ZXSDRR8882HardwareInstallationGuide
Figure4-8ConnectingtheMonitoringCable
2.ConnectendBoftheMONcabletoanexternalmonitoringdeviceordrycontact.
–EndofSteps–
4-10
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 2
4.6ConnectingtheAISGCable
1.ConnectendAoftheAntennaInterfaceStandardsGroup(AISG)cabletothe commissioninginterface(AISG)ofZXSDRR8882,andtightenthescrew,asshown inFigure4-9.
Figure4-9ConnectingtheAISGCable
Chapter4Cabling
4-11
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 3
ZXSDRR8882HardwareInstallationGuide
2.ConnectendBoftheAISGcabletothecontrolinterfaceofanelectricallytuneddevice andtightenthescrew.
3.WaterproofbothconnectorsoftheAISGcable.
–EndofSteps–
4.7ConnectingtheFeederJumper
Context
TheRFjumperisusedtoconnectthefeedertothefeederinterfaceofZXSDRR8882. Thejumpershouldbeconnectedafterthemainfeederisconnected.
Normally,useanished2m1/2"jumperastheRFjumper,ormakeajumperasrequired bytheon-sitecondition,refertoZXC10BSSBCDMA2000BaseStationSystemCable PreparationManualforPreparinginstructions.
1.ConnecttheDINmaleconnectoroftheRFjumpertotheRFantennainterfaceofthe device,asshowninFigure4-10.
4-12
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 4
Figure4-10ConnectingtheFeederJumper
Chapter4Cabling
2.ConnecttheDINmaleconnectoroftheRFjumpertotheDINfemaleconnectorofthe mainfeeder.
3.Waterproofbothconnectorsofthefeederjumper.
–EndofSteps–
4-13
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 5
ZXSDRR8882HardwareInstallationGuide
Thispageintentionallyleftblank.
4-14
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 6
Chapter5
Post-InstallationCheck
CheckingtheDeviceInstallation
ItemTaskRemark
Checkingthedeviceinstallation
Makesurethatthedeviceinstallation
positionisinlinewiththedesign
drawing.
Makesurethatthedeviceisinstalled
rmlyandmeetstheshockproof
requirements.
Makesurethatthedeviationofthe
deviceinhorizonandverticalisless
than3mm.
Makesurethatthedevicesurface
iscleanandtidy,thepaintonthe
surfaceisintact,andallpartsofthe
deviceareinplaceandundamaged.
Makesurethattheidentiersof
thedevicearecorrect,clear ,and
complete.
Makesurethatallscrewsofthe
deviceareproperlytightened.
Makesurethattheatwashers
andspringwashersareinstalledin
correctorder.
Makesurethattheunused
connectorcapsaretightened.
CheckingtheCableConnection
ItemTaskRemark
Verifyingthatcablingmeetsthe
specications
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Makesurethatallcablesarelaid
straightwithoutuctuationandskew
andwithoutcrosslinesandying
lines.
Makesurethatallcablesturn
smoothlyandtheexternalofeach
5-1
Page 7
ZXSDRR8882HardwareInstallationGuide
ItemTaskRemark
curveisverticallyorhorizontally
straight.
Makesurethatallcablesare
labelledatthebothends,theuse
ofeachcableisdescribed,andthe
contentsinthelabelsatbothends
arethesame.
Makesurethattheconnectionis
solid,ingoodcontact,plugged
correctlyandwithoutbreakand
bend.
Makesurethatcabletiesareevenly
spacedanduniformlyandproperly
tied.Makesurethatunnecessary
sectionofacabletieiscutoff.
Checkingthepowercableand
groundingcableconnections
Makesurethattheterminalsof
allcablesareinstalledwithat
washersandspringwashersand
waterproofmeasuresaretakento
cableconnectorsandgroundingkit.
Makesurethatthepowercableand
groundingcablearelaidseparately
fromothercables.Makesurethat
thepowercableandsignalcables
arelaidondifferentcableracks
whentherearemultiplecableracks.
Makesurethatthehorizontal
distancebetweenthecablesismore
than100mmwhenthepowercable
andsignalcablearelaidinparallel
onasamecablerack.
Makesurethatthedistancebetween
thecablesisnolessthan300mm
whentheACpowercable,DC
powercable,andsignalcable(such
astheantennafeeder)arelaidin
parallel.
Makesurethatthepowercableand
groundingcablearemadeofthe
entirecablewithoutjoints.
5-2
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 8
ItemTaskRemark
Makesurethatonlyonedeviceis
connectedtoeachgroundingpoint
onthegroundingbar.
Makesurethatthepowercableand
groundingcablearenotcoiledand
theunnecessarysectioniscutoff.
Makesurethatthecoppertubular
lugsatbothendsofthepowerline
orgroundingcableareweldedor
crimpedrmly.
Makesurethatthegroundingpath
isasshortaspossible.
Makesurethatthebarewireandlug
handleontheconnectionterminal
arewrappedwiththeinsulatingtape
ortubedintheheat-shrinktube.
Chapter5Post-InstallationCheck
Checkingtheopticalber
connection
Makesurethattheminimalturning
radiusofanoutdooropticalcable
is90mmandtheminimalturning
radiusofanindooropticalcableis
30mm.
Makesurethattheopticalberis
notintertwined.
Makesurethatthecablingtransition
issmoothandthedistancebetween
everytwocabletiesislessthan0.5
m.
Makesurethatthelabelsatboth
endsoftheopticalberareclear.
Makesurethattheconnectorsat
bothendsoftheopticalberare
tightened.
Makesurethatthebercableis
undamaged.
5-3
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 9
ZXSDRR8882HardwareInstallationGuide
ItemTaskRemark
Checkingtheantennafeeder
connection
MakesurethatthefeederVSWRis
lessthan1.5.
Makesurethattheconnectors
atbothendsofthefeederare
tightened.
MakesurethattheDIN-typeand
N-typeconnectorsareconnected
correctly.
Makesurethattheantennaand
jumperareconnectedcorrectly
andthejumperandfeederare
connectedcorrectly.
Makesurethatthewater-trapcurve
ismadebeforethecableisledinto
theequipmentroom,andmake
surethatthelowestpointofthe
water-trapcurveis10cm–20cm
lowerthantheloweredgeofthe
entranceinthefeederwindow.
Makesurethatthefeederwindowis
sealedwithreproofmaterial.
Makesurethattheunusedantenna
feedercableconnectorsarecovered
bycapsortightenedbydummy
loads.
5-4
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 10
Chapter6
ConcludingRoutines
Beforeleavingthesite,completethefollowing:
lCleanupthesiteandremoveobjectslikewrappingpaperandcablepieces. lDisposeofwastematerialaccordingtolocalregulations. lCompletethesiteinstallationreport. lHandovertheSiteInstallationDocumentationtothepersonresponsibleforthesite. lIfthesiteisinoperation,contacttheOMCorNMCtoinformthattheinstallationis
completed.
lLockalldoorsandgatestothesite.
6-1
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 11
ZXSDRR8882HardwareInstallationGuide
Thispageintentionallyleftblank.
6-2
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 12
AppendixA
WaterproofingOutdoor Connectors
Prerequisite
Afterthewholeantennafeedersystemhasbeeninstalledandtested,makesurethatthe outdoorjumpersandfeederconnectorsmustbewaterproof.
Context
Waterproongoutdoorconnectorsisa“1+3+3”process,thatis,wrappingonelayerof
PVCinsulatingtape,threelayersofwaterproofinsulatingtape,andthreelayersofPVC
insulatingtapearoundaconnector.
ThePVCinsulatingtapeisusedtopreventconnectorsfromdamage,ageing,andwater ingress.
1.Cleanthefeederconnectorandfeedergroundingclip.
2.WrapalayerofPVCinsulatingtapearoundtheconnector. Afterconnectingtheconnectorproperly,wrapalayerofelectricalinsulatingtapefor oneandahalfcircleinthedirectionoftighteningtheconnector,asshowninFigure
A-1.Theexceededwrappinglengthis10mm.Duringwrapping,donotoverstretch
theinsulatingtape.
FigureA-1WrappingOneLayerofInsulatingTape
A-1
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 13
ZXSDRR8882HardwareInstallationGuide
3.WrapthreelayersofwaterproofinsulatingtapearoundthePVCtape.
Duringwrapping,stretchtheself-adhesivetapetwotimestheoriginallength.Foreach connector,useabout50cmwaterprooftapetowrapthreelayers,asshowninFigure
A-2.
Thewrappingdirectionmustbethesameasthatoftighteningafeederconnector. Thispreventsthefeederconnectorfrombeingdisconnectedduringwrapping.After that,gripandpinchthewrappedtaperepeatedlytoensurethatthetapeandfeederor feederconnectoraresecurelyadhered.
FigureA-2WrappingThreeLayersofWaterproofT ape
Note:
Wraptherstlayerofinsulatingtapefrombottomtotop,thesecondlayerfromtopto bottom,andthethirdlayerfrombottomtotop.Theupperlayercovers1/3ofthenext layerinlength.Thisensuresthatthefeederorfeederconnectoriswaterproof.During wrapping,donotcutoffthetape.Thewrappinglengthmustbe20mmlongerthan thatofthefeederconnector.
4.WrapthreelayersofUVresistancetape.
Thewrappingdirectionmustbethesameasthatoftighteningafeederconnector.The upper-layertapecovers1/2thebottom-layertapeinlength.Thewrappinglengthof theUVresistancetapemustbe10mmlongerthanthatofthewaterprooftape.Wrap threelayers.Afterthat,gripandpinchboththeUVresistancetapeandwaterproof tapetoensurethattheyaresecurelyadhered,asshowninFigureA-3.
A-2
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 14
AppendixAWaterproongOutdoorConnectors
FigureA-3WrapThreeLayersofUVResistanceTape
5.Fastenbothendsofthetape. UseblackUVresistancecabletiestobundlebothendsofthetape,asshownin
FigureA-4.Cutofftheexceededcabletiesandreserveabout3mmforexpansionin
high-temperatureweather.
FigureA-4FixingBothEnds
–EndofSteps–
A-3
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 15
ZXSDRR8882HardwareInstallationGuide
Thispageintentionallyleftblank.
A-4
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 16
AppendixB
LabelingSpecifications
ZTECorporationusesindoorlabelsandoutdoorlabels.
lOutdoorlabelsarehangtagsthataredeliveredwiththedevice. lIndoorlabelsaretheselfadhesivepaper-printedlabelsthatmayneedtobeproduced
atsiteifnecessary.
Labelsmustmeetthefollowingrequirements:
lThespecialpasterofZTECorporationmustbeusedforpaperlabels. lContentsonrackrowlabelsandcolumnlabelsshouldmeettheengineeringdesign
requirements.
lBoardsshouldnotbelabeledandidentiersonaboardshouldnotbealtered. lAlllabelsshouldbeattachedtofacethesamedirection.Thesidethatindicates
wherethecableisconnectedtoshouldfaceupwardortowardstheoperationand maintenancepositionfortheconvenienceofbeingread.
lAllcablessuchasthepowercable,groundingcable,transmissioncable,andfeeder
shouldbelabeledatbothends.
lForopticalbers,networkcables,andtrunkcables,anindoorlabelshouldbepasted
20mmawayfromtheconnectoratbothendseach.
lOutdoorlabelsshouldbesecuredwithcabletiesatthesameheightanddirection.
B-1
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 17
ZXSDRR8882HardwareInstallationGuide
Thispageintentionallyleftblank.
B-2
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 18
AppendixC
AssemblingthePortalFrame
1.Assembletheuprightpostsandbaseplate:Securetheuprightpostsonthebaseplate withM5×16screws,asshowninFigureC-1.
FigureC-1AssemblingtheUprightPostsandBasePlate
2.Securethecoverplatebetweentheuprightposts:Securethecoverplatebetweenthe uprightpostswithM5×16screws,asshowninFigureC-2.
C-1
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 19
ZXSDRR8882HardwareInstallationGuide
FigureC-2SecuringtheCoverPlateBetweentheUprightPosts
3.Assemblethesidesupports:SecurethesidesupportswithM5×16screws,asshown inFigureC-3.
C-2
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 20
FigureC-3InstallingtheSideSupports
AppendixCAssemblingthePortalFrame
4.Drillholesandtightentheexpansionbolts/screws:
a.Usethedrillingtemplateandmarkthedrillingpositionswithamarker.
b.Drillholesatthemarkeddrillingpositionsbyusinganelectricpercussiondrill(Ф12
drillbit),andtightentheexpansionbolts/screws,asshowninFigureC-4.Usea vacuumcleanertocleanthedustwhendrillingholes.
C-3
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 21
ZXSDRR8882HardwareInstallationGuide
FigureC-4InstallingtheExpansionBolts
c.Ifinstallingtheportalframeonacementoor,secureitwithM10×100expansion
screws,asshowninFigureC-5.
FigureC-5SecuringthePortalFrameonaCementFloor
d.Ifinstallingtheportalframeinashelter,secureitwithM10×40tappingscrews,
asshowninFigureC-6.
C-4
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 22
FigureC-6SecuringthePortalFrameinaShelter
–EndofSteps–
AppendixCAssemblingthePortalFrame
C-5
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 23
ZXSDRR8882HardwareInstallationGuide
Thispageintentionallyleftblank.
C-6
SJ-20111021104623-004|2012–01-30(R1.1)ZTEProprietaryandCondential
Page 24
Figures
Figure1-1ZXSDRR8882.........................................................................................1-1
Figure1-2RecommendedSpaceforInstallingZXSDRR8882(Unit:mm)................
Figure1-3MinimumSpaceforInstallingZXSDRR8882(Unit:mm).........................1-5
Figure1-4FlowchartofInstallingZXSDRR8882......................................................1-8
Figure2-1PIMDCAppearance.................................................................................2-1
Figure2-2SecuringthePIMDCMountingBaseontheFrontoftheDevice...............2-2
Figure2-3SecuringthePIMDContheFrontoftheDevice.......................................2-2
Figure2-4SecuringthePIMDCMountingBaseontheSideoftheDevice................2-3
Figure2-5SecuringthePIMDContheSideoftheDevice........................................
Figure3-1DrillingPositions......................................................................................
Figure3-2SecuringtheWallMountingAssembly.....................................................3-8
Figure3-3InstallDeviceHooks(TwoU-shapedHooks)............................................
Figure3-4MountingtheDeviceontheWallMountingAssembly..............................3-9
Figure3-5SecuringtheDevice...............................................................................3-10
Figure3-6DrillingPositions....................................................................................
Figure3-7SecuringtheWallMountingAssembly...................................................
Figure3-8InstallingtheRRUMountingBaseontheBackoftheDevice.................3-12
1-4
2-3
3-7
3-9
3-11
3-12
Figure3-9MountingtheDevice..............................................................................
Figure3-10SecuringtheDevice.............................................................................3-13
Figure3-11AttachingtheWallMountingAssemblytothePoleMounting
Piece....................................................................................................
Figure3-12SecuringthePoleMountingPiece.......................................................3-15
Figure3-13SecuringTwoSetsofInstallationAssembliesBacktoBack.................
Figure3-14InstallingtheExtensionPiecesandWallMountingAssembly...............3-16
Figure3-15InstallDeviceHooks(TwoU-shapedHooks)........................................
Figure3-16MountingandSecuringtheDevice.......................................................
Figure3-17InstallingtheRRUMountingBaseontheBackoftheDevice...............
Figure3-18MountingtheRRUMountingBaseontheSideoftheDevice...............3-18
Figure3-19SecuringthePoleMountingAssembly.................................................3-19
Figure3-20InstallingtheParallelMountingBase...................................................3-19
Figure3-21Front-MountingtheDevice(Single-UnitSolution/Double-Unit
Solution)...............................................................................................3-20
3-13
3-14
3-15
3-16
3-17
3-18
I
Page 25
ZXSDRR8882HardwareInstallationGuide
Figure3-22Front-MountingtheDevice(Triple-UnitSolution)..................................3-21
Figure3-23Side-MountingtheDevice(Triple-UnitSolution)...................................
Figure3-24Side-MountingtheDevice(Quadro-UnitSolution)................................3-22
Figure3-25SecuringtheDevice.............................................................................3-23
Figure3-26InstallingtheUniversalSheet-MetalKit................................................3-24
Figure3-27InstallDeviceHooks(TwoU-shapedHooks)........................................3-24
Figure3-28MountingtheDevice............................................................................
Figure3-29SecuringtheDevice.............................................................................3-25
Figure3-30MountingtheAdaptorPlate..................................................................3-26
Figure3-31MountingthePoleMountingClamp.....................................................3-26
Figure3-32NewTypeofProtectionShade.............................................................3-27
Figure3-33InstallingtheProtectionShade.............................................................3-28
Figure4-1FlowchartofConnectingExternalCables.................................................4-1
Figure4-2ConnectingtheProtectiveGroundingCable.............................................
Figure4-3InsertingthePowerCableIntotheSealingComponent...........................
Figure4-4InstallingthePowerCableIntotheT erminalHole....................................4-4
Figure4-5FixingthePowerCable............................................................................
3-22
3-25
4-2
4-3
4-5
Figure4-6ConnectingtheDCPowerCable.............................................................4-6
Figure4-7ConnectingtheOpticalFiber....................................................................
Figure4-8ConnectingtheMonitoringCable...........................................................
Figure4-9ConnectingtheAISGCable...................................................................
Figure4-10ConnectingtheFeederJumper............................................................4-13
FigureA-1WrappingOneLayerofInsulatingTape...................................................
FigureA-2WrappingThreeLayersofWaterproofT ape.............................................A-2
FigureA-3WrapThreeLayersofUVResistanceT ape.............................................
FigureA-4FixingBothEnds.....................................................................................
FigureC-1AssemblingtheUprightPostsandBasePlate........................................
FigureC-2SecuringtheCoverPlateBetweentheUprightPosts.............................
FigureC-3InstallingtheSideSupports....................................................................
FigureC-4InstallingtheExpansionBolts.................................................................C-4
FigureC-5SecuringthePortalFrameonaCementFloor........................................C-4
FigureC-6SecuringthePortalFrameinaShelter...................................................C-5
4-8
4-10
4-11
A-1
A-3
A-3
C-1
C-2
C-3
II
Page 26
Tables
Table1-1ZTEPartsandEquipmentListforaRRU..................................................1-2
Table1-2ToolsandMetersList.................................................................................
Table3-1InstallationPositionsSupportedbytheInstallationAssembliesof
ZXSDRR8882.........................................................................................
Table3-2InstallationAssemblyofMountingKit1(Wall-Mounted).............................3-2
Table3-3InstallationAssembliesofMountingKit2(Wall-Mounted)..........................
Table3-4InstallationAssembliesofMountingKit1(Pole-Mounted)..........................3-3
Table3-5InstallationAssembliesofMountingKit2(Pole-Mounted)..........................3-4
Table3-6InstallationAssembliesoftheMountingKit1(Portal
Frame-Mounted)......................................................................................3-5
Table3-7InstallationAssembliesofMountingKit2(PortalFrame-Mounted)............3-6
1-3
3-1
3-3
III
Page 27
Thispageintentionallyleftblank.
Tables
Page 28
Index
A
Acceptance..........................................
appearance..........................................
C
Cabling.................................................
ConcludingRoutines............................
ConnectingtheDCPowerCable..........4-5
ConnectingtheOpticalFiber................4-7
CountingGoods...................................
D
Delivery................................................
E
EnvironmentInspection........................1-2
H
Handover.............................................
I
Inspection.............................................
InstallationAssemblies.........................
InstallationFlow...................................
InstallationOverview............................
installationpositions.............................3-1
P
PIMDC.................................................
1-7
pole....................................................
1-1
portalframe........................................3-23
Post-InstallationCheck.........................5-1
PreparationforInstallation....................
4-1
protectionshades...............................3-27
6-1
S
SpaceRequirement..............................
1-5
T
tools.....................................................
1-7
U
UnpackingCarton................................1-6
UnpackingCrate..................................1-6
W
1-7
Waterproongoutdoor
connectors..........................................
WaterproongOutdoor
1-7 3-2 1-7 1-1
Connectors.........................................A-1
2-1
3-14
1-2
1-3
1-2
A-1
L
LabelingSpecications.........................
M
MaterielDescription..............................
Meters..................................................1-2
MounttheDeviceonaWall..................
MountingKit1....................................
MountingKit2....................................3-17
B-1
1-2
3-7
3-14
V
Page 29
Thispageintentionallyleftblank.