2 | Contents
6 720 648 162 (2011/08)
Contents
1 Safety Considerations and Symbol
Descriptions 4
1.1 Regarding this Manual 4
1.2 Explanation of symbols 4
1.3 Observe the following Symbols 4
1.3.1 Installation Guidelines 5
1.3.2 Boiler Room Guidelines 5
1.4 Tools, Materials and Accessories 5
1.5 Disposal 6
2 Product description 7
2.1 Intended use 7
2.2 Certification and testing mark 7
2.3 Notes on installation and operation 7
2.4 Heating system water quality 7
2.5 Product description 7
2.6 Pack contents 8
2.7 Dimensions Specifications 9
2.7.1 Bosch Uni 5000F dimensions 9
2.8 Conditions for operation 10
2.8.1 General operating conditions 11
2.8.2 Conditions for the boiler room and the
environment 11
2.8.3 Combustion air supply conditions 12
2.8.4 Conditions, Fuel 12
2.8.5 burner selection 13
2.8.6 Conditions power supply 13
2.8.7 Conditions for hydraulic system and water
quality 14
3 Moving the boiler 15
4 Installing the boiler 16
4.1 Wall clearances 16
5 Boiler block assembly 17
5.1 Assembly when delivered in sections 17
5.1.1 Preparing boiler sections 17
5.1.2 Preparing push nippples and nipple ports 18
5.1.3 Preparing the intermediate section 18
5.1.4 Inserting the section sealing 19
5.1.5 Knock intermediate section into place 19
5.1.6 Boiler section alignment 19
5.1.7 Join boiler sections by the nipples at the top
and bottom boiler hub 20
5.1.8 Fitting the anchor rods 21
5.1.9 Fitting distribution tube and supply/return
header 22
5.1.10 Sealing the sensor well 23
5.1.11 Positioning the flue outlet 23
5.1.12 Sealing boiler hubs 23
5.2 Check for leaks 24
5.2.1 Preparing for a leak test). 24
5.2.2 Leak test 24
5.3 Installation when the boiler is supplied
assembled 24
5.4 Installation steps for disassembled and
assembled delivery 25
5.4.1 Fitting adjustable feet 25
5.4.2 Insert the flue gas baffle plates 25
5.4.3 Installing the burner door 26
5.4.4 Fitting the boiler jacket 26
5.5 Positioning and leveling the boiler 29
6 Installing the boiler 30
6.1 Flue pipe installation 30
6.1.1 Chimney venting 30
6.2 Fitting the water connections 31
6.2.1 Fitting the B-kit 31
6.2.2 Installation of boiler drain (included in B-Kit) 31
6.2.3 Installing system components 32
6.3 Filling the heating system and checking for
leaks 32
6.4 Mounting the burner 33
6.5 Connecting the fuel supply 34
6.6 Installing aquastat 34
6.7 Blocked vent switch (required in Canada) 34
6.8 Electrical connections 34
6.9 Jacket panel installation 35
7 Commissioning the heating system 36
7.1 Bringing the system up to operating pressure 36
7.2 Checking the safety valve 36
7.3 Preparing the heating system for operation 36
7.4 Starting up the burner 36
7.5 Notes on commissioning the burner 36
7.6 Raising flue gas temperature 37
7.6.1 Removing flue gas baffle plates 37
7.6.2 Removing the blocking plate 38
7.7 Manual reset high limit (STB) 38
7.8 Installing jacket panels 38
7.9 Commissioning log 39
8 Shutting down the heating system 40
8.1 Shutting down normally 40
8.2 Shutting down the heating system in an
emergency 40