AERCO BMK 3.0 LN Nat. Gas for Mass. User Manual

Instruction
GF-116M
No.
Installation, Operation
& Maintenance Instructions
Benchmark 3.0LN Series Gas Fired Low NOx Boiler System
Condensing, Modulating
Forced Draft, Hot Water Boiler
3,000,000 BTU/H Input
Applicable for Serial Numbers G-09-0298 and above
Printed in U.S.A. REVISED APRIL, 2009
Telephone Support
Direct to AERCO Technical Support (8 to 5 pm EST, Monday through Friday):
1-800-526-0288
AERCO International, Inc. 159 Paris Avenue Northvale, NJ 07647-0128
www.aerco,com
© AERCO International, Inc., 2009
The information contained in this installation, operation and mainte­nance manual is subject to change without notice from AERCO International, Inc.
AERCO makes no warranty of any kind with respect to this material, including but not limited to implied warranties of merchantability and fitness for a particular application. AERCO International is not liable for errors appearing in this manual. Nor for incidental or consequential dam­ages occurring in connection with the furnishing, performance, or use of this material.
CONTENTS
GF-116M - AERCO BENCHMARK 3.0LN GAS FIRED LOW NOx BOILER
Operating & Maintenance Instructions
FOREWORD A
Chapter 1 – SAFETY PRECAUTIONS 1-1
Para. Subject Page
1-1 Warnings & Cautions 1-1 1-2 Emergency Shutdown 1-2
Chapter 2 – INSTALLATION 2-1
Para. Subject Page
2.1 Introduction 2-1
2.2 Receiving the Unit 2-1
2.3 Unpacking 2-1
2.4 Site Preparation 2-1
2.5 Supply and Return Piping 2-3
2.6 Condensate Drains 2-3
2.7 Gas Supply Piping 2-5
2.8 AC Elec tric a l Po wer Wiring 2-6
Para. Subject Page
1-3 Prolonged Shutdown 1-2
Para. Subject Page
2.9 Modes of Operation and Field Control Wiring
2.10 I/O Box Connections 2-8
2.11 Auxiliary Relay Contacts 2-10
2.12 Flue Gas Vent Installation 2-10
2.13 Combustion Air 2-11
2-7
Chapter 3 – CONTROL PANEL COMPONENTS AND OPERATING PROCEDURES 3-1
Para. Subject Page
3.1 Introduction 3-1
3.2 Control Panel Description 3-1
3.3 Control Panel Menus 3-4
3.4 Operating Menu 3-5
3.5 Setup Menu 3-5
Para. Subject Page
3.6 Configuration Menu 3-6
3.7 Tuning Menu 3-7
3.8 Start Sequence 3-7
3.9 Start/Stop Levels 3-9
Chapter 4 – INITIAL START-UP 4-1
Para. Subject Page
4.1 Initial Startup Requirements 4-1
4.2 Tools and Instruments for Combustion Calibration
4.3 Natural Gas Combustion Calibration
4-1 4-2
Para. Subject Page
4.4 Unit Reassembly 4-5
4.5 Over-Temperature Limit Switch 4-6
i
CONTENTS
Chapter 5 – MODE OF OPERATION 5-1
Para. Subject Page
5.1 Introduction 5-1
5.2 Indoor/Outdoor Reset Mode 5-1
5.3 Constant Setpoint Mode 5-2
5.4 Remote Setpoint Mode 5-2
5.5 Direct Drive Modes 5-3
Para. Subject Page
5.6 Boiler Management System (BMS)
5.7 Combination Control System (CCS)
5-4 5-5
Chapter 6 – SAFETY DEVICE TESTING PROCEDURES 6-1
Para. Subject Page
6.1 Testing of Safety Devices 6-1
6.2 Low Gas Pressure Fault Test 6-1
6.3 High Gas Pressure Test 6-2
6.4 Low Water Level Fault Test 6-2
6.5 Water Temperature Fault Test 6-2
6.6 Interlock Tests 6-3
6.7 Flame Fault Test 6-3
Para. Subject Page
6.8 Air Flow Fault Test 6-4
6.9 SSOV Proof of Closure Switch 6-4
6.10 Purge Switch Open During Purge
6.11 Ignition Switch Open During Ignition
6.12 Safety Pressure Relief Valve Test
6-5 6-5 6-6
Chapter 7 – MAINTENANCE REQUIREMENTS 7-1
Para. Subject Page
7.1 Maintenance Schedule 7-1
7.2 Spark Ignitor 7-1
7.3 Flame Detector 7-2
7.4 Combustion Calibration 7-2
7.5 Safety Device Testing 7-3
7.6 Burner 7-3
Para. Subject Page
7.7 Condensate Drain Trap 7-4
7.8 Shutting the Boiler Down For An Extended Period of Time
7.9 Placing The Boiler Back In Service After A Prolong ed Shutdown
7-5 7-5
Chapter 8 – TROUBLESHOOTING GUIDE 8-1
Para. Subject Page
8.1 Introduction 8-1
Para. Subject Page
ii
CONTENTS
APPENDICES
App Subject Page
A Boiler Menu Item Descriptions A-1 B Startup, Status and Fault
Messages
C Temperature Sensor Resistance
Chart
D Indoor/Outdoor Reset Ratio
Charts E Boiler Default Settings E-1 F Dimensional and Part Drawings F-1
B-1 C-1 D-1
WARRANTIES W-1
App Subject Page
G Piping Drawings G-1 H Wiring Schematics H-1
I Recommended Periodic Testing
Checklist
J Benchmark Control Panel Views J-1
K Natural Gas Combustion
Calibration Procedure for Unit Serial Nos. Below G-07-1901
I-1
K-1
iii

FOREWORD

Foreword
The AERCO Benchmark 3. 0LN Boiler is a m odulating unit. It represents a true industry advance that meets the needs of today's ener gy and environmental concerns. Designed for application in any closed loop hydronic system, the Benchmark's modulating capability relates energ y input directly to fluctuating system loads. The Benchmark 3.0, with its 15:1 turn down ratio and condensing capability, provides extremely high efficiencies and makes it ideally suited for modern low temperature, as well as, conventional heating systems.
The Benchmark 3.0 operates at inputs rang ing f rom 200,000 BT U/hr. to 3,000,000 BTU/ hr. The output of the boiler is a f unction of the unit’s firing rate and return water temperat ure. Output ranges from 198,000 BT U/hr. to 2,900,000 BTU/hr . , depending on operating conditions.
When installed and operated in accordance with this Instruction Manual, the Benchmark 3.0 Boiler complies with the NOx emission standards outlined in:
South Coast Air Quality Management District (SCAQMD), Rule 1146.1
Whether used in singular or modular arrangements, the Benchmark 3.0 offers the maximum flexibility in venting with minimum installation space requirements. The Benchmark 's advanced electronics are available in several selectable modes of operation offering the most efficient operating methods and energy manag em ent system integration.
For service or parts, contact your local sales represent at ive or AERCO I NTERNATIONAL.
NAME: ORGANIZATION: ADDRESS: TELEPHONE: INSTALLATION DATE: _____________________________________________
A
SAFETY PRECAUTIONS
CHAPTER 1 SAFETY PRECAUTIONS
1.1 WARNINGS & CAUTIONS
Installers and operating personnel MUST, at all times, observe all safety regulations. The following general warnings and cautions must be given the same attention as specific precautions included in these instructions. In addition to all the requirements included in this Instruction Manual, the installation of units MUST conform with local building codes, or, in the absence of local codes, ANSI Z223.1 (National Fuel Gas Code Publication No. NFPA-54). Where ASME CSD-1 is required by local jurisdiction, the installation must conform to CSD-1.
Where applicable, the equipment shall be installed in accordance with the current Installation Code for Gas Burning Appliances and Equipment, CGA B149, and applicable Provincial regulations for the class; which should be carefully followed in all cases. Authorities having jurisdiction should be consulted before installations are made.
See pages 1-2 and 1-3 for important information regarding installation of units within the Commonwealth of Massachusetts.
IMPORTANT
This Instruction Manual is an integral part of the product and must be maintained in legible condition. It must be given to the user by the installer and kept in a safe place for future reference.
WARNINGS!
MUST BE OBSERVED TO PREVENT SERIOUS INJURY.
WARNING!
BEFORE ATTEMPTING TO PER­FORM ANY MAINTENANCE ON THE UNIT, SHUT OFF ALL GAS AND ELECTRICAL INPUTS TO THE UNIT.
WARNING!
THE EXHAUST VENT PIPE OF THE UNIT OPERATES UNDER A POSITIVE PRESSURE AND THERE­FORE MUST BE COMPLETELY SEALED TO PREVENT LEAKAGE OF COMBUSTION PRODUCTS INTO LIVING SPACES.
WARNING
DO NOT USE MATCHES, CANDLES, FLAMES, OR OTHER SOURCES OF IGNITION TO CHECK FOR GAS LEAKS.
WARNING!
FLUIDS UNDER PRESSURE MAY CAUSE INJURY TO PERSONNEL OR DAMAGE TO EQUIPMENT WHEN RELEASED. BE SURE TO SHUT OFF ALL INCOMING AND OUTGOING WATER SHUTOFF VALVES. CARE­FULLY DECREASE ALL TRAPPED PRESSURES TO ZERO BEFORE PERFORMING MAINTENANCE.
WARNING!
ELECTRICAL VOLTAGES UP TO 460 VAC MAY BE USED IN THIS EQUIP­MENT. THEREFORE THE COVER ON THE UNIT’S POWER BOX (LOCATED BEHIND THE FRONT PANEL DOOR) MUST BE INSTALLED AT ALL TIMES, EXCEPT DURING MAINTENANCE AND SERVICING.
CAUTIONS!
Must be observed to prevent equipment damage or loss of operating effective­ness.
CAUTION!
Many soaps used for gas pipe leak testing are corrosive to metals. The piping must
be rinsed thoroughly with clean water after leak checks have been completed.
CAUTION!
DO NOT use this boiler if any part has been under water. Call a qualified service technician to inspect and replace any part that has been under water.
1-1
SAFETY PRECAUTIONS
1.2 EMERGENCY SHUTDOWN
If overheating occurs or the gas supply fails to shut off, close the manual gas shutoff valve (Figure 1-1) located external to the unit.
IMPORTANT
The Installer must identify and indicate the location of the emergency shutdown manual gas valve to operating personnel.
1.3 PROLONGED SHUTDOWN
After prolonged shutdown, it is recommended that the startup procedures in Chapter 4 and the safety device test procedures in Chapter 6 of this manual be performed, to verify all system­operating parameters. If there is an emergency, turn off the electrical power supply to the AERCO boiler and close the manual gas valve located upstream the unit. The installer must identify the emergency shut-off device.
Figure 1-1
Manual Gas Shutoff Valve
IMPORTANT – FOR MASSACHUSETTS INSTALLATIONS
Boiler Installations within the Commonwealth of Massachusetts must conform to the following requirements:
Boiler must be installed by a plumber or a gas fitter who is licensed within the Commonwealth of Massachusetts.
Prior to unit operation, the complete gas train and all connections must be leak tested using a non-corrosive soap.
If a glycol solution is used as anti-freeze protection, a backflow preventer must be installed upstream of the Fill/Makeup Valve.
The vent termination must be located a minimum of 4 feet above grade level.
If side-wall venting is used, the installation must conform to the following requirements extracted
from 248 CMR 5.08 (2):
(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.
. At the time of installation of the
1-2
Extracted Information From 248 CMR 5.08 (2) – Continued
a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.
b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
SAFETY PRECAUTIONS
2. APPROVED CARBON MONOXIDE DETECTORS. required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW.
KEEP CLEAR OF ALL OBSTRUCTIONS".
4. INSPECTION equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR
5.08(2)(a)1 through 4.
(b) EXEMPTIONS
1. The equipment listed in Chapter 10 entitled "Equipment Not Required To Be Vented" in the most current edition of NFPA 54 as adopted by the Board; and
2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.
(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED. the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system.
. A metal or plastic identification plate shall be permanently mounted to the exterior
. The state or local gas inspector of the side wall horizontally vented gas fueled
: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:
Each carbon monoxide detector as
When
(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies "special venting systems", the following requirements shall be satisfied by the manufacturer:
1. The identification of each "special venting system" shall include the listing of either the website, phone number or manufacturer’s address where the venting system installation instructions can be obtained, and
2. The "special venting systems" shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.
(e) A copy of all installation instructions for the Product Approved side wall horizontally vented gas fueled equipment and all the venting instructions, parts lists and/or design instructions for the venting system shall remain with the appliance or equipment at the completion of the installation.
_______________________________ [End of Extracted Information From 248 CMR 5.08 (2)]
1-3
INSTALLATION
CHAPTER 2 INSTALLATION
2.1 INTROD U CTION
This Chapter provides the descriptions and procedures necessary to unpack, inspect and install the AERCO Bench mark 3.0 Boiler. Brief descriptions are also pr ovided f or each avai lable mode of operation. Detailed procedures for implementing these modes are provided in Chapter 5.
2.2 RECEIVING THE UNIT
Each Benchmark 3.0 System is shipped as a single crated unit. The shipping weight is approximately 2,170 pounds. The unit must be moved with the proper rigging equipment for safety and to avoid equipment dam age. The unit should be complete ly inspected for evidence of shipping damage and ship ment com pleteness at the time of receipt from the carrier and before the bill of lading is signed.
NOTE
AERCO is not responsible for lost or damaged freight.
Each unit has a Tip-N-Tell indicator on the outside of the crate. T his indic ates if the un it has been turned on its side during shipment. If the Tip-N-Tell indicat or is trip ped, do not s ign for the shipment. Note the information on the carrier’s paperwork and request a freight claim and inspection by a claims adjuster before proceeding. Any other visual damage to the packaging materials s hould also be made clear to the delivering carrier.
2.3 UNPACKING
Carefully unpack the unit taking care not to damage the unit enclosure when cutting away packaging materials
Pressure/Temperature Gauge
Spare Spark Igniter
Spare Flame Detector
ASME Pressure Relief Valve
Condensate Drain Trap
2” Gas Supply Shutoff Valve
When ordered, optional accessories may be packed separately, packed within the boiler shipping container, or may be installed on the boiler. Any standard or optional accessories shipped loose should b e identified and s tored in a safe place until ready for installation or use.
2.4 SITE PREPARATION.
Ensure that the site selected for installation of the Benchmark 3.0 Boiler includes:
Access to AC Input Power corresponding to the ordered power configuration. The available power configurations are:
208 VAC, 3-Phase, 60 Hz @ 20 A
460 VAC, 3-Phase, 60 Hz @ 15 A
Access to Natural Gas line at a minimum
static pressure of 3.5” W .C.(FM) or 4.0” W.C. (IRI). Maximum static pressure must not exceed 2 psi.
2.4.1 Installation Clearances
The unit must be installed with the prescribed clearances for service as shown in Figure 2-1. The minimum AERCO, are listed below. However, if Local Building Codes require additional clearances, these codes shall supersede AERCO’s requirements. Minimum acceptable clearances required are:
clearance dimensions , requir ed by
A close inspection of the unit s hould be made to ensure that there is no evidence of dam age not indicated by the T ip-N-Tell indicator. The f reight carrier should be notified immediately if any damage is detected.
The following accessories come standard with each unit and are either packed separately within the unit’s pack ing container or are fac tory installed on the boiler:
Sides: 24 inches
Front : 24 inches
Rear: 43 inches
Top: 18 inches
All gas piping, water piping and el ec tric al c on du it or cable must be arranged so that they do not interfere with the removal of any panels, or inhibit service or maintenance of the unit.
2-1
INSTALLATION
Figure 2-1 Benchmark 3.0 Boiler Clearances
WARNING
KEEP THE UNIT AREA CLEAR AND FREE FROM ALL COMBUSTIBLE MATERIALS AND FLAMMABLE VAPORS OR LIQUIDS
.
CAUTION
While packaged in the shipping container, the boiler must be moved by pallet jack or forklift from the FRONT ONLY.
IMPORTANT
The boiler installation must be installed by a plumber or gas fitter who is licensed within the Common­wealth of Massachusetts. In addition, the installation must comply with all requirements specified in Chapter 1 (Safety Precautions), pages 1-2 & 1-3.
from the unit to prov id e ac ces s to t he l if ting tabs . Remove the four (4) lag s cr e ws s ecur ing the un it to the shipping sk id. Lift the unit off the shipping skid and position it on the 4 inch to 6 inch housekeeping concrete pad (required) in the desired location.
2.4.2 Setting the Unit
The unit must be installed on a 4 inch to 6 inch housekeeping pad to e nsure proper conde nsate drainage. If anchoring the unit, refer to the dimensional drawings in Appendix F for anchor locations. A total of 3 lif ting tabs are pr ovided at the top of the prim ary heat exchanger as shown in Figure 2-2. However, USE ONLY TABS 1 AND 2 SHOWN IN FIGURE 2- 2 TO MOV E THE ENTIRE UNIT. Tabs 1 and 3 are used only when removing or replacing the unit’s primary heat exchanger. Remove the front top panel
2-2
Figure 2-2
Lifting Lug Locations
In multiple unit installations, it is important to plan the position of each unit in advance. Sufficient space for piping connections and future service/maintenance requirements must also be taken into cons ider ation. All pipin g m ust include ample provisions for expansion.
INSTALLATION
/
If installing a Combina tion Control Panel (CCP) system, it is important to identify the Combination Mode B oilers in adv ance and plac e them in the proper physical location. Refer to Chapter 5 for inform ation on Combination Mode Boilers.
2.4.3 Removal of Support Rod
Prior to installation of water supply and return piping, the 24” threaded ro d shown in Fig ure 2-3 must be removed. This rod is installed prior to shipment from the f actory to prevent dam age to the insulated metal flex hose on the hot water supply outlet of the b oiler. In order to install t he water supply piping, this rod must be removed as follows:
1. Refer to Figure 2-3 and back off the hex nut on the outlet side of the flex hose.
2. Next, disconnect the coupling nut from the flange stud.
3. Completely remove the threaded rod, hex nut and coupling nut from the boiler.
5
5/8-11 x 24" LONG
THREADED ROD
5/8-11
HEX NUT
8-11
COUPLING NUT
2.5 SUPPLY AND RETURN PIPING
The Benchmark 3.0 Boiler utilizes 4” 150# flanges for the water system supply and return piping connectio ns. The physical location of the supply and return p iping connections are on the rear of the unit as shown in Figure 2-4. Ref er to Appendix F, Drawing AP-A-811 for additional dimensional data.
OUTLET FLANGE
(SEE IMPORTANT
NOTE BELOW)
EXHAUST
MANIFOLD
PARTIAL TOP VIEW - REAR
Figure 2-3
Location of Threaded Support Rod
IMPORTANT
THE INSULATED FLEX HOSE SHOWN IN FIGURE 2-3 MUST LEVEL OR SLOPING UPWARD AS IT EXITS THE BOILER. FAILURE TO PROPERLY POSITION THIS HOSE MAY CAUSE INEFFECTIVE AIR ELIMINATION RESULTING IN ELE­VATED TEMPERATURES THAT COULD COMPROMISE THE TOP HEAD GASKET.
BE
Figure 2-4
Supply and Return Locations
2.6 CONDENSATE DRAINS
The Benchmark 3.0 Boiler is designed to condense water vapor from the flue products. Therefore, the insta llation must have provisions for suitable condensate drainage or collection.
Two condensate dra in connections ar e provided on the rear of the unit as shown in Figure 2-5. One drain connection is located on the exhaust manifold and the other is located on the connecting manifold.
The drain at the bottom of the exhaust manifold also includes a condensate trap containing a float assembly. When c ondensate collects in t he exhaust manifold, the float rises, thereby allowing it to discharge through the drain opening. The drain pipe located on the connecting manifold must be connected to a second condensate trap which is packed separately within the unit’s shipping container.
The procedures to install and connect both of the condensate drains are provided in paragraphs 2.6.1 and 2.6.2.
2-3
INSTALLATION
EXHAUST
MANIFOLD
CONDENSATE
TRAP
DRAIN
SHELL DRAIN
VALVE
CONNECTING
MANIFOLD
DRAIN
REAR VIEW
UNIT
EXHAUST
MANIFOLD
CONDENSATE
TRAP
DRAIN
HOSE
CLAMP
1" I.D.
HOSE
FRAME
TO FLOOR
DRAIN
VIEW “A - A”
DRAIN
VALVE
CONNECTING
CONDENSATE
CONDENSATE
Figure 2-5
Condensate Drain Connection Location
2.6.1 Exhaust Manifold Condensate
Drain
Refer to Figure 2-5, View A – A and install as follows:
A
A
UNIT
FRAME
SHELL
MANIFOLD
TO
TRAP
DRAIN PIPE
VIEW “B - B”
B
B
NOTE
The condensate trap described in the following steps can be installed on the floor behind the unit as s ho wn i n Fi gur e 2-
6. There will be suf ficient do wnward slop e from the drain pipe to the trap inlet to drain the condensate by gravity. Ensure that the outlet hose from the trap slopes away (down) from the trap.
1. Position the supplied condensate t rap (part no .
24060) on the floor at the rear of the unit.
2. Install 3/4” NPT nipples in the tapped inlet and outlet of the condensate trap.
3. Attach a length of 1½” I.D. hose (part no. GM-123352) between the connecting manifold drain pipe and the inlet side of the condensate trap (Figure 2-6). Secure both ends of the hose with clamps.
4. Connect a second length of 1” I.D polypropylene. hose to the outlet side of the condensate trap and route it to a nearby floor drain.
If desired, a Tee fitting m ay be used to connect the two drain hoses from the exhaust manifold and the outlet side connected in
If a floor drain is not available, a condensate pump can be used to remove the condensate to drain. The maximum condensate flow rate is 20 GPH. The condensate drain trap, associated fittings and drain lines must be removable for routine maintenance. Therefore, DO N OT hard pipe.
of the of the condensa te trap
1. Connect a length of 1 inch I.D. hose (pa rt no.
91030) to the drain on th e connecting manifold and secure it in place with a hose cla mp.
2. Route the hose to a nearby floor drain.
2.6.2 Connecting Manifold Condensate Drain
The connecting manifold drain pipe shown in Figure 2-5, View B – B m ust be connected to a separate condensate drain trap external to the unit. Refer to Figure 2-6 and install the trap as follows:
2-4
Figure 2-6
Condensate Trap Installation
INSTALLATION
2.7 GAS SUPPLY PIPING
The AERCO Benchmark 3.0 Gas Components and Supply Design Guide, GF-3030 must be consulted prior to des ignin g or installi ng an y gas supply piping.
WARNING
NEVER USE MATCHES, CANDLES, FLAMES OR OTHER SOURCES OF IGNITION TO CHECK FOR GAS LEAKS
Many soaps used for gas pipe leak testing are corrosive to metals. There­fore, piping must be rinsed thoroughly with clean water after leak checks have been completed.
All gas piping m ust be arranged so that it does not interfere with removal of any covers, inhibit service/maintenance, or restrict access between the unit and walls, or another unit.
.
CAUTION
NOTE
2.7.1 Gas Supply Specifications.
The gas supply input specifications to the unit for Natural Gas are as follows:
The maximum static pressure to the unit must not exceed 2 psi. The minimum operating gas pressure for natural gas is 3.5” W .C. for FM and
4.0” W.C. for IRI gas trains when t he u nit is f iring
at maximum input. The gas supply pressure to the unit must be of suff icient capacity to provide 3000 cfh while maintaining the gas pressure at
3.5” W.C. for FM or 4.0” for IRI gas trains.
2.7.2 Manual Gas Shutoff Valve
A manual shut-off valve must be installed in th e gas supply line upstream of the Boiler as shown in Figure 2-7. M aximum allowable gas pressure to the Boiler is 2 psi
A 2 inch gas inlet connection is located on the rear of the unit as shown in Figure 2-4.
Prior to installation, all pipes should be de­burred and internally clear ed of any scale, m etal chips or other foreign particles. Do Not install any flexible connectors or unapproved gas fittings. Piping must be s upported from the floor, ceiling or walls onl y and must not be supported by the unit.
A suitable piping compound, approved for use with natural gas, should be used. Any excess must be wiped off to prevent clogging of components.
To avoid unit damage whe n pres sur e tes ting gas piping, isolate the unit from the gas supply piping. At no time should the gas pressure applied to the unit exceed 2 psi. Leak test all external piping thoroughly using a soap and water solution or suitable equivalent. The gas piping used must meet all applicable codes.
Figure 2-7
Manual Gas Shut-Off Valve Location
2-5
INSTALLATION
2.7.3 IRI Gas Train Kit
The IRI gas train is an optional gas train configuration which is r e qui red i n s ome areas for code compliance or for insurance purposes. The IRI gas train is factor y pre-piped and wired. See Appendix F, Drawing AP- A-803 f or details.
2.8 AC ELECTRICAL POWER WIRING
The AERCO Benchmark 3.0 Electrical Power Wiring Guide, GF-30 60, must be co nsulted prior to connecting any AC power wiring to the unit. External AC power connect ions are made to the unit inside the Power Box on the front panel of the unit. Remove the front door of the unit to access the Power Box mounted directly above the Control Box. Loosen the four Power Box cover screws and remove cover to access the AC terminal connections inside the Power Box (Figure 2-8).
NOTE
All electrical conduit and hardware must be installed so that it does not interfere with the removal of any un it cover s, inh ibit service/maintenance, or prevent access between the unit and walls or another unit.
2.8.1 Electrical Power Requirements
The AERCO Benchmark 3.0 Boiler is available in two different AC power configurations:
208 VAC/3-Phase/60 @20 amps
460 VAC/3-Phase/60 Hz @ 15 amps
Each of the power c onfigur ations ut ilize a Power Box with a terminal block that matches the configuration ordered. The two different terminal block configurations are shown in Figure 2-9. A wiring diagram showing the required AC power connections is pro vided on the front c over of the Power Box.
Each Benchmark 3.0 Boil er must be connected to a dedicated electrical circuit. NO OTHER DEVICES SHOULD BE ON THE SAME ELECTRICAL CIRCUIT AS THE BENCHMARK BOILER. A means for disconnecting AC power from the unit (such as a ser vice switch) mus t be installed near th e unit for normal operation and maintenance. All electrical connections should be made in accordance with the National Electrical Code and/ or with any applicable local codes.
For electrical power wiring diagrams, see the AERCO Benchmark 3.0 Electrical Power W iring Guide, (GF-3060).
Figure 2-8
AC Input Terminal Block Location
Figure 2-9
AC Terminal Block Configurations
2-6
2.9 MODES OF OPE RATION AND FIELD CONTROL WIRING
The Benchmark 3.0 B oiler is available in severa l different modes of operation. W hile each unit is factory configured and wired for its intended mode, some additional field wiring may be required to complete th e installation. This wir ing is typically connected to the Input/Output (I/O) Box located on the lower por tion of the unit fr ont panel (Figure 2-10) behind the removable front door.
To access the I/O Box terminal strips shown in Figure 2-10, loosen the four cover screws and remove the cover. All field wiring is installed from the rear of the panel by routing the wires through one of the four bushings provided.
Refer to the wiring diagram provided on the cover of the I/O Box (Figur e 2-11) when making all wiring connections.
INSTALLATION
In addition to the term inal strips s hown in Figure 2-10, the I/O Box also contains a pre-wired temperature transmitter which receives inlet air temperature sensor readings and transmits this signal to the variable frequency drive (VFD) contained in the Benchm ark 3.0 Boil er. T he VFD utilizes this input signal to adjust the rotation speed of the blower.
Figure 2-10.
Input/Output (I/O) Box Location
Brief descriptions of each mode of operation, and their wiring requirements, are provided in the following paragr aphs. Additional information concerning field wiring is prov ided in paragr aphs
2.9.1 through 2.9.9. Refer to Chapter 5 for
detailed information on the available modes of operation.
Figure 2-11. I/O Box Terminal Strip
2-7
2.9.1 Constant Setpoint Mode
The Constant Setpoi nt Mode is used when it is desired to have a fixed setpoint that does not deviate. No wiring connections, other than AC electrical power connections, are required for this mode. However, if desired, fault monitor ing or enable/disable in terlock wiring c an be utilized (see paragraphs 2.9.9.1 and 2.9.10).
2.9.2 Indoor/Outdoor Reset Mode
This mode of operation increases supply water temperature as outdoor te mperatures decrease. An outside air temperatur e sensor (AERCO Part No. 122790) is requ ired. The sensor MUST BE wired to the I/O Box wiring term inals (see Figure 2-11). Refer to paragraph 2.10.1 for additional information on outside air temperature sensor installation.
2.9.3 Boiler Management System Mode NOTE
BMS Model 168 can utilize either pulse width modulation (PWM) or RS485 Modbus signaling to the Boiler. BMS II Model 5R5-384 can utilize only RS485 signaling to the Boiler.
When using an AERCO Boiler Management System (BMS), the field wiring is connected between the BMS Panel and each Boiler’s I/O Box terminal strip (Figure 2-11). Twisted shielded pair wire f rom 18 to 22 AWG must be utilized for the connections. The BMS Mode can utilize either pulse width modulation (PWM) signaling, or RS485 Modbu s s ignaling. F or PWM signaling, connections are made from the AERCO Boiler Management System to the B.M.S. (PWM) IN terminals on the I/O Box terminal strip. For RS485 Modus signaling, connections are made from the BMS to the RS485 COMM term inals on the I/O Box ter minal strip. Polarity m ust be maintain ed and the shie ld must be connected only at the AERCO BMS. The boiler end of the shi eld m ust be left f loating. For additional instructions, refer to Chapter 5, paragraph 5.6 in t his manual. Also, ref er to GF­108M (BMS Model 168) and GF-124 (BMS II Model 5R5-384), BMS -Operations Guides.
4 to 20 mA/1 to 5 VDC
0 to 20 mA/0 to 5 VDC
PWM – (Pulse W idth Modulated signal. See
para. 2.10.4)
Network (RS485 Modbus. See para. 2.10.7) While it is possible to c ontrol a boiler or boilers
using one of the previously described m odes of operation, it ma y not be the method best suited for the application. Prior to selecting one of these modes of operation, it is recommended that you consult with your local AERCO representative or the factory for the mode of operation that will work best with your application. For m ore information on wir ing the 4 to 20 mA / 1to 5VDC or the 0 to 20 m A / 0 to 5 VDC, see paragraph 2.9.3.
2.9.5 Combination Mode NOTE
Only BMS Model 168 can be utilized for the Combination Mode, not the BMS II (Model 5R5-384).
With a Combination Mode unit, field wiring is between the unit’s I/O Box wiring terminals, the CCP (Combination Contr ol Panel), an d the BMS Model 168 (Boiler Management System). The wiring must be accomplished using twisted­shielded pair wire f rom 18 to 22 AWG. Polarity must be maintaine d. For further inst ructions and wiring diagrams, refer to the GF-108 Boiler Management System Operations Guide and the CCP-1 data sheet.
2.10 I/O BOX CONNECTIONS
The types of input and output signals and devices to be connecte d to the I/O Box terminals shown in Figure 2-11 are described in the following paragraphs.
CAUTION
DO NOT make any connections to the I/O Box terminals labeled “NOT USED”. Attempting to do so may cause equipment damage.
2.9.4 Remote Setpoint and Direct Drive Modes
The Benchmark 3.0 Boiler can accept several types of signal formats from an Energy Management System (EMS), Building Automation System (BAS) or other source, to control either the setpoint (Remote Setpoint Mode) or firing rate (Direct Drive Mode) of the Boiler. These formats are:
2.10.1 OUTDOOR SENSOR IN
An outdoor air temperature sensor (AERCO Part No. 122790) will be required primarily for the Indoor/Outdoor reset m ode of operation. It can also be used with anoth er m ode if it is desired to use the outdoor sensor enable/disable feature. This feature allows the boiler to be enabled or disabled based on the outdoor air temperature.
INSTALLATION
The factory default for the outdoor sensor is DISABLED. To enable the sensor and/or select an enable/disable o utdoor temperature, see the Configuration menu in Chapter 3.
The outdoor sensor m ay be wired up t o 200 feet from the boiler. It is connected to the OUTDOOR SENSOR IN and SENSOR COMMON terminals in the I/O Box (see Figures 2-10 and 2-11). W ire the sensor using a twisted shielded pair wire fr om 18 to 22 AWG. There is no polarity to observe when terminating these wires. The shield is to be c onnected only to the terminals labeled SHIELD in the I/O Box. The sensor end of the shield must be left free and ungrounded.
When mounting the sensor, it must be located on the North side of the building where an average outside air temperature is expected. The sensor must be shield ed f r om dir ect sunli ght as well as impingement by the elements. If a shield is used, it must allow for free air circulation.
2.10.2 AUX SENSOR IN
The AUX SENSOR IN terminals can b e used to add an additional temperature sensor for monitoring purposes. This input is always enabled and is a view-only input that can be seen in the Operating Menu. The sensor must be wired to the AUX S ENSOR IN and SENSOR COMMON terminals and must be similar to AERCO BALCO wire se nsor Part No. 124 49. A resistance chart for this sensor is provided in Appendix C.
2-11). Polarity mu st be maintained. The shi eld must be connected only at the source end and must be left floating (not connected) at the Boiler’s I/O Box.
Regardless of whether volt age or curr ent is used for the drive signal, the y are linearly mapped to a 40°F to 240°F setpoint or a 0% to 100% f iring rate. No scaling for these signals is provided
2.10.4 B.M.S. (PWM) IN NOTE
Only BMS Model 168 can utilize Pulse Width Modulation (PW M), not the BMS II (Model 5R5-384).
These terminals are used to connect the AERCO Boiler Management System (BMS) Model 168 to the unit. The BMS Model 168 utilizes a 12 millisecond, ON/OFF duty cycle. This duty cycle is Puls e Width Modulated (PWM) to control firing ra te. A 0% firing rate = a 5% O N pulse and a 100% firing rate = a 95% ON pulse.
2.10.5 SHIELD
The SHIELD terminals are us ed to terminate any shields used on sensor wires connected to the unit. Only shields m ust be connected to these terminals.
2.10.6 mA OUT
These terminals provide a 4 to 20 mA output to the VFD to control the rotational speed of the blower. This function is enabled in the Configuration Menu (Chapter 3, Table 3.4).
2.10.3 ANALOG IN
The ANALOG IN + and – terminals are used when an external signal is used to drive the firing rate (Direct Drive Mode) or change the setpoint (Remote Setpoint Mode) of the Boiler.
Either a 4 to 20 mA /1 to 5 VDC or a 0 t o 20 mA / 0 to 5 VDC signal may be used to vary the setpoint or firing rate. T he factory def ault setting is for 4 to 20 mA / 1 to 5 VDC, howev er this m a y be changed to 0 to 20 mA / 0 to 5 VDC usi ng the Configuration Menu described in Chapter 3. If voltage rather than current is selected as the drive signal, a DIP switch must be set on the CPU Board located inside the Control Box. Contact the AERCO factory for information on setting DIP switches.
All of the supplied signals must be floating (ungrounded) signals . Connectio ns bet ween the signal source and the Boiler’s I/O Box must be made using twiste d shiel ded pa ir wire fr om 18 to 22 AWG, such as Belden 9841 (see Figure
2.10.7 RS-485 COMM
These terminals are used for RS-485 MODBUS serial communication between the unit and an external “Master” suc h as a Boiler Management System (BMS), Energy Management System (EMS), Building Automation System (BAS) or other suitable device.
2.10.8 EXHAUST SWITCH IN
These terminals permit an external exhaust switch to be connected to the exhaust manifold of the boiler. The exhaust switch should be a normally open t ype s witc h (such as AERCO Par t No. 123463) that closes (trips) at 500°F.
2.10.9 INTERLOCKS
The unit offers two interlock circuits for interfacing with Energy Management Systems and auxiliary equipment such as pumps or louvers. These interlock s are called the Rem ote Interlock and Delayed Interlock (Figure 2-11). The wiring terminals for these interlocks are
2-9
located inside the I/O Box on the unit front panel. The I/O Box cover contains a wiring diagram which s hows th e ter m inal str ip locat ions for these interlocks (REMOTE INTL’K IN and DELAYED INTL’K IN). Both interlocks, described below, are fac tory wired in the closed position.
NOTE
Both the Delayed Interlock and Remote Interlock MUST be in the closed position to allow the unit to fire.
2.10.9.1 REMOTE INTERLOCK IN
The remote interlock circuit is provided to remotely start (enable) and stop (disable) the Boiler, if desired. The circuit is labeled REMOTE INTL’K IN and is loc ate d i nsid e th e I/O Box on the front panel. The circuit is 24 VAC and is factory pre-wired in the c losed (jum pered) position.
2.10.9.2 DELAYED INTERLOCK IN
The delayed interlock is typically used in conjunction with the aux iliary relay described in paragraph 2.10. This interlock circuit is located in the purge section of the start string. It can be connected to the proving device (end switch, flow switch etc.) of an auxiliary piece of equipment started b y the Boiler’s a uxiliary rela y. The delayed interlock must be closed for the boiler to fire.
If the delayed interl ock is connec ted t o a pr oving device that requir es tim e to clos e (mak e), a tim e delay (Aux Start On Dly) that holds the start sequence of the boiler lon g enoug h for a proving switch to make can be progr amm ed. Should the proving switch not prove within the programm ed time frame, the boiler will shut down. The Aux Start On Dly can be progr ammed from 0 to 120 seconds. This option is locate in the Configuration Menu (Chapter 3, Table 3-4).
2.10.10 FAULT RELAY
The fault relay is a single pole double throw (SPDT) relay having a normally open and normally closed set of relay contacts that are rated for 5 amps at 12 0 VAC and 5 amps at 30 VDC. The relay energizes when any fault condition occurs and remains energized until the fault is cleared and the CLEAR button is depressed. The fault relay connections are shown in Figure 2-11.
2.11 AUXILIARY RELAY CONTACTS
Each Boiler is equipped with a single pole double throw (SPDT) relay that is energized when there is a demand for heat and de­energized after the dem and for heat is satisf ied. The relay is prov ided for the control of auxiliary equipment, such as pumps and louvers, or can be used as a Boiler status indictor (firing or n ot firing). Its contacts are r ated for 120 VAC @ 5 amps. Refer to Figure 2- 11 to locate the AUX RELAY terminals for wiring connections.
2.12 FLUE GAS VENT INSTALLATION
The minimum allowable vent diameter for a single Benchmark 3.0 Boiler is 8 inches.
The AERCO Benchmark Venting and Combustion Air Guide, GF-3050, must be consulted before any flue gas vent or inlet air venting is designed or installed. U/L listed, positive pressure, watertight vent materials as specified in AERCO’s GF-3050, must be used for safety and code com pliance. S ince the u nit is capable of dischar ging low temperature ex haust gases, horizontal sections of the flue vent system must be pitched back to the unit a minimum of 1/4 inch per foot to avoid condensate pooling and allow for proper drainage.
The combined pressure drop of vent and combustion air systems must not exceed 140 equivalent feet of 8 inc h ducting. Fittings as we ll as pipe lengths must be calculate d as part of the equivalent length.
For a natural draf t installation the draf t must not exceed ±0.25 inch W .C. These factors must be planned into the vent installation. If the maximum allowabl e equivalent lengt hs of piping are exceeded, the unit will not operate properly or reliably.
The Heatfab Division of the Selk irk Corporation provides vent systems which conform to all applicable requirements for installations within the Commonwealth of Massachusetts. Contact information for this supplier are as follows:
Selkirk Corporation Heatfab Division 130 Industrial Blvd. Turners Falls, MA 01376 Phone: 1-800-772-0739
www.heat-fab.com
INSTALLATION
2.13 COMBUSTION AIR
The AERCO Benchmark Venting and Combustion Air Guide, GF-3050 MUST be consulted before any flue or combustion supply air venting is designed or implemented. Combustion air supp ly is a direct r equirem ent of ANSI 223.1, NFPA-54, and local codes. These codes should be consulted before a permanent design is determined.
The combustion air must be free of chlorine, halogenated hydrocarbons, or other chemicals that can become ha zardous when used in gas­fired equipment. Common sources of these compounds are swimming pools, degreasing compounds, plastic proc essing and refrigerants. Whenever the env ironment c ontains thes e t ypes of chemicals, combustion air must be supplied from a clean area outdoors for the protection and longevity of the equipment.
The AERCO Benchm ark 3.0 Boiler is UL listed for 100% sealed combustion. It can also be installed using room air, provided there is an adequate supply. (See paragraph 2.13.3 for more information conc erning sealed com bustion air). If the sealed combustion air option is not being used, an inlet screen will be attached at the air inlet on the top of the unit
The more common methods of supplying combustion air are outlined below. For more information concerning combustion air, consult the AERCO Benchmark Venting and Combustion Air Guide, GF-3050.
2.13.2 Combustion Air From Inside The
Building
When combustion air is provided f rom within the building, it must be supplied through two permanent openings in an interior wall. Each opening must have a free area of not less than one square inch per 1000 BTU/H of total boiler input. The free area must take into ac count any restrictions such as louvers.
2.13.3 Sealed Combustion
The AERCO Benchm ark 3.0 Boiler is UL listed for 100%-sealed combustion. For sealed combustion installations, the screen on the air inlet duct of the unit m ust be removed. T he inlet air ductwork must then be attached directly to the unit’s air inlet.
In a sealed combustion air application, the combustion air ducting pre ssure losses must be taken into account when calculating the total maximum allowable venting run. See the AERCO Benchmark Venting and Combustion Air Guide, GF-30 50. When using the bo iler in a sealed combustion air configuration, each unit must have a minimum 8 inch diameter connection at the unit.
2.13.1 Combustion Air From Outside the Building
Air supplied from outside the building must be provided through two perm anent openings. Each opening must have a free area of not less than one square inch for each 4000 BTU/H boiler input. The free area must take into account restrictions such as louvers and bird screens.
2-11
CONTROL PANEL OPERATING PROCEDURES
CHAPTER 3 CONTROL PANEL OPERATING PROCEDURES
3.1 INTRODUCTION
The information in this Chapter provides a guide to the operation of the Benchmark 3.0 Boiler using the Control Panel mounted on the front of the unit. It is imperative that the initial startup of this unit be performed by factory trained personnel. Operation prior to initial startup by factory trained personnel will void the equipment warranty. In addition, the following WARNINGS and CAUTIONS must be observed at all times.
CAUTION
All of the installation procedures in Chapter 2 must be completed before attempting to start the unit.
WARNING
ELECTRICAL VOLTAGES IN THIS SYSTEM MAY INCLUDE 460, 208 AND 24 VOLTS AC. IT MUST BE SERVICED ONLY BY FACTORY CERTIFIED SERVICE TECHNICIANS
WARNING
DO NOT ATTEMPT TO DRY FIRE THE BOILER. STARTING THE UNIT WITHOUT A FULL WATER LEVEL CAN SERIOUSLY DAMAGE THE UNIT AND MAY RESULT IN INJURY TO PERSONNEL OR PROPERTY DAMAGE. THIS SITUATION WILL VOID ANY WARRANTY.
3.2 CONTROL PANEL DESCRIPTION
The Benchmark 3.0 Control Panel shown in Figure 3-1 contains all of the controls, indicators and displays necessary to operate, adjust and troubleshoot the Benchmark 3.0 Boiler. These operating controls, indicators and displays are listed and described in Table 3-1. Additional information on these items are provided in the individual operating procedures provided in this Chapter.
Figure 3-1.
Control Panel Front View
3-1
CONTROL PANEL OPERATING PROCEDURES
Table 3-1 Operating Controls, Indicators and Displays
ITEM
NO.
CONTROL, INDICATOR
OR DISPLAY
1 LED Status Indicators Four Status LEDs indicate the current operating status as
follows:
COMM
MANUAL
REMOTE
DEMAND
OUTLET
2
TEMPERATURE
Display
3 VFD Display Vacuum Fluorescent Display (VFD) consists of 2 lines each
Lights when RS-232 communication is occurring
Lights when the unit is being controlled using the front panel keypad.
Lights when the unit is being controlled by an external signal from an Energy Management System
Lights when there is a demand for heat.
3–Digit, 7–Segment LED display continuously displays the
outlet water temperature. The °F or °C LED next to the
display lights to indicate whether the displayed temperature is in degrees Fahrenheit or degrees Celsius.
capable of displaying up to 16 alphanumeric characters. The information displayed includes:
Startup Messages
Fault Messages
Operating Status Messages
FUNCTION
Menu Selection
RS-232 Port
4
FAULT Indicator Red FAULT LED indicator lights when a boiler alarm
5
CLEAR Key Turns off the FAULT indicator and clears the alarm message
6
READY Indicator
7
ON/OFF Switch
8
LOW WATER LEVEL
9
TEST/RESET Switches
Port permits a Laptop Computer or External Modem to be connected to the unit’s Control Panel.
condition occurs. An alarm message will appear in the VFD.
if the alarm is no longer valid. Lockout type alarms will be latched and cannot be cleared by simply pressing this key. Troubleshooting may be required to clear these types of alarms.
Lights ON/OFF switch is set to ON and all Pre-Purge
conditions have been satisfied.
Enables and disables boiler operation.
Allows operator to test operation of the water level monitor.
Pressing TEST opens the water level probe circuit and
simulates a Low Water Level alarm.
Pressing RESET resets the water level monitor circuit. Pressing the CLEAR key (item 6) resets the display.
3-2
CONTROL PANEL OPERATING PROCEDURES
Table 3-1 Operating Controls, Indicators and Displays – Continued
ITEM
NO.
10 MENU Keypad Consists of 6 keys which provide the following functions for
CONTROL, INDICATOR
OR DISPLAY
the Control Panel Menus:
MENU
BACK
▲ (UP) Arrow When in one of the main menu categories (Figure 3-2),
▼ (DOWN) Arrow When in one of the main menu categories (Figure 3-2),
CHANGE
Steps through the main menu categories shown in Figure 3-
2. The Menu categories wrap around in the order shown.
Allows you to go back to the previous menu level without changing any information. Continuously pressing this key will bring you back to the default status display in the VFD. Also, this key allows you to go back to the top of a main menu category.
pressing the arrow key will select the displayed menu
category. If the CHANGE key was pressed and the menu
item is flashing, pressing the arrow key will increment the selected setting.
pressing this key will select the displayed menu category. If
the CHANGE key was pressed and the menu item is
flashing, pressing the arrow key will decrement the selected setting.
Permits a setting to be changed (edited). When the
CHANGE key is pressed, the displayed menu item will begin
to flash. Pressing the or arrow key when the item is flashing will increment or decrement the displayed setting.
FUNCTION
11
12
ENTER
AUTO/MAN Switch
FIRE RATE Bargraph
Saves the modified menu settings in memory. The display will stop flashing.
This switch toggles the boiler between the Automatic and
Manual modes of operation. When in the Manual (MAN)
mode, the front panel controls are enabled and the
MANUAL status LED lights. When in the Automatic (AUTO) mode, the MANUAL status
LED will be off and the front panel controls disabled.
20 segment red LED bargraph continuously shows the Fire Rate in 5% increments from 0 to 100%
3-3
CONTROL PANEL OPERATING PROCEDURES
3.3 CONTROL PANEL MENUS
The Control Panel incorporates an extensive menu structure which permits the operator to set up, and configure the unit. The menu structure consists of four major menu categories as shown in Figure 3-2. Each of the menus shown, contain options which permit operating parameters to be viewed or changed. The menus are protected by a password to prevent unauthorized use.
Prior to entering the correct password, the options contained in the Operating, Setup, Configuration and Tuning Menu categories can be viewed. However, with the exception of Internal Setpoint Temperature (Configuration Menu), none of the viewable menu options can be changed.
Once the valid password (159) is entered, the options listed in the Setup. Configuration and Tuning Menus can be viewed and changed, if desired.
3.3.1 Menu Processing Procedure
Accessing and initiating each menu and option is accomplished using the Menu Keys shown in Figure 3-1. Therefore, it is imperative that you be thoroughly familiar with the following basic steps before attempting to perform specific menu procedures.
around after the first or last available option is reached.
6. To change the value or setting of a
displayed menu option, press the CHANGE
key. The displayed option will begin to flash. Press the or arrow key to scroll through the available menu option choices for the option to be changed. The menu option choices do not wrap around.
7. To select and store a changed menu item,
press the ENTER key.
1. The Control Panel will normally be in the Operating Menu and the VFD will display the current unit status. Pressing the or arrow key will display the other available data items in the Operating Menu.
2. Press the MENU key. The display will show
the Setup Menu, which is the next menu category shown in Figure 3-2. This menu contains the Password option which must be entered if other menu options will be changed.
3. Continue pressing the MENU key until the
desired menu is displayed.
4. With the desired menu displayed, press the or arrow key. The first option in the selected menu will be displayed.
5. Continue to press the or arrow key until the desired menu option is displayed. Pressing the arrow key will display the available menu options in the Top-Down sequence. Pressing the arrow key will display the options in the Bottom-Up sequence. The menu options will wrap-
Figure 3-2. Menu Structure
NOTE
The following paragraphs provide brief descriptions of the options contained in each menu. Refer to Appendix A for detailed descriptions of each menu option. Refer to Appendix B for listings and descriptions of displayed startup, status and error messages.
3-4
CONTROL PANEL OPERATING PROCEDURES
3.4 OPERATING MENU
The Operating Menu displays a number of key operating parameters for the unit as listed in Table 3-2. This menu is “Read-Only” and does not allow personnel to change or adjust any displayed items. Since this menu is “Read-Only”, it can be viewed at any time without entering a password. Pressing the arrow key to display the menu items in the order listed (Top-Down). Pressing the arrow key will display the menu items in reverse order (Bottom-Up).
3.5 SETUP MENU
The Setup Menu (Table 3-3) permits the operator to enter the unit password (159) which is required to change the menu options. To prevent unauthorized use, the password will
Table 3-2. Operating Menu
Available Choices or Limits
Menu Item Display Minimum Maximum Default
Status Message
time-out after 1 hour. Therefore, the correct password must be reentered when required. In addition to permitting password entries, the Setup Menu is also used to enter date and time, units of temperature measurements and entries required for external communication and control of the unit via the RS-232 port. A view-only software version display is also provided to indicate the current Control Box software version.
NOTE
The Outdoor Temp display item shown with an asterisk in Table 3-2 will not be displayed unless the Outdoor Sensor function has been enabled in the Configuration Menu (Table 3-4).
Active Setpoint 40°F 240°F
Aux Temp 30°F 245°F
Outdoor Temp* -70°F 130°F
Fire Rate In 0% Max Fire Rate
Flame Strength 0% 100%
Run Cycles 0 999,999
Run Hours 0 999,999
Fault Log 0 9 0
Table 3-3. Setup Menu
Available Choices or Limits
Menu Item Display Minimum Maximum Default
Passsword 0 9999 0
Language English English
Time 12:00 am 11:59 pm
Date 01/01/00 12/31/99
Unit of Temp Fahrenheit or Celsius Fahrenheit
Comm Address 0 127 0
Baud Rate 2400, 4800, 9600, 19.2K 9600
Software Ver 0.00 Ver 9.99
3-5
CONTROL PANEL OPERATING PROCEDURES
3.6 CONFIGURATION MENU
The Configuration Menu shown in Table 3-4 permits adjustment of the Internal Setpoint (Setpt) temperature regardless of whether the valid password has been entered. Setpt is required for operation in the Constant Setpoint mode. The remaining options in this menu require the valid password to be entered, prior to changing existing entries. This menu contains a number of other configuration settings which may or may not be displayed, depending on the current operating mode setting.
Table 3-4. Configuration Menu
Available Choices or Limits
Menu Item Display Minimum Maximum Default
Internal Setpt Lo Temp Limit Hi Temp Limit 130°F
Unit Type Boiler or Water Heater Boiler
Unit Size 0.5 MBTU, 1.0 MBTU
1.5 MBTU, 2.0 MBTU
2.5 MBTU, 3.0 MBTU
Boiler Mode Constant Setpoint,
Remote Setpoint,
Combination
Outdoor Reset
NOTE
The Configuration Menu settings shown in Table 3-4 are Factory-Set in accordance with the requirements specified for each individual order. Therefore, under normal operating conditions, no changes will be required.
1.0 MBTU
Constant
Setpoint
Direct Drive
Remote Signal (If Mode = Remote Setpoint, Direct Drive or Combination)
Bldg Ref Temp (If Mode = Outdoor Reset)
Reset Ratio (If Mode = Outdoor Reset)
Outdoor Sensor Enabled or Disabled Disabled
System Start Tmp (If Outdoor Sensor = Enabled)
Setpt Lo Limit 40°F Setpt Hi Limit 60°F
Setpt Hi Limit Setpt Lo Limit 220°F 200°F
Temp Hi Limit 40°F 240°F 210°F
Max Fire Rate 40% 100% 100%
Pump Delay Timer 0 min. 30 min. 0 min.
Aux Start On Dly 0 sec. 120 sec. 0 sec.
4 – 20 mA/1 – 5V
0 -20 mA/0 – 5V
PWM Input (BMS)
Network
40°F 230°F 70°F
0.1 9.9 1.2
30°F 100°F 60°F
4 – 20 mA,
1-5V
3-6
Loading...
+ 97 hidden pages