C 10/22/2012
3
S19-430EH Installation
Installation for Combination Units
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
• Pipe sealant
• Hardware to mount wall bracket to wall
Close the water supply before connecting the hose assembly.
Apply pipe sealant (supplied by installer) to all male threaded pipe joints.
Use a strap wrench around the yellow pipes to prevent marring.
Step 1: Connect the hose and water supply
1. Remove the 3¹⁄₈" pipe connected to the eyewash valve.
2. Connect one pipe nipple, the pipe tee, and the other pipe nipple (in that order) between the eyewash valve and the union (or hub, for Halo units).
3. Mount the hose clip to the vertical piping using the hardware provided or mount the wall bracket to the wall with hardware supplied by the installer. Mount in a location unobstructed to the user.
4. Open the water supply line. Test for leaks and adequate water flow.
Standard combination unit is shown.
Other units are similar.
Hose
Clip
Spray
Hose
Tee with
pipe
nipples
Union
Standard Halo unit is shown. Other
units are similar.
Hose
Clip
Spray
Hose
Tee with
pipe
nipples
Hub
Eyewash
Valve
Eyewash
Valve
4
10/22/2012 Bradley • 215-868 Rev. L; ECN 12-05-003C
Loading...
+ 9 hidden pages