Installation
S19-430A
Hand-Held Drench Hose (Yellow) with
Hose Holder
Douchette à boyau mobile (jaune) avec
support à boyau
Manguera rociadora de mano
(amarilla) con portamanguera
S19-430D
Hand-Held Drench Hose (Stainless
Steel) with Hose Holder
Douchette à boyau mobile (acier
inoxydable) avec support à boyau
Manguera rociadora de mano (acero
inoxidable) con portamanguera
Table of Contents
Pre-Installation Information ......................... 2
Installation Instructions ............................ 2
Components and Parts List ......................... 3
Table des matières
Avant l’installation ................................ 4
Instructions d’installation ........................... 4
Composantes et Liste des pièces .................... 5
Contenido
Información previa a la instalación ................... 6
Instrucciones de instalación ........................ 6
Componentes y Lista de piezas ..................... 7
215-144 Rev. X; ECN 15-05-010
© 2015 Bradley
Page 1 of 7 3/31/2015
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251 5817
bradleycorp.com
S19-430A, S19-430D Installation
IMPORTANT
Installation
R
WI 53051
alls,
HENTLICH ZU
WEEK
WÖC
P.O. Box 309, Menomonee F
DAIRE
e(s) each week and sign
UNIT EACH
y malfunctions immediatel
hentlich im
TEST THIS
hrift. Jeglic
DIESES GERÄT 1ST
ESSAI HEBDOMA
Test-operate valv
Report an
Ventil(e) wöc
t immédiatement.
durch Untersc
Test le fonctionnement des v
signe en bas. S'il y à quelqu
un rappor
Date
Datum
Date
114-051
PRÜFEN.
Testbetrieb prüfen,
he Störung sofor
Signed
Unterschrift
below.
bestätigt
t melden.
y.
alves chaque semaine et
e chose qui ne v
Date Signed
Signe
THIS
SIDE
UP
a pas fait
Signed
Signed
Date
Date
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
Packing List
•
•
•
•
Read this installation manual completely to ensure proper installation, then file it with the
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain the
missing parts.
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be
“ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed
emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid
should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.
com or call 800.BRADLEY (800.272.3539).
Product warranties and service parts information may also be found under ”Products” on our
web site at bradleycorp.com.
Installation
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.
Supplies Required:
• Teflon tape and/or pipe sealant
• ½" NPT water supply inlet (30–90 psi)
• #10 screw to mount hose holder (anchor optional)
• Backflow prevention device as required by UPC, IPC and/or local plumbing codes
Step 1: Mount the Hose
1. Rough in ½" NPT supply piping (by installer) from the wall where the hose holder will be mounted.
2. Mount the hose holder to the wall with a #10 screw (supplied by installer). Install wall anchor if desired.
Step 2: Connect water supply
Apply pipe sealant (supplied by installer) to all male threaded pipe joints.
1. Connect one end of the drench hose to the ½" NPT water supply.
2. Slide the handle over the hose.
3. Install the valve body onto the other end of the hose. Thread the handle onto the valve body.
4. Open the water supply line. Test for leaks and adequate water flow.
2
3/31/2015 Bradley • 215-144 Rev. X; ECN 15-05-010
Installation S19-430A, S19-430D
Assembly of Components and Parts List
9³⁄₈"
(238mm)
2¼"
(57mm)
1
1.1
1.4
3
Water flow rate: 2.2–2.7 gallons (8.3–10.2 liters) per minute.
1.2
1.3
2
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
DateSigned
Datum
Unterschrift
Date
Date
Signe
Date
R
5
Signed
Signed
4
Item Part No. Qty. Description
1 S39-817 1 Sprayhead Assembly
1.1 S27-332 1 Valve, Hose Spray
1.2
S45-2453
1 Service Kit EFW - Black
Sprayheads
1.3 S53-063 1 Dust Cover
1.4 128-182 1 Handle, Drench Hose
Hose Holder Installation
Pipe Mounting
Option
Mount the bracket on the
pipe above the pipe tee
in a suitable location for
unobstructed use.
Item Part No. Qty. Description
2 S45-831 1 Hose Holder Prepack
3 S89-002 1
S89-003 1
Yellow Hose, ³⁄₈" x 8' (for S19-430A)
Stainless Steel Hose, ³⁄₈" x 6' (for
S19-430D)
4 169-059 1
Reducing Coupling, ½" x ³⁄₈"
5 204-421 1 Emergency Inspection Tag
Wall Mounting
Option
Screws and
anchors supplied
by installer.
Bradley • 215-144 Rev. X; ECN 15-05-010 3/31/2015
3