AMficMi ShmiMd
Installation
Instructions
MOMENTS
T506.50X
BATH/SHOWER TRIM KIT
Congratulations on purchasing your American Standard faucet with
EverClean™ finish a features found only on American Standard faucets.
EverClean™ Finish
• One wipe effortlessly removes spots
• Eliminates the need for cleaners and scrubbing
• Permanent surface protectant remains beautiful
for the life of the faucet
• EverClean™ available on: Polished Chrome, Satin Nickel,
Stainless Steel, Polished Brass (or any combination of these finishes)
To ensure that your installation proceeds smoothly-please read these
instructions carefully before you begin.
Recommended Tools
Flat Blade Screwdriver
Pipe Wrench
Phillips Screwdriver
ROUGHING-IN DIMENSIONS
■ To assure proper positioning in relation to wall, note
roughing-in dimensions.
FINISHED WALL
3/4"” TO 2-3/8"
Plumbers' Putty or Caulking
SHR. 1/2" NOM.
COPPER SWEAT
SWEAT
INLETS
Adjustable Wrench
INLETS
4-1/16"
Certified to comply with ANSI A112.18.1
M968951
Channel Locks
INLETS
1/2" NOM.
COPPER
SWEAT
"SEE ILLUSTRATION
74" FOR
HEAD CLEARANOE
r
18"
OPTIONAL
TOP OF-
TUB RIM
BOTTOM OF
f
8-1/8" REF.
6-1/2"-►
E
___
- 4"
'
TUB
►
r
T
_
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 85" AND 80"
-1/2" NPT
-4-1/2" REF.
3-3/8"-
3-3/8"
OUTLETS-
1/2" NPT
TUB 1/2" NOM.
COPPER SWEAT
SWEAT
INLETS (STOPS)
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
INLETS 1/2" NPT
-------
THREADED INLETS THREADED INLETS (STOPS)
-5-7/8"-
3-3/8"—
|- OUTLETS
1/2" NPT
4-1/16"
INLETS
1/2" NOM.
COPPER
SWEAT
5-7/8" -
EverClean™ Finish Care Instructions
American Standard’s EverClean finish will wipe clean with a soft, dry cloth. A soft cloth with
clean water may also be used, if desired. IMo additional cleaning products are required.
INLETS
1/2" NPT
DO IMOT USE: Soaps, acid, polish, abrasives, harsh cleaners, or a cloth with a coarse surface.
INSTALL VALVE TRIM
Figure "1. Remove plaster guard from valve. Push CAP (1J
over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1)
and attach with LONG SCREWS I4J. Mount ESCUTCHEON
SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT
SCREWS (6).
Figure 3. Align PINS I7] on back side of ESCUTCHEON (8)
with the FOUR HOLES (9) in ESCUTCHEON SUPPORT [5)
and press ESCUTCHEON (8) flush against finished wall.
Figure 2.
INSTALL TUB SPOUT, SHOWER HEAO,
SHOWER ARM WITH FLANGE
CAUTION: Protect finish on SHOWER
HEAD and TUB SPOUT when instailing.
Remove pipe cap and plug from shower and tub
rough piping.
Install SPOUT ESCUTCHEON (1J onto TUB SPOUT (2).
Apply sealant or Teflon tape to threads of tub filler
nipple. Thread TUB SPOUT (2) onto tub nipple.
CAUTION: Protect finish on TUB SPOUT when
installing.
Install SHOWER ESCUTCHEON (3) onto SHOWER
ARM (4J. Apply sealant or Teflon tape to threads on
both ends of SHOWER ARM (4) and thread longer
leg of SHOWER ARM (4) into shower elbow.
Thread SHOWER HEAD (5) onto SHOWER ARM (4).
CAUTION: Protect finish on SHOWER HEAO and
ARM when installing.
SHR.
ELBOW
TUB FILLER
NIPPLE
M968951