Andover Controls Energy Link 2000 Installation Guide

Controlling Tomorrow’s World
EnergyLink 2000 Installation Guide
Electronic Version
Andover Controls Corporation i
Downloaded from - http://www.guardianalarms.net
Version A
Copyrigh t  1992–1996 by Andover Controls.
Subject to change without notice.
Order No. 30-3001-179
Copyright
1992–1996
Andover Controls Corporation 300 Brickstone Square Andover, Massachusetts 01810 All Rights Reserved.
Published by the Engineering Departm ent at Andover Controls Corporation.
IMPORTANT NOTIC E
This product is subject to change without notice. This document does not con­stitute any warranty, express or implied. Andover Controls Corpor ation re­serves the right to alte r cap ab ilities, performance , and pres en tation of this product at any time.
ii EnergyLink 2000 Installation Guide
Preface
EnergyLink 2000 Installatio n Guide
The installing the EnergyLink 2000, 2100, and 2101 on EnergyNet. It first presents how to prepare the site, including facts about proper ground­ing, then how to install the various EnergyLinks.
For basic information on local area networks (LANs), refer to the
presents instructions for
EnergyNet and Infinet Configuration Guide
.
Andover Controls Corporation iii
iv EnergyLink 2000 Installation Guide
Installing the EnergyLink 2000
EnergyNet
This manual covers installi ng the have not planned out your network yet, read the
Configuration Guide EnergyLink
s for your installation.
first. It contains details on how to select the best
EnergyL i nks
EnergyNet
on
EnergyNet and Infinet
. If you
Warranty Registration
Your warranty is effective for 18 months star ting on the date the equipment is shipped.
Warning
All wiring must comply with all local , stat e, and nationa l ele ctrical codes.
EnergyLink 2000 Installation Guide 1

Preparing to Install EnergyLinks

Without Acting as central active hubs, the tributed star topology networks.
In addition, cable length for all buses, but also increase the number of controllers al­lowed on a single bus. You can use and to diagnose network problems. The flexible and diverse.
Before you begin, you determine the exact kinds of links you require, and the number of central hubs, cable switching links, and repeaters. If you are not sure what you need or how to order it, read the
and Infinet Configuration Guide
Before you can install the know some basic information about them: the types, their modu les, their dimensions and enclosures, power requirements, grounding re-
EnergyLink
EnergyLinks
s, you can have only a bus topology
EnergyL ink
allow you to not only extend the maximum
EnergyLinks
.
EnergyLink 2000, 2100
s let you form star and dis-
to switch cable types
EnergyLink
, or
EnergyNet
family of links is
EnergyNet
2101
, you need to
.
quirements, and environmental requirem en ts .
Note
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instructions in this manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.
2 EnergyLink 2000 Insta llation Gu ide

EnergyLink Dimensions

Each side a hinged aluminum enclosure that meets UL standards.
The modules that you ordered with the for either all coaxial cable, or mixed coaxial and fiber optic cable, or all fiber optic. Each module is approximately 5.25H × 1W × 7D in.
Modules with coaxial cable ports have four ports. Modules with mixed coaxial and fiber optic cable ports have two coaxial and two fiber optic cable ports.
Each are in sealed aluminum enclosures that meet UL standards.
EnergyLink 2000
EnergyLink 2100
is 5.75H × 10.43W × 8.66D in. The unit is in-
or

Power Requirements

Warning
EnergyLink 2000
2101
is 9.625H × 6.375W × 1.75D. The units
can have ports
Be sure your installation complies with local, state, and national electrical codes.
Caution
EnergyLink 2000
The unswitched circuit. Other
EnergyLink 2000
should receive power from its own independent,
EnergyLink
and do not require their own power source.
s are attached to a controller or
EnergyLink 2000 Installation Guide 3
Table 1. Electrical Specifications
Location Input Power
United States 115 V +/–15%
@ 1/2 A 50-60 Hz
Europe 230 V +/–15%
@ 1/4 A 50-60Hz
Output Power Fuse Size/Rating
+5 V +/–5% @ 3 A 50-60 Hz
+5 V +/–5% @ 1/2 A 50-60 Hz
We ship it set to the correct setting with the correct fuse. If you want to change the setting, follow the ins truc ti ons incl uded in the inst alla tion information.

Building Ground Requirements

Warning
5 × 20 mm Fuse/ 115 V 1 A slow blow
5 × 20 mm Fuse/ 230 V 1/2 A slow blow
Be sure that all products from Andover Controls Corporation is grounded to true earth ground. This kind of ground protects the equipment from lightning strikes and other power surges in the area.
We cannot guarantee that the controller system will operate as documented unless you properly grou nd all control lers .
Warning
Be sure to have your grounds inspected before you begin the installation process to be sure your municipality follows the National
4 EnergyLink 2000 Insta llation Gu ide
Electrical Code.
substandard electrical grounds.
An example of a substandard ground is a galvanized steel cold water pipe. As the pipe corrodes, it does not act as a true ground. The corro­sion acts as an insulator, raising the potential of the pipe with respect to the ground.
When lightning strikes in the area of the ins talla tion, it drastically changes the potential of the earth.
Surges of much lower potential also impact the reliability of Andover Controls equipment.
Since properly grounded Andover Controls units respond to changes in
Many muni cipa lities do not an d often have
potential more rapidly than poorly grounded electrical systems, a poor­ly grounded building tries to reach ground through the Andover Controls system. The surge of current can destroy electronic compo­nents on the controller board.

Inspecting the Ground

You can check your ground as follows:
1. Check your ground by first inspecting the building power distribution panel for earth ground termination. If the ground termination is any of the following, it is not adequate and must be corrected:
Does not exist.
Is connected to a corroded or galvanized pipe.
Is connected using a small gauge wire (smaller than 14 AWG).
2. If your be sure your conductor that terminates at the distribution panel.
EnergyLink 2000 Installation Guide 5
EnergyLink
EnergyLink
will not be mounted inside an
is connected to the ground with a copper
9000
controller,