__________________________________________________________________________
Infrastructure Installation Guide
WHEREPORT INSTALLATION
___________________________________________________________________ 8-1
WherePort Installation D0060 rev C
Copyright WhereNet Corp. 2001
WhereNet - Confidential
__________________________________________________________________________
Infrastructure Installation Guide
Table of Contents Page
8 WHERE PORT INSTALLATION 2
8.1 EQUIPMENT REQUIRED 3
8.2 SWITCH SETTINGS 3
8.3 POWER SUPPLIES 4
8.4 WIRING 5
8.5 MOUNTING 7
8.6 INDICATOR LIGHT 8
Table of Figures Page
FIGURE 8-1 WHERE PORT SWITCH 4
FIGURE 8-2 POWER AND SIGNAL WIRING 7
___________________________________________________________________ 8-2
WherePort Installation D0060 rev C
Copyright WhereNet Corp. 2001
WhereNet - Confidential
__________________________________________________________________________
Infrastructure Installation Guide
8 WHEREPORT INSTALLATION
Every WherePort installation should be accompanied by a worksheet from the
responsible WhereNet Account Manager indicating required mounting location,
orientation and switch settings.
8.1 Equipment required
In addition to the WherePort(s) the following equipment is required:
• AC power supply (see 8.3)
• Interconnect power cable: Belden pn 9156
8.2 Switch settings
Removing the black rubber plug on the side of the WherePort gives access to the
switches. The one closest to the front is the power/phase switch; the one closest to
the metal heat sink is the ID switch. Set the switches according to the worksheet by
turning the arrowhead to point to the desired setting with a small straight screwdriver.
Replace the plug by applying pressure to the center of it until it seats.
___________________________________________________________________ 8-3
WherePort Installation D0060 rev C
Copyright WhereNet Corp. 2001
WhereNet - Confidential