UL Lis ted Proprietary Alarm
System Installation Guide
Electronic Version
Andover Controls Corporationi
Downloaded from - http://www.guardianalarms.net
Reproduction or d istribution forbidden.
Copyrigh t 1995 by Andover Cont rols.
Subject to change without notice.
Copyright
Andover Controls Corporation
300 Brickstone Square
Andover, Massachusetts 01810
All Rights Reserved.
1995
Version A
Order No. 30-3001-478
Published by the Engineering Department at Andover Controls Corporation.
IMPORTANT NOTICE
This product is subject to change without notice. This document does not constitute any
warranty, express or implied. Andover Controls Corporation reserves the right to alter capabilities, performance, and presentation of this product at any time.
This manual uses the following trademarks:
Brooks is a registered trademark of Brooks Power Systems.
Epson is a registered trademark of Epson Corp.
Gateway 2000 is a registered trademark of Gateway 2000.
Infinet is a trademark of Andover Controls Corporation.
Microsoft is a registered trademark of Microsoft Corporation.
All other product names mentioned herein are used for identification purposes and may be
the trademarks or registered trademarks of their respective companies.
iiUL Listed Proprietary Alarm System Installation Guide
Andover Controls Corporationiii
Preface
The Andover Controls UL Listed Proprietary Alarm System Installation Guide
presents requ ireme nts a nd instructions for ins talling the alarm sys tem on an Infinet
network. This document refers you to additional Andover Controls Installation
Guides where appropriate.
ivUL Listed Proprietary Alarm System Installation Guide
Introduction
•The Andover Controls Proprietary Alarm System consists of two major
components:
Central Supervisory Station
—
Premise Control Units
—
•The
•The
Premise Control Units
transmitting the status of these alarms over a supervised signaling bus to the
Central Supervisory Station.
Central Supervisory Station
activity. An individual who is trained to interpret and acknowledge the alarms
received constantly monitors this station. This station consists of three main
elements:
The receiving unit
—
The s u pervised st ation
—
A printer
—
The printer provides a hard copy of all alarm events including where and when
the alarm occurred, the type of alarm, and when and by whom the alarm was
acknowledged.
are responsible for initiating alarms and
provides the focal point for all alarm
Andover Controls Corporation1
Programming
•Only individuals with the appropriate Andover Controls certifications shall
program the Andover Controls Systems.
•Programming of all alarm status changes must meet all of the following criteria:
— Print on alarm
— Print on acknowledgment of alarm
— Print on return to normal
— Beep on alarm
— Beep on return to normal
•The maximum alarm delay must be less than 60 seconds (< 60 seconds).
Hardware Instal lation
Table 1 shows how the alarm priority levels must be set.
Table 1. Alarm Priority Levels
Alarm Priority
LevelAlarm Type
1Industrial supervision w here risk of injury to perso ns or
damage or destruct ion of proper ty m ay be involved
2Hold-up or pa nic alarm
3B urglar Alarm
4Watchman Tour
5B urglar Alarm Supervision
6Industrial supervision w here risk of injury to perso ns or
damage or destruct ion of proper ty is not involved
7O t her supervisory services
2UL Listed Proprietary Alarm System Installation Gu ide
Hardware Installation
Table 2 identifies the Andover Controls products listed in the UL Proprietary
Burglar Alarm Systems category, their role in the listing, and the part numbers
for their detailed installation/programmers guides.
•Locate the equipment in a secure indoor location on the property being
protected.
•Maintain the ambient temperature at 55°- 95° F.
•Supply the HVAC equipment controlling the ambient with a twenty-four hour
standby power source.
•Indicate the loss of AC power by an audible and visual signal.
Hardware Instal lation
Equipment Requirements
Table 3 lists Central Supervisory Station equipment. Because a redundant Central Supervisory Station is required, you must duplicate all the equipment. Your
Central Supervisory Station equipment must consist of two each of the items
listed.
Table 3. Central Supervisory Station Equipment
Item #Description
1SX8000 version 2.1 loaded into a Gateway 2000 P 5-120
Personal Computer (PC) with a P ow er Cord and a
3Com Media Card
2Viv it ron Monitor w it h Power Cord
3104-Key Keyboard
4Microsoft Mouse
5Eps on LQ570+ Printer with Pow er Cord
6Brooks BN6-6 surge suppressor with On/Off switch,
resettable Circuit Breaker, Pow er Indicator, and Power Cord.
7Andover Cont rols Corpora t ion CX9200 w it h th e appropriate
options (s uc h as ENL)
For additional require ments, see the appropriate ins talla tion guide.
4UL Listed Proprietary Alarm System Installation Gu ide
Hardware Installation
Power Requirements
•The power service and all wiring must comply with the
Code
.
—The computer (Item 1) and the printer (Item 5) must plug into the surge
suppression strip.
—Each surge suppressor (Item 6) requires a standard 120Vac, 15 A, 60 Hz,
grounded receptacle.
•Please see the Andover Controls
3001-347) for the detailed
•All of the Central Supervisory Station equipment must be supplied with a
twenty-four hour standby power source. The loss of AC power shall be
indicated by an audible a visual signal.
For additional requirements, please see the appropriate installation guide.
CX9200 I nstallation Guide
CX9200
(Item 7) power requirements.
National Electrical
Installation—Central Supervisory Station
1. With the equipment located in its proper place, setup and connect the printer
and the PC using the detailed instructions provided with the equipment.
(part number 30-
2. Connect the
appropriate length of Ethernet, 10 base2 cable, and correct terminations.
For detailed communication information and additional set up information please
see the Andover Controls
30-3001-169) and the
CX9200
to the 3Com media card installed in the PC using the
Infinity Network Configuration Guide
CX9200 Installation Guide
(part number
(part number 30-3001-347)
.
Andover Controls Corporation5
Premise Control Units
Site Requirements
Please see the appropriate installation guide.
Power Requirements
•All Premise Control Units must be powered from a UL Li sted Burglar Alarm Power
Supply (APHV) or a Power Supply UL Listed for Fire Alarm Use (UTRZ) capable
of providing four hours of standby power.
•The power supply must also provide a dry contact closure for AC power failure
indication.
•This output must be wired to a supervisory input and must s ignal a status change to
the Central Supervisory Station. This signal must be programmed for the
“supervisory service” level.
Hardware Instal lation
For additional requirements, please see the appropriate installation guide.
Installation—Premise Control Units
•All Premise Control Units must be installed with cabinet tamper switches.
•Leads from all supervisory input circuits, keypads and card reader circuits shall
consist of conductors insulated from and surrounded by a shielding conductive
surface grounded at one end. The maximum loop impedance is 100 ohms.
•All supervisory inputs must be located in the same room or area as the Premise
Control Unit and must use the end of line resistors provided for the Premise Control
Unit (Andover Controls part number 01-0010-666).
For additional instructions please see the appropriate installation guide.
6UL Listed Proprietary Alarm System Installation Gu ide