Alpha HE33 Instruction

Installation and Servicing
Instructions
Alpha HE25 and HE33
W all Mounted, Fan Assisted, Room Sealed, Gas Fired,
High Efficiency Condensing Boiler Range
For Technical help or for Service call ...
ALPHA HELPLINE
Nepicar House, London Road,
Wrotham Heath, Sevenoaks,
Kent TN15 7RS
British Gas
Service Listed
Alpha HE25 G.C. No. 47 532 41 Alpha HE33 G.C. No. 47 532 43
For use with Natural Gas only
Leave these instructions with the User
CONTENTS
1 Introduction ....................................... 2
2 Technical data...................................3
3 General boiler information.................. 6
4 Installation......................................... 12
5 Commissioning ................................. 18
6 Boiler operation ................................. 23
7 Routine servicing............................... 22
8 Component replacement ................... 26
9 Wiring diagrams ................................ 31
10 Fault finding ...................................... 33
11 Short parts list ................................... 38
12 Benchmark Checklist ........................ 39
13 Service record ................................... 40
1 INTRODUCTION
The Alpha HE range of high efficiency condensing boilers are wall mounted, fan assisted room-sealed boilers. The burner is lit electronically and the heat output is controlled by a modulating gas valve.
The HE25 and HE33 are combination boilers providing both central heating and domestic hot water at mains pressure. The boilers are supplied with a pump, pressure relief valve, expansion vessel and pressure gauge fully assembled and tested.
They are designed for use with a fully pumped, sealed and pressurised central heating system using only Natural gas. The HE25 boiler is suitable for central heating loads of between 14.5 and 25.0 kW (49 500 and 85 300 Btu/h). The HE33 boiler is suitable for central heating loads of between 19.7 and 33.2 kW (67 200 and 113 300 Btu/h). The maximum output available for domestic hot water is 25.0 kW (85 300 Btu/h), capable of providing 9.9 litres/min with a
temperature rise of 35°C for the Alpha HE25 boiler and for the Alpha HE33 boiler - 33.2 kW (113 300 Btu/h), providing 13.2 litres/min with a temperature rise of 35°C.
IMPORTANT
It is the law that all gas appliances are installed by a competent person, i.e. CORGI registered personnel, in accordance with the following recommendations:-
Current Gas Safety (Installation and Use) Regulations All current Building Regulations issued by the Department of the Environment, i.e. Approved Document L1. Building Standards (Scotland) (Consolidation) Regulations issued by the Scottish Development Department UK Water Regulations/Byelaws (Scotland) Health & Safety Document No. 635 (The Electricity At Work Regulations 1989) The installation should also be in accordance with the following British Standard Codes of Practice:­BS 5440:1:2000 Flues
BS 5449:1990 Forced circulation hot water systems BS 5546:2000 Installation of hot water supplies for domestic purposes BS 6700:1997 Design, installation, testing and maintenance of services supplying water BS 6798:2000 Installation of gas fired hot water boilers BS 6891:1998 Gas installation BS 7593:1992 Code of Practice for treatment of water in heating systems BS 7671:2001 Requirements for electrical installations, IEE Wiring Regulations
Reference should also be made to the DEFRA document 'Guide to condensing boiler installation assessment procedure for dwellings'
If installation is in a timber framed building, refer to the Institute of Gas Engineers document IGE/UP/7. This appliance meets the requirements of IPX4D, i.e. degree of protection against moisture. Failure to install this appliance correctly could lead to prosecution. It is in your own interest and that of safety to ensure that the
law is complied with. Manufacturer's instructions must NOT be taken in anyway as over-riding statutory obligations. Notes: 1. Ensure that the Benchmark Checklist has been completed after the boiler has been installed and commissioned.
2. The boilers MUST only be used with Alpha CD condensing flue components.
Alpha HE25 and HE33 - Contents/Introduction
2
2 TECHNICAL DA T A
2.1 PERFORMANCE - NATURAL GAS (CAT: 12H 2H - G20 - 20 mbar)
Alpha HE25
Central Heating
Heat Input kW (Gross) Btu/h Heat Output (condensing) kW (50°C/30°C) Btu/h Heat Output (non-condensing) kW (80°C/60°C) Btu/h Burner mbar Pressure in wg
Room sealed chamber panel fitted
Gas Rate m³/h
ft³/h
Alpha HE33
Central Heating
Heat Input kW (Gross) Btu/h Heat Output (condensing) kW (50°C/30°C) Btu/h Heat Output (non-condensing) kW (80°C/60°C) Btu/h Burner mbar Pressure in wg Gas Rate m³/h
Room sealed chamber panel fitted
ft³/h
MAX.
27.4
93 400
25.0
85 300
24.0
81 900
12.3
4.92
2.61
92.1
MAX.
36.6
124 800
33.2
113 300
32.0
109 200
11.6
4.64
3.49
123.2
MIN.
16.3
55 600
14.5
49 500
14.0
47 800
4.3
1.72
1.55
54.7
MIN.
22.4
76 400
19.7
67 200
19.2
65 500
3.6
1.44
2.14
75.5
Alpha HE25
Domestic Hot Water
Heat Input kW (Gross) Btu/h Output to Water kW (modulating) Btu/h Burner mbar Pressure in wg
Room sealed chamber panel fitted
Gas Rate m³/h
ft³/h
Flow Rate at 35°C Rise L/min
gal/min
Alpha HE33
Domestic Hot Water
Heat Input kW (Gross) Btu/h Output to Water kW (modulating) Btu/h Burner mbar Pressure in wg Gas Rate m³/h
Flow Rate at 35°C Rise L/min
Room sealed chamber panel fitted
ft³/h
gal/min
MAX.
27.4
93 400
25.0
85 300
12.3
4.92
2.61
92.1
MAX.
36.6
124 800
33.2
113 300
11.6
4.64
3.49
123.2
MIN.
11.4
38 900
9.9
33 800
1.9
0.76
1.09
38.5
9.9
2.2
MIN.
15.2
51 800
13.2
45 000
1.2
0.48
1.46
51.5
13.2
2.9
2.2 SYSTEM
Alpha HE25 and HE33
Central Heating (Sealed System)
Max. Working System Pressure Min. System Pressure Max. System Temperature Pressure Relief Valve Setting Expansion Vessel Size (pre-charge press.) Flow Connection Return Connection Relief Valve Connection Recommended System Pressure (cold) CH Water Temp. (Approx. max.)
2.5 bar
0.5 bar 82°C
3 bar (44 PSI)
8 L at 1.0 bar
22 mm 22 mm 15 mm
1.0 bar
82°C (180°F)
Alpha HE25 and HE33
2.3 AVAILABLE PUMP HEAD FOR CENTRAL HEATING
Alpha HE25
Output (50/30°C) Available pump head
kW
25.0
22.0
20.0
14.5
Btu/h 85 300 75 000 68 200 49 500
metres
1.8
2.1
2.4
2.9
feet
6.0
7.0
8.0
9.6
Flow rate
litre/min
16.7
15.0
13.3
10.0
gal/min
3.7
3.3
2.9
2.2
Domestic Hot Water
Max. Mains Inlet Water Pressure Min. Mains Water Pressure Min. DHW Flow Rate Mains Inlet Connection DHW Outlet Connection DHW Water Content HE25
HE33
Outlet Water Temp. (Approx. max.)
Alpha HE33
Output (50/30°C) Available pump head
kW
30.0
25.0
22.0
20.0
Btu/h
102 300
85 300 75 000 68 200
metres
1.5
2.1
2.3
2.6
feet
5.0
7.0
7.6
8.6
8 bar
0.2 bar
2.5 l/min 15 mm 15 mm
0.30 L
0.35 L
62°C (144°F)
Flow rate
litre/min
20.0
16.7
15.0
13.3
gal/min
4.4
3.7
3.3
2.9
This information is based on 20°C system design temperature difference. Refer to Section 3.7, System Volume.
Alpha HE25 and HE33 - Technical Data
3
2.4 COMPONENTS
2.5 ELECTRICAL
Burner Main Heat Exchanger Condensing Heat Exchanger DHW Heat Exchanger Main Burner Injector HE25
HEB33 Flue Outer Duct - Condensing Flue Inner Duct - Condensing
2.6 INSTALLATION
Min. Clearances for Servicing Top (from casing) Bottom
Sides
Front Flue Terminal Size Flue Terminal Protruding Hole Size Required For Flue Assy. Lift Weight HE25
HE33
Stainless steel
Copper
Aluminiun
Stainless Steel
1.30 mm x 11
1.30 mm x 15 White
Plastic
235 mm 250 mm
5 mm
450 mm
100 mm Dia.
100 mm
110 mm Dia.
45 kg 47 kg
Supply External Fuse Power Consumption HE25
HE33 Internal Fuse Electrode Spark Gap
2.7 GENERAL
Case Dimensions Height
Width
Depth Gas Connection Primary Water Content HE25
HE33 Air Duct Diameter Flue Duct Diameter
230/240 V ~ 50 Hz
3 A 150 W 170 W
F2 A
2 - 4 mm
845 mm 450 mm 345 mm
22 mm
2.10 L
2.15 L
100 mm
60 mm
2.8 FLUE LENGTHS
CD Easy-Flue 500 mm with terminal and 90° bend. A CD Easy-Flue 1000 mm with terminal and 90° bend is also available. CD 750 mm and CD 1000 mm flue extensions are available. Length of Flue Required:-
Rear Flue = wall thickness + 170 mm (includes terminal) Side Flue = wall thickness + distance between wall and side of boiler + 230 mm (includes terminal) Vertical Flue = distance from top of boiler side panel to required roof position minus 1 m for vertical terminal assembly
Maximum horizontal flue length = 3 m. Maximum vertical flue length including terminal is 6 m. Each additional CD 90° Bend is equivalent to 1.3 m of flue length. Each CD 45° Bend is equivalent to 0.9 m of flue length. The CD Vertical Flue terminal assembly is equivalent to 1 m of flue length.
2.9 ELECTRICAL CONNECTIONS
Note: This Appliance Must Be Earthed
An optional integral single channel Clock kit is available if required. Note: Only use the Alpha single channel clock. Do not fit any two channel clocks.
Red
Wire
Brown
Wire
Wire
12345
Red
Not
Wire
Used
Internal Clock Terminals
Blue
WARNING
1. Ensure wires are connected correctly
2. Only fit the Alpha recommended single channel clock. Other clocks could cause damage.
Clock connections
Fig. 1
Alpha HE25 and HE33 - Technical Data
4
Boiler terminal block
2.10 BOILER SCHEMATIC
19
23
8
29
5
10
11
12
13
9
14
30
20
21
7
6
15
16
4
3
28
24
Gas
Condensate
discharge
1 - Diverter valve motor 2 - DHW flow switch and filter 3 - Diverter valve 4 - Gas valve 5 - Primary temperature sensor 6 - DHW heat exchanger 7 - Main burner 8 - Condensing heat exchanger 9 - Room sealed chamber 10 - Air pressure switch
1
2
22
25
Domestic hot water
outlet
Cold mains
water inlet
11 - Fan 12 - Pressure tube 13 - Overheat thermostat 14 - Expansion vessel 15 - Automatic air vent 16 - Pump 17 - Drain point 18 - Pressure relief valve 19 - Primary pressure switch 20 - Ignition electrodes
17
18
27
26
Heating
return
Heating
flow
21 - Flame sensing electrode 22 - DHW temperature sensor 23 - Flue sampling point 24 - Gas service cock 25 - Mains inlet on/off valve 26 - Isolating valve 27 - Automatic by-pass 28 - Condensate trap 29 - Flue limit thermostat 30 - Main heat exchanger
Fig. 2
Alpha HE25 and HE33 - Technical Data
5
3 GENERAL BOILER INFORMATION
3.1 GAS SUPPLY
The Alpha HE25 boiler requires a gas rate of 2.61 m³/h (92.1 ft³/h). The Alpha HE33 boiler requires a gas rate of 3.49 m³/h (123.2 ft³/h). The meter and supply pipes must be capable of delivering this quantity of gas in addition to the demand from any other
appliances in the house. The boiler requires at least a 22 mm gas supply pipe. The complete installation, including the meter, must be tested for gas soundness and purged as described in BS 6891.
3.2 ELECTRICAL SUPPLY
The boiler requires a 230/240 V ~ 50 Hz mains supply, fused at 3 A
The boiler must be earthed.
There must only be one common isolator, providing complete electrical isolation, for the boiler and any external controls. This boiler has been fitted with a supply cable, however, if it is necessary to fit a cable use PVC insulated cable not less than
0.75 mm² (24 x 0.2 mm) to BS 6500 Table 16. The boiler should be connected to a fused three pin plug and unswitched shuttered socket outlet (both complying with BS 1363), or a fused double pole switch with a contact separation of at least 3 mm in both poles.
Wiring external to the boiler must be in accordance with the current IEE Wiring Regulations (BS 7671). Note: If a room thermostat is fitted, it must be suitable for 230/240 V switching.
3.3 AIR SUPPLY
The boiler does not require any air vents for cooling in the room in which it is installed or when installed in a cupboard or compartment. The minimum clearances for servicing must always be maintained.
Note: A cupboard or compartment used to enclose the boiler must be designed and constructed specifically for the purpose, i.e. comply with the Building Regulations.
3.4 FLUE SYSTEM - Fig. 3
The flue system must be installed in accordance with BS 5440:1. For horizontal flues ensure the flue assembly is horizontal and the inner duct is sloping downwards towards the boiler. Flue components are available as follows:­CD Easy-Flue 500 mm (includes 90° bend and terminal) - Part No. 6.2000500.
CD Easy-Flue 1000 mm (includes 90° bend and terminal) - Part No. 6.20001000. CD 1 m flue extension - Part No. 6.20001050. CD 0.75 m flue extension - Part No. 6.2000750. CD 90° bend - Part No. 6.2000590. CD 45° bend - Part No. 6.2000545. CD Vertical flue terminal assembly. Refer to the separate installation instructions supplied with the assembly.
The following methods determine the correct length of flue required.
For rear exit flue (including terminal) L = B + 170 mm For side exit flue (including terminal) L = B + C + 230 mm (min. side clearance required is 5 mm) For vertical flue L = H minus 1000 mm for vertical terminal assembly Where L = Required flue length
B = Finished wall thickness C = Distance from the inside wall to the side of the boiler H = Distance from top of boiler side panel to roof position
Note: 1. If an extra 90° bend is used, this reduces the maximum flue length by 1.3 m. Each 45° bend used reduces the maximum
flue length by 0.9 m.
2. Under no circumstances must the flue length (including allowances for extra bends) exceed 3 metres horizontally and only 6 metres vertically.
3. If the flue is more than 0.5 m, the restrictor must be removed from the boiler flue adaptor (see Fig. 19,
4. Failure to use Alpha CD flue components with the boiler will invalidate the boilers CE approval, guarantee and may be
unsafe.
Alpha HE25 and HE33 - General Boiler Information
6
HORIZONTAL FLUE OPTIONS - Lmax = 3 metres
L = B + C + 230 mm
C
E
L = B + E + F + 230 mm + (90° bend = 1.3 metre)
B
B
F
L = B + C + E + 230 mm
C
E
C
B
B
VERTICAL FLUE OPTIONS
L = B + C + 230 mm + (2 x 45° bends = 1.8 metre)
Fig. 3
Alpha HE25 and HE33 - General Boiler Information
7
3.5 FLUE TERMINAL LOCATION - Fig. 4
Min. distance (mm)Terminal position
A Directly below an opening, air brick, windows, etc. B Below gutters, soil pipes or drain pipes C Below eaves D Below balconies E From a vertical drain pipe or soil pipe F From an internal or external corner G Above ground, roof or balcony level H From a surface facing the terminal I From a terminal facing the terminal J Above an opening, air brick, window etc. K Vertically from a terminal on the same wall L Horizontally from a terminal on the same wall M Horizontally from an opening, air brick, window etc.
300 mm (See Note 1)
Note: A terminal must not be sited under a car port roof
Fig. 4
300 (See Note 1)
75 (See Note 3) 200 (See Note 3) 200 (See Note 3) 150 (See Note 3) 300 (See Note 2)
300
600 (See Note 4)
1200 mm
300 (See Note 1)
1500 mm
300 mm
Notes: 1. In addition, the terminal should not be nearer
than 150 mm to the framework of an opening into the buiding, i.e. a window surround or door surround.
2.This clearance may be reduced to 25 mm without effecting the performance of the boiler. However, to ensure the condensate plume does not affect adjacent surfaces a clearance of 300 mm is preferable.
3.These clearances may be reduced to 25 mm without effecting the performance of the boiler. However, to ensure the condensate plume does not affect adjacent surfaces the terminal should be extended beyond gutters, pipes, eaves, balconies etc.
4.To reduce the possibility of nuisance to neighbouring buildings etc. it is recommended the terminal shouild not be less than 2500 mm from car parking spaces, building boundary walls, fences etc.
Note: In certain weather conditions the terminal will emit a plume of steam. If possible avoid positioning the terminal where this may cause a nuisance, i.e. positions A, D, G, H, J or M.
The flue terminal must be exposed to the external air and the position must allow the free passage of air across it at all times. If the terminal is fitted within 850 mm of a plastic or painted gutter or 450 mm of painted eaves, an aluminium shield at least 1 m
long should be fitted to the underside of the gutter or painted surface. A terminal must not be sited below 2.1 m where people have access to, such as public footpaths, access routes, patios etc. However, If the terminal is fitted less than 2.1 m above a surface where there is no public access, the terminal must be protected by a terminal guard. A suitable guard is available from Alpha Therm Ltd.
3.6 BOILER LOCATION
The boiler is not suitable for external installation, unless it is installed within a purpose designed weatherproof building. The boiler must be installed on a flat vertical wall which is capable of supporting the weight of the boiler. The boiler can be fitted
to or adjacent to a wall comprising of a combustible material without the need for a special thermal insulation barrier. If the boiler is to be fitted in a timber framed building, it should be fitted in accordance with the Institute of Gas Engineers 'Guide
for Gas Installations in Timber Frame Housing', reference IGE/UP/7. The boiler may be installed in any room or internal space, although particular attention is drawn to the requirements of the
current IEE Wiring (BS7671) Regulations, and in Scotland, the electrical provisions of the Building Regulations applicable in Scotland, with respect to the installation of the boiler in a room or internal space containing a bath or shower. Where a room­sealed boiler is installed in a room containing a bath or shower, it must not be possible for a person using the bath or shower to touch any electrical switch or boiler control utilising mains electricity.
The boiler may be installed in a cupboard or compartment, provided it is correctly designed for that purpose, i.e. complies with the Building Regulations and the requirements of BS 6798.
Alpha HE25 and HE33 - General Boiler Information
8
3.7 CENTRAL HEATING SYSTEM - Fig. 5
The boiler is designed for use in a sealed central heating system in accordance with the requirements of BS 5449 and BS 6798. The system should be designed to operate with flow temperatures of up to 82°C. When designing the system, the pump head, expansion
vessel size, mean radiator temperature, etc. must all be taken into account. Refer to the pump performance table for guidelines. System volume - The expansion vessel incorporated into the boiler is suitable for a sealed heating system with a maximum
water content of 80 litres (18 gal). For guidance on water contents contact Alpha Therm Ltd. for Technical Data Sheet 15. Above 80 litres, consideration should be given to fitting an additional expansion vessel fitted in the position shown in Fig. 5. To check correct operation of the expansion vessel(s) the system pressure should not be more than 2.5 bar when the system is at maximum operating temperature (for further guidance refer to BS 7074:1).
The boiler is supplied with the following components built in:­Pressure relief valve - complying with BS 6759 and set to operate at 3 bar. The discharge pipe must be routed clear of the boiler and terminated in such a manner that it can be seen, but cannot cause injury to persons or property.
Pressure gauge - To indicate the system pressure to be maintained. Expansion vessel - Conforming to BS 4814 with a capacity of 8 litres and pre-charged to a pressure of 1.0 bar. By-pass - The boiler incorporates a by-pass, however where all radiators are fitted with thermostatic radiator valves it is
recommended a system by-pass, preferably automatic is fitted.
Make up vessel
Static head of system
Boiler
casing
Automatic air vent
Additional expansion vessel (if required)
Double check valve assy.
Heating
by-pass
(If required)
Note: if required, an automatic by-pass is preferred.
Heating flow
Filling point
DHW outlet Mains water inlet
Note: If the mains is fitted with water meter, check valves or loose jumper stop cock, then a DHW expansion device must be fitted.
Note: A drain tap should be installed at the lowest point of the heating circuit and beneath the appliance.
Heating return
System drain tap
Fig. 5
3.8 FILLING THE CENTRAL HEATING SYSTEM - Figs. 6, 7
The system design pressure (cold) should be set to 1.0 bar. This pressure is equivalent to a static head (see Fig. 5) of 10.2 metres of water. Provision should be made to replace water lost from the system. This can be by manual or automatic means, as shown in Figs.
6 and 7. The position for connecting an automatic make-up vessel is indicated in Fig. 5. A double check valve assembly must be used, as shown in Fig. 7.
Filling of the system must be carried out in a manner approved by the local Water Undertaking. Where allowed, the system may be filled via a temporary connection as shown in Fig. 6. After filling, always disconnect the flexible hose of the filling loop.
All fittings used in the system must be able to withstand pressures up to 3 bar. Drain taps (to BS 2879) must be used to allow the system to be completely drained.
Heating circuit
return
Stop valve
temporarily connected
Hose
unions
Filling loop
Double check
valve assembly
Test cock
Stop valve
Mains water supply
Heating circuit
return
Double check
valve assembly
Test cock
Fig. 6 Fig. 7
Alpha HE25 and HE33 - General Boiler Information
Overflow
Stop valve
Mains water supply
Feed cistern to be located above highest point in the system
9
3.9 FLUSHING THE HEATING SYSTEM
It is essential that the central heating system is thoroughly cleaned and flushed when fitting an Alpha HE boiler, the recommended inhibitor must also be used. Failure to do so will invalidate the warranty.
The inhibitor must be applied in accordance with its manufacturers instructions. Only products from Fernox and Sentinel are acceptable for use with the Alpha HE boilers. Further information can be obtained from Fernox (Tel: 0179 9521133) or Sentinel (Tel: 0151 4209563).
The heating system should be thoroughly flushed in accordance with BS 7593 and BS 5449. The following procedures are recommended:
1. Installing onto a new system:­a.Fill the system, vent at high points, at pump and radiators. b.Check for leaks. c.Rapidly drain the system. d.If required, chemically clean the system as instructed by the recommended cleaner manufacturer.
Note: Ensure that the system is flushed to remove any remains of the cleaner.
e.If chemical cleaner is not used to clean the system:-
i) Refill the system. ii) Switch on the boiler and allow the system to heat up to the normal operating temperature. iii) Rapidly drain the system while the water is still hot.
iv) Refill the system. f. Add the recommended inhibitor to the system as instructed by the inhibitor manufacturer. g.Recheck for leaks.
2. Installing onto an existing system, clean the system before fitting the new boiler:­a.If the old boiler is still working:-
i) Switch on the boiler and allow the system to heat up to the normal operating temperature. ii) Rapidly drain the system while the water is still hot. iii) Refill and chemically clean the system as instructed by the recommended cleaner manufacturer. iv) Ensure the system is flushed to remove any remains of the cleaner. v) Fit the new boiler.
b.If the old boiler is not working:-
i) Rapidly drain the system. ii) Remove the old boiler. iii) Flush the system through. iv) Fit the new boiler. v) Refill and chemically clean the system as instructed by the recommended cleaner manufacturer.
vi) Ensure the system is flushed to remove any remains of the cleaner. c.Add the recommended inhibitor to the system as instructed by the inhibitor manufacturer. d.Check for leaks.
3.10 DISPOSAL OF CONDENSATE
Provision must be made for the safe disposal of condensate produced by the flue gases of the Alpha HE boilers, and reference should be made to BS 6798:2000 for the requirements on the disposal of condensate.
The boilers incorporate a condensate trap which has a seal of 75 mm, therefore no additional trap is required. The condensate should ideally be discharged internally into an internal waste pipe (washing machine/sink waste) or soil pipe to
avoid the possible risk of freezing. The pipework must be in 22 mm pipe. External pipe runs should be avoided, but if it is necessary, the pipework should be at least 32 mm and protected from the risk
of freezing with a waterproof insulation and the length should be kept to a maximum of 3 m. Termination should be into an external gulley or soakaway as shown in Figs. 8 and 9.
Note: All pipework must have a continuous fall (see Figs. 8 and 9) from the boiler and must be of an acid resistant material such as plastic waste pipe. (copper or steel is not suitable).
It should be noted that the connection of a condensate pipe to a drain may be subject to local building control requirements.
Alpha HE25 and HE33 - General Boiler Information
10
Fig. 8 - External gully
Fig. 9 - External soakaway
3.11 DOMESTIC HOT WATER SYSTEM
The minimum flow rate needed for the flow switch and burner to operate is 2.5 litres/min. The incoming mains water pressure should be between 0.2 and 8 bar to ensure efficient operation. If the pressure is above 7 bar
a pressure reducing valve must be fitted. To ensure economic use, the pipe runs between the boiler and taps should be in 15 mm copper pipe and be as short as
possible. Where possible the pipework should be insulated to reduce heat loss. All taps and mixing valves used with the hot water system must be suitable for operating at a mains pressure of up to 8 bar. Showers - A shower may be used with the boiler if required.
If a loose or flexible head type shower is used it may require the fitting of a double check valve, to comply with Water Bye Law 17. Bidets - No anti-syphonage arrangements are necessary, provided the outlets are shrouded and it is not possible to attach a
temporary hand held spray. A supply of direct mains fed hot and cold water is permitted provided the appliance is of the over­rim flushing type.
Before the mains water supply pipe is connected to the boiler, it should be thoroughly flushed out to avoid the danger of dirt or foreign matter entering the boiler.
Alpha HE25 and HE33 - General Boiler Information
11
4 INST ALLATION
4.1 UNPACKING
1. The boxes required when the boiler is installed with a horizontal flue are as follows:­Box 1 Cased boiler fitted with water and gas valves, filling loop, union bends and washers
Mounting bracket plus screws and wall plugs Literature pack and Wall template
Box 2 CD Easy-Flue 500 mm or CD Easy-Flue 1000 mm. Both include 90° bend and horizontal flue terminal
Note: NOT required for vertical flue
Notes: a. All flues must be suitable for CD condensing boilers.
b. CD 750 mm and 1000 mm flue extensions are available, if required.
2. Unpack boiler and remove the loose items packs and mounting bracket. Note: The boiler can be stood in an upright position, (to allow this, the union bends have been turned upwards so that
they do not protrude beneath the bottom - check this before standing the boiler upright).
4.2 CLEARANCES REQUIRED - Fig. 10
Fig. 10
4.3 PREPARE THE WALL - Figs. 11, 12
1. Decide upon the position of the boiler taking into account the clearances required for servicing and the flue terminal position.
2. Tape the template to the wall (ensure it is level and the right way up) and mark the position of the holes for the boiler mounting bracket and bottom fixings. If rear exit flue is used, mark the position of the hole for the flue.
3. Side exit flue - Continue the horizontal centre line of the flue across the wall to the side wall, then along the side wall 165 mm (ensure the lines are horizontal). This will give the position of the centre of the hole for the flue.
4. Cut the 110 mm diameter hole (or use a 107 mm core drill) in the wall for the flue.
Notes: a. Ensure the hole is horizontal.
b. For internal fitting of the flue, using the
flue sealing collar supplied, cut a 130 mm dia. flue hole using a 127 mm core drill.
5. Drill the fixing holes (10 mm dia.) to accept the No.10 plugs supplied. Using the screws supplied, fit the mounting bracket.
6. Top pipe connections - Preform the pipework at the back of the boiler before hanging the boiler, see Fig. 12, and secure in the clips provided.
Fig. 11
Alpha HE25 and HE33 - Installation
12