Zebra MC9500-K Mobile Computer CRD9500-F800ER 8-bay Ethernet/Charge Cradle Installation Guide English

CRD9500-F800ER 8-bay Ethernet/Charge Cradle
Installation Guide
WALL MOUNTING
CAUTION
Use mounting hardware (screws and/or
anchors) appropriate for the type of wall you
are mounting the bracket onto. The 8-bay
Cradle mounting slots dimensions are 5 mm
(0.2 in.). Fasteners must be able to hold a
minimum of 18.1 Kg (40 lbs.)
For proper installation consult a professional
360.36 mm
13.4 in.
270.50 mm
10.65 in.
Zebra reserves the right to make changes to any product to improve reliability, function, or design. Zebra does not assume any product liability arising out of, or in connection with, the application or use of any product, circuit, or application described herein. No license is granted, either expressly or by implication, estoppel, or otherwise under any patent right or patent, covering or relating to any comb or process in which Zebra products might be used. An implied license exists only for equipment, circuits, and subsystems contained in Zebra products.
ination, system, apparatus, machine, material, method,
installer. Failure to install the 8-bay Cradle
properly can possibly result in damage to the
hardware.
the dimensions indicated on the right.
The screw heads should protrude
2.5 mm (3/32”) from the wall.
3. Connect an Ethernet cable to Port 1 on
the top cradle.
4. Align the 8-bay cradle’s four mounting
Mounting Hole
Zebra Technologies Corporation Lincolnshire, IL U.S.A. http://www.zebra.com
Zebra and the Zebra head graphic are registered trademarks of ZIH Corp. The Symbol logo is a registered trademark of Symbol Technologies, Inc., a Zebra Technologies company. © 2015 Symbol Technologies, Inc.
72-144328-02 Revision A — February 2015
holes with the four screws on the wall.
5. Place the 8-bay cradle on the screws
and ensure that the cradle is secure.
6. Plug the Power cable into an AC
outline.
SHELF MOUNTING
1. Attach the shelf bracket to the bottom
of the 8-bay cradle using four M4x0.7
8 mm screws.
2. Place the 8-bay cradle on the shelf
with end of the shelf bracket hanging
over the shelf lip.
3. Slide the J-bracket onto the shelf lip
and shelf bracket and secure using
two M4x0.7 8 mm screws.
4. Feed the belt through the bracket slot
and the J-bracket slot.
5. Feed the belt through the buckle.
Shelf Bracket
J-Bracket
Shelf Bracket
Strap
6. Slide the J-backet onto the shelf lip.
7. Tighten the belt.
8. Connect an Ethernet cable to Port 1 on
the top cradle.
9. Plug the Power cable into an AC
outline.
Strap Buckle
Shelf Bracket
J-bracket
J-bracket
Loading...