Blodgett SB-16E, SB-10E, SB-6E User Manual

SB-6E, SB-10E and SB-16E

BLODGETT OVEN COMPANY

CONVECTION STEAMER ON AN ELECTRIC BOILER BASE

INSTALLATION – OPERATION – MAINTENANCE
44 Lakeside Avenue, Burlington, Vermont 05401 USA Telephone: (802) 658-6600 Fax: (802) 864-0183
www.blodgett.com
S00047 Rev E (1/17)
1
IMPORTANT NOTES FOR INSTALLATION AND OPERATION
symbol to avoid possible injury or death.
th.
thoroughly before installing, operating or servicing this equipment.
company to perform maintenance and repairs.
Intended for commercial use only. Not for household use.
This manual should be retained for future reference.
It is recommended that this manual be read thoroughly and that all instructions be followed carefully.
This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this
WARNING: Improper installation, operation, adjustment, alteration, service or maintenance can cause property damage, injury or dea Read the installation, operating and maintenance instructions
CAUTION: Operating, testing, and servicing should only be performed by qualified personnel.
NOTICE: Contact the factory, the factory representative or local service
2
TABLE OF CONTENTS
DESCRIPTION
Important Notes .......................................................................................................... 2
1.0 Service Connections ............................................................................................ 4
2.0 Installation Instructions ........................................................................................ 5
3.0 Operating Instructions ......................................................................................... 6
4.0 Periodic Maintenance ......................................................................................... 10
5.0 Troubleshooting..................................................................................................... 14
6.0 Cooking Chart ....................................................................................................... 15
PAGE
3
1.0 SERVICE CONNECTIONS
REAR FLANGED FOOT DETAIL
7/16" [11mm] HOLES ON 2.5 [63] B.C.2 EQUALLY SPACED Ø
S
6 [152]
5.75 [146]
8.75 [222]
28 [711]
16.75 [425]
23 [584]
55.5 [1410] SB-6E
68.50 [1740] SB-10E
67 [1702] SB-16E
DIMENSIONS ARE IN INCHES [MM]
0 [0]
3.5 [89]
8.75 [222]
16.75 [425]
18 [457]
(36" CABINET)
2.75 [70]
2.5 [64]
24 [610]
22 [559]
33 [838]
27.5 [699]
S
S
36 [914]
18 [457]
4.5 [114]
10 [254]
11.13 [283]
29.75 [756]
24.75 [629]
33 [838]
SB-16E TOP VIEW
3.5 [89]
2.5 [64]
SB-6E & SB-10E TOP VIEW
ELECTRICAL CONNECTION: Rating to be as specified on data plate. COLD WATER: 3/8" O.D. tubing at 25-50 PSI (170-345 kPa) STEAM TAKE-OFF CONNECTION: 3/4"IPS optional to operate adjacent equipment. DRAIN: 2" IPS piped to open floor drain. No Solid Connectio n.
S
Water quality is the major factor affecting the performance of your appliance. If you are unsure of water qu ality, consult a local water treatment specialist and have the water analyzed. Your water supply must be within these general guidelines:
Water which fails to meet these standards should be treated by installation of water conditioner. FAILURE OR MALFUNCTION OF THIS APPLIANCE DUE T O POOR WATER QUALITY IS NOT COVERED UNDER WARRANTY.
Total dissolved solids Total alkalinity Silica Chlorine pH Factor
Less than 13 PPM Less than 1.5 PPM
7.0-8.5
WATER QUALITY STATEMENT
Less than 60 PPM Less than 20 PPM
ELECTRICAL CHARACTERISTICS
24
48
42, 48
STD.
Available kW
OPT.
36, 42, 48
48
42
36
3
33116.6
99.9
PHASEkW
24 3
208V
66.6
72.9
54.7
380V
63.8
36.5
110.2
94.5
115.5
101
86.6
AMPS PER LINE
240V220V
63 57.8
66.8
58.4
50.1
57.7
50.5
43.3
415V
33.4
480V
28.9
N/A
126
46.2
40.4
34.6
600V
23.1
MODEL
SB-6E SB-10E SB-16E
36 42
4
2.0 INSTALLATION INSTRUCTIONS
electrical codes.
IMPORTANT: If your equipment was supplied with split water lines and a filter,
Ideally an exhaust system should be located directly above the appliance to exhaust steam and heat generated by the appliance.
1. Set the unit in place and level using a spirit level.
2. Ascertain that a floor drain (open gap) is convenient to the appliance drain.
3. Mark hole locations on floor through anchoring holes provided in flanged adjustable feet.
4. Remove appliance and drill holes in locations marked on floor and insert proper anchoring devices.
5. Set unit back in position and re-level left to right and front to back.
6. Bolt and anchor appliance securely to the floor.
7. Seal bolts and flanged feet with Silastic or equivalent compound.
8. Make service connections as indicated.
The drain piping must consist of temperature resistant material, greater than 160°F, and be of adequate diameter not to cause flow restriction. Improper materials may deform and cause restrictions, thus affecting performance.
connect the filter system to the connection marked “BOILER FEED” only. Make a second connection to the “CONDENSER FEED” from a cold and unfiltered water supply.
WARNING: Electrical and grounding connections must comply with applicable portions of the National Electrical Code and/ or other local
WARNING: Disconnect electrical power supply and place a tag on the disconnect switch to indicate that you are working on the circuit.
Use copper wire suitable for at least 200 degrees Fahrenheit (90 degrees Celsius). The steamer must be grounded. The wiring diagram is located on the inside right hand panel as you face the steamer.
5
3.0 OPERATING INSTRUCTIONS
BOILER SECTION
Electrically powered steam generators are available with standard boiler controls or ASME CSD-1 compliant controls. In addition to the ON/OFF power switch and indicator pilot light on the standard controls, the CSD-1 controls come with four more indicator pilot lights and a “Reset” switch. Follow the appropriate instructions for each.
Start-up Procedure, Standard Controls
1. Turn on water and power supply to appliance.
2. Close the manual blowdown valve if the units is not equipped with the optional automatic blowdown valve.
3. Open door of cabinet and turn on Power Switch. Pilot light will come ON and water will begin to enter boiler. Once water level has reached the proper operating level as indicated on water gauge glass the heating elements will be energized and heat the water. When steam pressure has reached 11 psi the elements will de-energize and cycle on and off between 9 - 11 psi. The boiler is now ready for steam generation.
Start-up Procedure, CSD-1 Controls
1. Turn on water and power supply to appliance.
2. Close the manual blowdown valve if the units is not equipped with the optional automatic blowdown valve.
3. Open cabinet door and turn "ON" power switch. The green pilot light will come "ON.” Water will begin to enter the boiler. When enough water has entered the boiler the (red) “Low Water” pilot will come on for approximately 10 seconds and then the (amber) pilot light will come.
4. Press the “Reset” switch to begin boiler operation. The “Standby” pilot light will go off
and the boiler will begin operation. When steam pressure has reached 11 psi the elements will de-energize and cycle on and off between 9 - 11 psi. The boiler is now ready for steam generation.
6
3.0 OPERATING INSTRUCTIONS (Continued)
Normal Boiler Operating Cycle
Water Fill Cycle On the initial filling of the boiler, units equipped with CSD-1 controls require that the
“Reset” switch be pressed to initialize the safety lockout circuit. Once the water in the boiler has reached proper level, the level control will stop the flow of water to the boiler. As water is consumed in the production of steam, the level control will supply and maintain safe water level in the boiler.
Firing Cycle The elements are operated by pressure sensing devices. On initial operation, the boiler
should reach 11 psi in approximately 15 minutes. At this point the operating pressure switch will open, de-energizing the elements. When the pressure drops to 9.0 psi, the pressure switch closes, energizing the elements.
Condensing Drain, (Optional) A thermostat is located in the drain assembly and is activated by the temperature of
steam. The thermostat operates the cooling solenoid, supplying water to the drain to condense the steam.
Automatic Blowdown Valve, (Optional) If the unit has an automatic blowdown valve, it is activated when the main power switch
is turned “ON”. The boiler will drain when the main power switch is turned "OFF.”
Safety Lockout Conditions High Temperature Condition, Standard Controls A high temperature safety device is installed on the boiler. Should the temperature
exceed the limit of this device, the boiler will be shut down. As the temperature returns to a safe level, normal boiler operation will resume.
High Temperature Condition, CSD-1 Controls A high temperature safety device is installed on the boiler. Should the temperature exceed
the limit of this device, the boiler will be shut down and switch to a state of lockout. The “Temperature” pilot light (red), and the “Standby” pilot (amber), will come on.
7
3.0 OPERATING INSTRUCTIONS (Continued)
High Pressure Condition, CSD-1 Controls A high pressure safety switch is installed on the boiler. Should the pressure exceed the
limit of this device, the boiler will be shut down and switch to a state of lockout. The “Pressure” pilot light (red), and the “Standby” pilot (amber), will come on. Should this device fail to operate, the safety relief valve will open.
Low Water Condition, Standard Controls A low water safety cut off is supplied with the boiler. Should the water level fall below
normal operating levels, the boiler will shut down. If the water level is returned to a safe level, normal boiler operation will resume.
Low Water Condition, CSD-1 Controls A second low water safety cut off is supplied with the boiler. Should the water level fall
below normal operating levels, the boiler will shut down and switch to a state of lockout. The “Low Water” pilot light (red), and the “Standby” pilot (amber) will come on.
SHUT DOWN Turn off power switch, open manual drain valve. If unit is equipped with automatic
blowdown valve, it will open and drain the boiler.
8
COOKER SECTION
CAUTION: Live steam and accumulated hot water in the compartment may be released when the door is opened.
Start-up procedures for your steamer must be completed once daily prior to operation (see instruction plate or above for boiler start up procedures). With ready pilot light on, preheat steamer compartment for one minute when the steamer is to be first used for the day or whenever the compartment is cold.
1. Close compartment doors and set timer to “1 minute”.
2. When buzzer sounds, set timer to the “OFF” position.
3. Steamer is now ready for cooking.
4. With cooking compartment preheated and ready pilot light on, place pans of food to be cooked into compartment and shut door.
5. Set timer to cooking time desired. Cooking cycle may be interrupted at any time by opening door and resumed again by closing door.
6. When buzzer sounds, it indicates the end of the cooking cycle and that no more steam is entering the compartment. Cooking pilot light will go off and ready pilot light will come on. Buzzer must be shut off by turning the timer to its off position.
CAUTION: An obstructed drain can cause personal injury or property damage.
Frequently check that the compartment drain and plumbing is free of all obstructions. Never place food containers, food or food portion bags in the cooking compartment in such a way that the compartment drain becomes obstructed.
Each compartment is equipped with a removable drain screen. Frequently check the drain screen for accumulation of food particles. Should food particles accumulate against, or clog the drain screen, remove it, clean it thoroughly and then replace it in its original position.
SHUT DOWN
1. To shut down cooking compartment, set timers to their OFF position and leave doors slightly open.
2. At the end of the day, the steam supply must be shut off. Open the door of cabinet base and turn off power switch. Open manual drain valve. If unit is equipped with automatic blowdown valve, it will open and drain the boiler.
If unit is equipped with CSD-1 controls also refer to separate manual supplied with unit.
9
4.0 PERIODIC MAINTENANCE
Never spray water into electric controls.
NOTICE: Contact the factory, the factory re presentative or local service company to perform maintenance and repairs. Refer to warranty terms.
Be sure to flush your boiler water level control daily. Failure to follow this procedure can cause the control to malfunction resulting in serious boiler damage.
The Boiler Water Level Control installed on your boiler requires periodic maintenance. As boiler water circulates into the float chamber, sand, scale and other sediment may be deposited in the float chamber. While the chamber has been designed with a large accumulation bowl, it is necessary to flush the sediment from the chamber by blowing down the control so that the accumulation of sediment does not interfere with the movement of the float in the control. Control must be flushed at least once a day.
CAUTION: Scald Hazard. Protect yourself. When flushing control, hot water and steam will flow out of the drain.
CAUTION: Disconnect the power supply during cleaning or servicing.
10
CLEANING
1. Keep exposed cleanable areas of unit clean at all times.
2. Thoroughly wash oven cavities, door liners, and pan racks at the end of each day or as required with a mild detergent and water to prevent bacterial growth and odours.
3. Remove drain screens from inside compartment drains. Using a plastic bottle brush and mild detergent, clean inside the drain opening ensuring there is no food residue or blockage. Clean the drain screen and replace in its original position.
4. Wash gasket sealing surface with mild detergent to remove harmful food acids and rinse.
5. Water level control should be opened daily to blow down sediment and scalant.
6. Observe that the water in gauge glass is clean and clear. Extreme murkiness in water indicates inadequate water quality.
7. Safety valve should be tripped during operation once a week to assure that it functions properly.
8. Keep all exposed cleanable areas of unit clean at all times. DO NOT GET WATER IN ELECTRICAL BOX OR ANY ELECTRICAL COMPONENTS.
CAUTION: Take extra caution when blowing down water level control or tripping safety valve as extreme hot water and live steam are present.
11
ADJUSTMENTS
At least twice a year have an authorized service person clean and adjust the unit for maximum performance.
DESCALING BOILER
It is recommended that the boiler be checked every 90 to 120 days for scale build up. Regular maintenance should be carried out at this time.
1. With boiler empty, close manual blowdown valve. If appliance is equipped with
Automatic Blowdown, turn water supply OFF to appliance. Turn power switch ON. This will energize and close the Blowdown valve.
2. Remove 3/4" pipe plug from fitting on left front of boiler.
3. Insert appropriate hose or tube through fitting and pour in (½) half gallon (U.S.) of CLR
Descaling Solution or use the Optional Deliming Assembly DPA-1 available from your dealer.
4. Replace 3/4" pipe plug securely.
5. Open water supply to appliance allowing water to fill boiler to required level.
6. Let appliance cycle. Allow two hours for descaling and cleaning. DO NOT TURN ON
STEAM to the compartments.
7. Open both the blowdown and low water level control valves for complete drainage and
then close both valves.
8. Turn appliance switch ON. When boiler is completely filled turn power switch OFF.
This will rinse and drain boiler. Appliance with manual Blowdown valve must be opened to drain.
9. Complete Step 8 twice to assure boiler is completely rinsed.
10. Appliance is now ready for use.
12
TO CALI BRATE PRESSURE SWITCHES
NOTE: Pressure switches are factory set. Calibration is only required if pressure switches are replaced or if adjustment is required.
Pressure switch range is from 1 to 15 psi. Adjust all settings to maximum on high signal adjustment screw. Adjust in the following sequence:
- High limit pressure switch.
- Override pressure switch.
- Operating pressure switch.
- Turning screw clockwise to increase, counterclockwise to decrease pressure.
- Use relief valve to release pressure from boiler for setting adjustments.
1. HIGH LIMIT PRESSURE SWITCHES Allow pressure to build until unit shuts off. This should occur at 15 psi. Set the high
signal to switch at 14.5 psi on the gauge and the low signal to 13.0 psi.
2. OVERRIDE PRESSURE SWITCHES Allow pressure to increase to 13 psi. Set the high signal to switch at 13 psi on the gauge
and the low signal to 11 psi.
3. OPERATING PRESSURE SWITCHES
Set the high signal to switch at 11 psi on the gauge and the low signal to 9 psi.
4. Release pressure in boiler to below 9 psi. Elements will come on. Once pressure has reached 11 psi, elements will shut off. Repeat this process several times to make sure elements come on at 9 psi and shut off at 11 psi.
Once completed, pressure switches have been calibrated. Should your unit not have the High Limit pressure switch, start procedure at Override
pressure switch. SERVICE
Contact your local authorized service office for any repairs or adjustments needed on this equipment.
13
5.0 TROUBLESHOOTING
DOOR LEAKS
1. Check for damage to door gasket.
WATER ACCUMULATES IN THE COMPARTMENT
1. Compartment drain screen clogged. Remove and clean thoroughly and then replace.
WATER NOT BEING SUPPLIED TO BOILER
1. Water supply is “OFF”.
2. Defective water fill solenoid.
3. Water level control clogged or defective, unable to operate fill valve.
4. Check drain valve is closed. Also check that water level control valve is closed.
5. Supply water pressure too low.
AUTOMATIC BLOWDOWN VALVE DOES NOT DRAIN
1. Defective Blowdown valve.
2. Heat exchanger build up of scalant clogging drain lines and valve.
BOILER ACHIEVES PRESSURE SLOWER THAN NORMAL a) Heavy build up of lime on elements. b) Loose element connections. SAFETY VALVE BLOWS
1. Defective safety valve.
2. Pressure too high. Pressure switch requires adjustment (lower) or may be defective.
14
6.0 COOKING CHART
The following table lists suggested cooking times and weights. These times, which will vary depending on initial product temperature, size, shape, etc., are approximate and should be adjusted to suit your operation.

PRODUCTS TO BE COOKED IN SOLID PANS

Product

Eggs, Scrambled 10 - 12 8 Dozen Rice, Long Grain (Cover with 4 cups water/lb) 25 2 Lb Pasta (Place perforated pan inside solid pan, cover pasta with cold
water) Spaghetti - Regular/Vermicelli Macaroni - Shells/Elbows Noodles - ½" Wide Lasagna Noodles
Frozen Casseroles, Lasagna 35 Full Pan Meat Loaf, 3 - 5 Lb Each 40 15 Lb Beef Ground Chuck Slices as Purchased Shrimp, Frozen, 10 Shrimp per Lb 5 4 Lb Beans Baked Refried Canned Vegetables 6 10 Lb Can Prunes, Dried 12 - 15
Timer Setting
in Minutes
12 - 15 15 - 18 12 - 15 15 - 18
20 - 25 35 - 40
9 9
Weight Per
Pan
10 Lb 10 Lb
10 Lb Can 10 Lb Can
15

PRODUCTS TO BE COOKED IN PERFORATED PANS

Product

Clams Frozen Fresh, Cherrystone King Crab, Frozen Claws Legs Lobster Tail, Frozen Lobster, Live, 10" - 12" Salmon Fillets, Frozen, 8 oz Each 5 7 ½ Lb Scallops, Fresh 4 3 Lb Scrod Fillets, Fresh 3 - 5 4 Lb Eggs Hard Cooked Soft Cooked Soft Yolk for Caesar Salad Chicken, Breasts, Legs, Thighs 20 15 Lb Turkey, Frozen Breasts (2) Cut length wise Corned Beef 40 - 75 6 - 8 Lb Hot Dogs or Wieners 3 80 - 100 Count Asparagus Spears Frozen Fresh Beans Green, 2" Cut, Frozen/Fresh Lima, Frozen Baby Lima, Frozen Broccoli Spears, Frozen Spears, Fresh Flowerettes, Frozen
Timer Setting
in Minutes
10 - 12
5 - 6
4 - 6
15
9 - 10
6 - 8
90 55
10 - 12
4
6 5
5
6 8 5
8 6 6
Weight Per
Pan
3 Dozen 3 Dozen
2 ½ Lb 4 ½ Lb
10 Lb
4 Per Pan
4 Dozen 4 Dozen 4 Dozen
6 - 7 Lb Ea.
20 - 25 Lb
3 Dozen
5 Lb
5 Lb 5 Lb 5 Lb
4 Lb 5 Lb 5 Lb
16

PRODUCTS TO BE COOKED IN PERFORATED PANS

Product

Brussel Sprouts, Frozen 6 5 Lb Cabbage, Fresh, 1/6 Cut 8 5 Lb Carrots Baby Whole, Frozen Crinkle Cut, Frozen Sliced, Fresh Cauliflower, Flowerettes Frozen Fresh Celery, 1" Diagonal Cut 7 5 Lb Corn Yellow Whole Kernel, Frozen Cobbettes, Frozen
Corn-On-Cob, Fresh
Peas, Green 6 5 Lb Potatoes, Whole Russet 55 10 Lb Spinach Chopped, Frozen Defrosted Fresh Cut Squash, Acorn, Halves 25 10 Halves Zucchini, Slices 8 10 Lb Frozen Mixed Vegetables 6 - 7 5 Lb Fruit, Blanch for Peeling Grapefruit Oranges Pineapple, Whole for Cutting 4
Timer Setting
in Minutes
7 - 8
11
7 - 8
16-18 10-12 16-18
17
8
6
5 8
5 3
3
Weight Per
Pan
7 Lb 4 Lb 9 Lb
4 Lb 5 Lb
5 Lb 27 Ears 80 Ears 18 Ears 54 Ears
6 Lb
6 Lb
2 Lb
COOKING HINTS Where possible, spread food out evenly in pans. Do not allow food to protrude above
pans, since this will interfere with steam circulation between pans in the compartment. Always preheat compartments for satisfactory results. When time does not allow for
defrosting of frozen vegetables, such as loose-pack peas, corn diced carrots, etc., they may be cooked at once provided just half of the suggested portions in the cooking chart are used.
17
Loading...