Installation
S19-270C, S19-270E, S19274C, S19274E
Swing-Activated Eyewash and Eye/Face Wash
Douche oculaire et oculaire/faciale activée par bras mobile
Lavador de ojos y de ojos/rostro activado por brazo oscilante
S19-270E eye/face wash
douche oculaire/faciale
lavador de ojos/rostro
S19274C Halo™ eyewash
douche oculaire
lavador de ojos
S19274E Halo™ eye/face wash
douche oculaire/faciale
lavador de ojos/rostro
215-1326 Rev. T; ECN 14-05-009 © 2014 Bradley Page 1 of 35 6/13/2014
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817 bradleycorp.com
S19-270C, S19-270E, S19274C, S19274E Installation
Table of Contents
Pre-Installation Information .................................................................. 3
S19-270C, S19274C Dimensions .............................................................4
S19-270E, S19274E Dimensions .............................................................5
Installation .............................................................................6–7
Installation Left-Hand Units ................................................................8–9
S19-270C Assembly of Components and Parts List .............................................. 10
S19274C Assembly of Components and Parts List .............................................. 11
S19-270E Assembly of Components and Parts List .............................................. 12
S19274E Assembly of Components and Parts List............................................... 13
Table des matières
Avant l’installation ........................................................................ 14
S19-270C, S19274C Dimensions ............................................................15
S19-270E, S19274E Dimensions ............................................................16
Installation ........................................................................... 17–18
Installation Gaucher.................................................................... 19–20
S19-270C Assemblage des composantes et liste des pièces....................................... 21
S19274C Assemblage des composantes et liste des pièces ....................................... 22
S19-270E Assemblage des composantes et liste des pièces....................................... 23
S19274E Assemblage des composantes et liste des pièces ....................................... 24
Contenido
Información previa a la instalación ........................................................... 25
S19-270C, S19274C Dimensiones ...........................................................26
S19-270E, S19274E Dimensiones ...........................................................27
Instalación ........................................................................... 28–29
Instalación de Mano Izquierda............................................................ 30–31
S19-270C Armado de los componentes y lista de piezas ......................................... 32
S19274C Armado de los componentes y lista de piezas .......................................... 33
S19-270E Armado de los componentes y lista de piezas.......................................... 34
S19274E Armado de los componentes y lista de piezas .......................................... 35
2
6/13/2014 Bradley • 215-1326 Rev. T; ECN 14-05-009
Installation S19-270C, S19-270E, S19274C, S19274E
IMPORTANT
Installation
R
WI 53051
alls,
HENTLICH ZU WEEK WÖC
P.O. Box 309, Menomonee F
DAIRE
e(s) each week and sign
UNIT EACH
y malfunctions immediatel
hentlich im
TEST THIS
hrift. Jeglic
DIESES GERÄT 1ST ESSAI HEBDOMA
Test-operate valv Report an
Ventil(e) wöc
t immédiatement.
durch Untersc
Test le fonctionnement des v signe en bas. S'il y à quelqu
un rappor
Date
Datum Date
114-051
PRÜFEN.
Testbetrieb prüfen, he Störung sofor
Signed Unterschrift
below.
bestätigt t melden.
y.
alves chaque semaine et e chose qui ne v
Date Signed
Signe
THIS SIDE UP
a pas fait
Signed Signed
Date Date
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
Packing List
Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes/ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit bradleycorp.com or call 800.BRADLEY (800.272.3539).
Product warranties may also be found under ”Products” on our web site at bradleycorp.com.
NOTICE! For classic eye/face wash units, avoid cleaners containing organic solvents, alcohols, and hydrocarbons. Rinse with water after cleaning.
Supplies Required:
• Piping to ½" NPT water supply inlet on unit
• Pipe sealant
• Inlet strainer (recommended)
• Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from Bradley Corporation.
Bradley • 215-1326 Rev. T; ECN 14-05-009 6/13/2014
3
S19-270C, S19-270E, S19274C, S19274E Installation
Dimensions — S19-270C
3¹⁄₈"
(79mm)
4¹⁄₈"
(105mm)
28-7/8" to 40-7/8"
(733 mm to 1038 mm)
to finished floor
11⁵⁄₈"
(295mm)
(64mm)
2½"
Off
On
(60mm)
Ø ⁷⁄₈"
Ø 2³⁄₈"
(60mm)
2³⁄₈"
Ø ³⁄₁₆"
Ø 1¹⁄₈"
2"
(51mm)
Mounting Pattern
1³⁄₈"
(35mm)
Max.
Dimensions — S19274C
1⁵⁄₈"
(41mm)
2⁷⁄₈"
(73mm)
30-1/8" to 42-1/8"
(765 mm to 1070 mm)
to finished floor
2½"
(64mm)
Off
7¼"
(181mm)
On
Ø 2³⁄₈"
(60mm)
2³⁄₈"
(60mm)
Ø ⁷⁄₈"
Ø ³⁄₁₆"
Ø 1¹⁄₈"
2"
(51mm)
Mounting Pattern
1³⁄₈"
(35mm)
Max.
4
6/13/2014 Bradley • 215-1326 Rev. T; ECN 14-05-009
Installation S19-270C, S19-270E, S19274C, S19274E
Dimensions — S19-270E
3¹⁄₈"
(79mm)
11³⁄₈"
(289mm)
5¾"
(146mm)
27-1/4" to 39-1/4"
(692 mm to 997 mm)
to finished floor
Off
2½"
(64mm)
On
2³⁄₈"
(60mm)
Ø ⁷⁄₈"
Ø 2³⁄₈"
(60mm)
Ø ³⁄₁₆"
Ø 1¹⁄₈"
2"
(51mm)
Mounting Pattern
1³⁄₈"
(35mm)
Max.
Dimensions — S19274E
1⁵⁄₈"
(41mm)
3³⁄₈"
(86mm)
29-5/8" to 41-5/8"
(752 mm to 1057 mm)
to finished floor
Off
11"
(279mm)
2½"
(64mm)
On
Ø 2³⁄₈"
(60mm)
2³⁄₈"
(60mm)
Ø ⁷⁄₈"
Ø ³⁄₁₆"
Ø 1¹⁄₈"
2"
(51mm)
Mounting Pattern
1³⁄₈"
(35mm)
Max.
Bradley • 215-1326 Rev. T; ECN 14-05-009 6/13/2014
5
S19-270C, S19-270E, S19274C, S19274E Installation
InstallationEyewash
Halo eyewash right-hand unit is shown on a sample 25" deck. Other units are similar. For classic eyewash installation, refer to the dimensions on page 4 to determine optimal mounting position. Refer to page 8 for left-hand units.
Minimum dimensions necessary to contain splashing from Halo units are shown.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints. The top of the eyewash heads should be positioned a minimum of 33" and a maximum of 45" from the floor and 6" from the nearest obstruction.
Proper faucet shank/handle clearance and recommended minimum splash containment dimensions must be considered when selecting the desired location for mounting.
25"
(635mm)
A
2"
(51mm)
Ø ³⁄₁₆"
Ø 1¹⁄₈"
Deck Mounting Pattern
(drill (3) holes as shown)
8"
(203mm)
Radius
B
"OFF" Position
5¾"
(146mm)
Ref.
2⁵⁄₈" (67mm)
Ref.
Deck
7¾"
(197mm)
Ref.
5¼"
(133mm)
Min.
"ON" Position
Connect the water supply using piping (supplied by installer) with
C
½" NPT female threaded end.
(51mm)
Slowly open the water supply lines to relieve air and pressurize the valve.
E
Test the unit for leaks
2"
Ref.
¾" (19mm)
Min.
D
To
Wall
114-051
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
and adequate flow.
6
6/13/2014 Bradley • 215-1326 Rev. T; ECN 14-05-009
Installation S19-270C, S19-270E, S19274C, S19274E
InstallationEye/Face Wash
Halo eye/face wash right-hand unit is shown on a sample 25" deck. Other units are similar. For classic eye/face wash installation, refer to the dimensions on page 5 to determine optimal mounting position. Refer to page 8 for left-hand units.
Minimum dimensions necessary to contain splashing from Halo units are shown.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints. The top of the eyewash heads should be positioned a minimum of 33" (838mm) and a maximum of 45" (1143mm) from the floor and 6" (152mm) from the nearest obstruction.
Proper faucet shank/handle clearance and recommended minimum splash containment dimensions must be considered when selecting the desired location for mounting.
25"
(635mm)
13⁷⁄₈"
(352mm)
Radius
A
2"
(51mm)
Ø ³⁄₁₆"
Ø 1¹⁄₈"
Deck Mounting Pattern
Drill (3) holes as shown.
B
Deck
"OFF" Position
13"
(330mm)
Ref.
9¼"
(235mm)
Ref.
"ON" Position
2½"
(64mm)
Min.
Connect the water supply using piping (supplied by installer) with
C
½" NPT female threaded end.
Slowly open the water supply lines to relieve air and pressurize the valve.
E
Test the unit for leaks and adequate flow.
Bradley • 215-1326 Rev. T; ECN 14-05-009 6/13/2014
5¾"
(146mm)
Ref.
2¹⁄₈"
(54mm)
Min.
D
To
Wall
114-051
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
7
S19-270C, S19-270E, S19274C, S19274E Installation
Installation — Left-Hand Units (Classic)
Classic eyewash unit is shown. Classic eye/face wash unit is similar.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.
Rotate the bent arm
B
180° around the valve.
Remove the sprayhead from the bent arm. Remove the set screw from the valve assembly with an
A
Allen key (1/16"(1.5mm)). Set the two items aside.
Rotate the bent arm 180° around the valve. Using low strength thread locker, reinstall the set screw
C
into the valve in the new location shown until it bottoms out, then back off ½ turn.
Arm must swing freely.
D
Reattach the sprayhead to the bent arm, resealing as necessary.
Mount the unit onto the deck. Refer to the instructions on page 6 for eyewash units or page 7 for eye/face wash units.
E
The left-hand unit must be installed on the left side of the deck.
Slowly open the water supply lines to relieve air and pressurize the valve. Test
F
the unit for leaks and adequate flow.
8
6/13/2014 Bradley • 215-1326 Rev. T; ECN 14-05-009
Installation S19-270C, S19-270E, S19274C, S19274E
Installation — Left-Hand Units (Halo)
Halo eyewash unit is shown. Halo eye/face wash unit is similar.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.
Rotate the arm 180°
B
around the valve.
C
Remove the set screw from the valve assembly with an
A
Allen key (1/16"(1.5mm)) and set aside.
D
E
Tighten cap assembly, ensuring head is level.
Using low strength thread locker, reinstall the set screw into the valve in the new location shown until it bottoms out, then back off ½ turn.
Arm must swing freely.
Rotate the head and body 180° around the arm.
Loosen the cap assembly with an Allen key (5/16"(8mm)) and rotate the sprayhead 180°.
Mount the unit onto the deck. Refer to the instructions on page 6 for eyewash units or page 7 for eye/face wash units.
F
The left-hand unit must be installed on the left side of the deck.
Bradley • 215-1326 Rev. T; ECN 14-05-009 6/13/2014
G
Slowly open the water supply lines to relieve air and pressurize the valve. Test the unit for leaks and adequate flow.
9
S19-270C, S19-270E, S19274C, S19274E Installation
Assembly of Components and Parts List — S19-270C
Right-hand swivel version is shown in the "ON" position.
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN. ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
31
bradleycorp.com
114-051
30
23
2
19
Deck
21
1
13
14
15
16
Item Part No. Qty Description
1 S65-385CE 1 Replacement Valve Assembly, Side Swing
Classic Eyewash
2 160-473 2 Screw, Set
13 160-474 2 Screw, Set
14 113-514 1 Shank, ½" x 2½"
15 142-002CB 1 Washer, Flat ⁷⁄₈" x 2"
10
6/13/2014 Bradley • 215-1326 Rev. T; ECN 14-05-009
Item Part No. Qty Description
16 110-115 1 Nut, Brass ½"-14 NPSM
19 113-1032 1 Pipe, Bent Plated
21 S05-092 1 Eyewash Yoke 90°
23 107-371 2 Tethered Dust Cover
30 114-051 1 Safety Sign
31 204-421 1 Emergency Inspection Tag
Installation S19-270C, S19-270E, S19274C, S19274E
Assembly of Components and Parts List — S19274C
Right-hand swivel version is shown in the "ON" position.
R
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN. ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
31
bradleycorp.com
114-051
30
19
2
Eyewash Cover Prepack S45-2675 includes items 22 and 23
22
23
22
23
1
21
20
23
27
22
Deck
26
25
13
14
29
15
16
Item Part No. Qty Description
1 S65-385 1 Replacement Valve Assembly, Side Swing
2 160-473 2 Screw, Set
13 160-474 2 Screw, Set
14 113-514 1 Shank, ½" x 2½"
15 142-002CB 1 Washer, Flat ⁷⁄₈" x 2"
16 110-115 1 Nut, Brass ½"-14 NPSM
19 113-1236 1 Pipe, ³⁄₈" x 5½" Chrome Red Brass
20 171-005 1 Body, Mount, Short ³⁄₈" NPT
Item Part No. Qty Description
22 in service kit 2 Pivot Pin
23 in service kit 2 Flip Cover, Eyewash
25 115-169 1 Cap, Short
26 125-157 2 O-Ring
27 125-175 1 Flow Control
29 160-500 1 Screw, Weep
30 114-051 1 Safety Sign
31 204-421 1 Emergency Inspection Tag
21 S05-190 1 Sprayhead Ass'y Eyewash (includes)
Bradley • 215-1326 Rev. T; ECN 14-05-009 6/13/2014
11
Loading...
+ 24 hidden pages