Bradley Corporation S19-270HD, S19-270HW, S19-270JD, S19-270JW, S19274HD Installation Manual

...
Installation
S19-270HD, S19-270HW, S19-270JD, S19-270JW,
Deck-mounted eyewash (S19-270HD) is shown. Wall-mounted eyewash (S19-270HW) is similar.
Une douche oculaire qui est montée au comptoir (S19-270HD) est montrée.
Une douche oculaire qui est montée au mur (S19-270HW) est similaire.
Se muestra una lavador de ojos que se monta a la mostrador (S19-270HD).
Un lavador de ojos que se monta a la mostrador (S19-270HW) es similar.
Deck-mounted eye/face wash (S19-270JD) is shown. Wall-mounted eye/face wash (S19-270JW) is similar.
Une douche oculaire/faciale qui est montée au comptoir (S19-270JD) est montrée.
Une douche oculaire/faciale qui est montée au mur (S19-270JW) est similaire.
Se muestra una lavador de ojos/rostro que se monta a la mostrador (S19-270JD).
Un lavador de ojos/rostro que se monta a la mostrador (S19-270JW) es similar.
S19274HD, S19274HDR, S19274HW, S19274JD, S19274JW
Swing-Down Eyewash and Eye/Face Wash Units, Wall and Deck Mount
Douche oculaire et oculaire/faciale activée par bras mobile, support de mur ou de comptoir
Lavador de ojos y de ojos/rostro activado por brazo oscilante, montaje de la pared o de mostrador
Deck-mounted Halo™ eyewash (S19274HD) is shown.
Deck-mounted Halo™ eyewash (S19274HDR) is similar.
Wall-mounted Halo™ eyewash (S19274HW) is similar.
Une douche oculaire Halo™ qui est montée au comptoir
(S19274HD) est montrée. Une douche oculaire Halo™
qui est montée au comptoir (S19274HDR) est similaire.
Une douche oculaire Halo™ qui est montée au mur
(S19274HW) est similaire.
Se muestra una lavador de ojos Halo™ que se monta a
la mostrador (S19274HD). una lavador de ojos Halo™
que se monta a la mostrador (S19274HDR) es similar.
Un lavador de ojos Halo™ que se monta a la mostrador
(S19274HW) es similar.
Deck-mounted Halo™ eye/face wash (S19274JD) is shown. Wall-mounted Halo™ eye/face wash (S19274JW) is similar.
Une douche oculaire/faciale Halo™ qui est montée au comptoir (S19274JD) est montrée.
Une douche oculaire/faciale Halo™ qui est montée au mur (S19274JW) est similaire.
Se muestra una lavador de ojos/rostro Halo™ que se monta a la mostrador (S19274JD).
Un lavador de ojos/rostro Halo™ que se monta a la mostrador (S19274JW) es similar.
215-1408 Rev. R; ECN 15-05-064 © 2015 Bradley Page 1 of 32 12/16/2015
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817 bradleycorp.com
S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW Installation
Table of Contents
Pre-Installation Information .................................................................. 3
S19-270HD, S19-270HW, S19274HD, S19274HW Dimensions ......................................4
S19-270JD, S19-270JW, S19274JD, S19274JW Dimensions .......................................5
Installation ...............................................................................6
S19-270HD, S19-270HW Assembly of Components............................................... 7
S19274HD, S19274HDR, S19274HW Assembly of Components..................................... 8
S19-270HD, S19-270HW, S19274HD, S19274HW Parts List........................................ 9
S19-270JD, S19-270JW Assembly of Components .............................................. 10
S19274JD, S19274JW Assembly of Components ............................................... 11
S19-270JD, S19-270JW, S19274JD, S19274JW Parts List ........................................ 12
Table des matières
Avant l’installation ........................................................................ 13
S19-270HD, S19-270HW, S19274HD, S19274HW Dimensions .....................................14
S19-270JD, S19-270JW, S19274JD, S19274JW Dimensions ......................................15
Installation .............................................................................. 16
S19-270HD, S19-270HW Assemblage des composantes.......................................... 17
S19274HD, S19274HDR, S19274HW Assemblage des composantes................................ 18
S19-270HD, S19-270HW, S19274HD, S19274HW liste des pièces .................................. 19
S19-270JD, S19-270JW Assemblage des composantes .......................................... 20
S19274JD, S19274JW Assemblage des composantes ........................................... 21
S19-270JD, S19-270JW, S19274JD, S19274JW liste des pièces ................................... 22
Contenido
Información previa a la instalación ........................................................... 23
S19-270HD, S19-270HW, S19274HD, S19274HW Dimensiones ....................................24
S19-270JD, S19-270JW, S19274JD, S19274JW Dimensiones .....................................25
Instalación .............................................................................. 26
S19-270HD, S19-270HW Armado de los componentes ........................................... 27
S19274HD, S19274HDR, S19274HW Armado de los componentes ................................. 28
S19-270HD, S19-270HW, S19274HD, S19274HW lista de piezas................................... 29
S19-270JD, S19-270JW Armado de los componentes ............................................ 30
S19274JD, S19274JW Armado de los componentes ............................................. 31
S19-270JD, S19-270JW, S19274JD, S19274JW lista de piezas .................................... 32
2
12/16/2015 Bradley • 215-1408 Rev. R; ECN 15-05-064
Installation S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW
WARNING
Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
CAUTION
Emergency equipment must be supplied with tepid water (60°F to 100°F/15.6°C to 37.8°C). Any prolonged exposure to near freezing water affects the body's ability to maintain body temperature, increasing the risk of hypothermia.
NOTICE
Before installing this product, ensure that there are adequate clearances around the product and activation of the product does not interfere with other products or obstructions.
Avoid cleaners containing organic solvents, alcohols and hydrocarbons. Rinse with water after cleaning.
IMPORTANT
The installation and location of all safety drench showers, eye and eye/face washes must comply with the requirements of ANSI/ISEA Z358.1.
Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
The ANSI/ISEA Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21MPa) flowing pressure.
Self-closing spring-loaded valves are not UL classified to ANSI/ISEA Z358.1.
Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any sediment build-up in the supply line is cleared. Emergency equipment should be inspected monthly to address any maintenance issues ensuring the equipment is in good operating condition and that there are no signs of wear.
Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI/ISEA Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.com or call 800-BRADLEY (272.3539).
Product warranties and parts information may also be found under ”Products” on our web site at bradleycorp.com.
Supplies Required:
• Piping to ½" NPT water supply inlet on unit
• Pipe sealant
• Sign-mounting hardware
Bradley • 215-1408 Rev. R; ECN 15-05-064 12/16/2015
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from Bradley Corporation.
3
S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW Installation
Dimensions — S19-270HD, S19-270HW (deck-mounted unit shown)
Ø ³⁄₁₆"
¼"
(6mm)
1¼"
(32mm)
Mounting Pattern
Ø ⁷⁄₈"
2¼"
(57mm)
2³⁄₈"
(60mm)
1³⁄₈"
(35mm)
Max.
Off
Deck or Wall
2"
(51mm)
On
3¹⁵⁄₁₆"
(100mm)
7⁷⁄₈"
(200mm)
9½"
(241mm)
3⁵⁄₈"
(92mm)
29³⁄₈"–41³⁄₈" (746mm–1051mm)
to finished floor
Dimensions — S19274HD, S19274HDR, S19274HW (deck-mounted unit shown)
Ø ³⁄₁₆"
¼"
(6mm)
1¼"
(32mm)
Mounting Pattern
Ø ⁷⁄₈"
(57mm)
2³⁄₈"
(60mm)
1³⁄₈"
(35mm)
Max.
2¼"
Off
11¹⁄₈" (283mm) - S19-274HD 9³⁄₈" (238mm) - S19-274HDR
On
Deck or Wall
2"
(51mm)
(51mm)
2³⁄₈"
(60mm)
30⁵⁄₈"–42⁵⁄₈" (778mm–1083mm)
to finished floor
2"
4"
(102mm)
4
12/16/2015 Bradley • 215-1408 Rev. R; ECN 15-05-064
Installation S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW
Dimensions — S19-270JD, S19-270JW (deck-mounted unit shown)
Ø ³⁄₁₆"
¼"
(6mm)
1¼"
(32mm)
Mounting Pattern
Ø ⁷⁄₈"
2¼"
(57mm)
2³⁄₈"
(60mm)
1³⁄₈"
(35mm)
Max.
Off
On
2"
(51mm)
4"
(102mm)
8"
(203mm)
9½"
(241mm)
5"
(127mm)
Deck or Wall
28"–40" (711mm–1016mm)
to finished floor
Dimensions — S19274JD, S19274JW (deck-mounted unit shown)
Ø ³⁄₁₆"
¼"
(6mm)
1¼"
(32mm)
Mounting Pattern
Ø ⁷⁄₈"
2¼"
(57mm)
2³⁄₈"
(60mm)
1³⁄₈"
(35mm)
Max.
Off
On
2"
(51mm)
11¹⁄₈"
(283mm)
Deck or Wall
30"–42" (762mm–1067mm)
to finished floor
3¾"
(95mm)
7½"
(191mm)
3"
(76mm)
Bradley • 215-1408 Rev. R; ECN 15-05-064 12/16/2015
5
S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW Installation
Installation
Halo eye/face wash unit is shown on a sample 25" (635mm) deck. Other units are similar.
Minimum dimensions necessary to contain splashing from Halo units are shown.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints. The top of the eyewash heads should be positioned a minimum of 33" (838mm) and a maximum of 45" (1143mm) from the floor and 6" (152mm) from the nearest obstruction.
Proper faucet shank/handle clearance and recommended minimum splash containment dimensions must be considered when selecting the desired location for mounting.
25"
(635mm)
A
1¼"
(32mm)
Deck Mounting Pattern.
Drill (3) holes as shown.
¼"
(6mm)
Ø ⁷⁄₈"
B
Ø ³⁄₁₆"
Deck
"OFF" Position
11¹⁄₈"
(283mm)
Ref.
15¼"
(387mm)
Ref.
2¹⁄₈"
(54mm)
Min.
D
To
Wall
114-051
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
Connect the water supply using piping (supplied by installer) with
C
½" NPT female threaded end.
"ON" Position
3¾"
(95mm)
Ref.
Slowly open the water supply lines to relieve air and pressurize the valve.
E
Test the unit for leaks
2½"
(64mm)
Min.
and adequate flow.
6
12/16/2015 Bradley • 215-1408 Rev. R; ECN 15-05-064
Installation S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW
Assembly of Components — S19-270HD, S19-270HW
Shown in the "ON" position.
14
Wall
16
13
2
15
S19-270HW Wall-Mount
Eyewash Base shown Base is rotated ¼ turn
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
30
bradleycorp.com
114-051
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
Date
Signed
Datum
Unterschrift
Date
Signe
1
Date Signed Date Date
31
Signed Signed
23
1
Deck
2
13
19
14
21
15
16
Bradley • 215-1408 Rev. R; ECN 15-05-064 12/16/2015
7
S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW Installation
Assembly of Components — S19274HD, S19274HW
Shown in the "ON" position.
14
Wall
16
13
2
15
S19274HW Wall-Mount
Eyewash Base shown Base is rotated ¼ turn
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
30
bradleycorp.com
114-051
1
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Date
Signe
Date
2
31
Signed Signed
19
1
Deck
13
14
15
16
Prepack S65-339 includes items 26, 27, 28 Prepack S88-068 includes items 25, 26, 27, 28
28
27
26
25
22
23
27
26
25
20
28
21
29
Eyewash Cover Prepack S45-2675 includes items 22 and 23
22
23
22
8
12/16/2015 Bradley • 215-1408 Rev. R; ECN 15-05-064
Installation S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW
Parts List — S19-270HD, S19-270HW
Item Part No. Qty Description
1 S65-386CE 1 Replacement Valve Assembly, Swing-
Down Classic Eyewash, Deck-Mount
1 S65-387CE 1 Replacement Valve Assembly, Swing-
Down Classic Eyewash, Wall-Mount
2 160-473 1 Screw, Set
13 160-474 2 Screw, Set
14 113-514 1 Shank, ½" x 2½"
15 142-002CB 1 Washer, Flat ⁷⁄₈" x 2"
Item Part No. Qty Description
16 110-115 1 Nut, Brass ½"-14 NPSM
19 113-1075 1 Pipe, ³⁄₈" x 9" Chrome Red Brass
21 S05-092 1 Eyewash Yoke 90°
23 107-371 2 Tethered Dust Cover
30 114-051 1 Safety Sign
31 204-421 1 Emergency Inspection Tag
Parts List — S19274HD, S19274HDR, S19274HW
Item Part No. Qty Description
Item Part No. Qty Description
1 S65-386 1 Replacement Valve Assembly, Swing-
Down, Deck-Mount
1 S65-387 1 Replacement Valve Assembly, Swing-
Down, Wall-Mount
2 160-473 1 Screw, Set
13 160-474 2 Screw, Set
14 113-514 1 Shank, ½" x 2½"
15 142-002CB 1 Washer, Flat ⁷⁄₈" x 2"
16 110-115 1 Nut, Brass ½"-14 NPSM
19 113-1227 1
19 113-1236 1
20 171-006 1 Body, Mount ³⁄₈" NPT Female
Pipe, ³⁄₈" x 7¼" Chrome Red Brass (S19274HD)
Pipe, ³⁄₈" x 5½" Chrome Red Brass (S19274HDR)
21 S05-190 1 Sprayhead Ass'y Eyewash (includes)
22 in service kit 2 Pivot Pin
23 in service kit 2 Flip Cover, Eyewash
25 115-158 1 Cap
26 125-157 2 O-Ring
27 125-175 1 Flow Control
28 S65-340 1 Screen (incl. 3 per pack)
29 160-500 1 Screw, Weep
30 114-051 1 Safety Sign
31 204-421 1 Emergency Inspection Tag
Bradley • 215-1408 Rev. R; ECN 15-05-064 12/16/2015
9
S19-270HD, -270HW, -270JD, -270JW, 274HD, 274HDR, 274HW, 274JD, 274JW Installation
Assembly of Components — S19-270JD, S19-270JW
Shown in the "ON" position.
14
Wall
16
13
2
15
S19-270JW Wall-Mount
Eyewash Base shown Base is rotated ¼ turn
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
30
bradleycorp.com
114-051
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
Date
Signed
Datum
Unterschrift
Date
Signe
1
Date Signed Date Date
31
Signed Signed
23
1
Deck
2
21a
13
19
14
21
15
16
10
12/16/2015 Bradley • 215-1408 Rev. R; ECN 15-05-064
Loading...
+ 22 hidden pages