CONTENTS
3" Lag Screw
2" Screw
2" x 4" Blocking
10" Ductwork
Ceiling Joists
1 Cover, duct
4 Bolt, 5/16" - 18 x 1 1/4"
22 Screw, #12 - 24 x 3/4"
Note: The duct cover must be structurally secured to the
ceiling prior to installing the ventilation hood.
PRO ISLAND HOOD DUCT COVER INSTALLATION
Position the duct cover so the threaded inserts are
1
facing downward.
Use the four 3" lag screws provided with the hood to
2
secure the top of the duct cover to the ceiling structure.
If additional structure is available, use the 2" screws
3
provided to secure the remainder of the duct cover to
the ceiling structure.
Pro Island Hood Duct Cover Installation
wolfappliance.com 800.222.7820
Use the 3/4" screws provided to secure the remainder
6
of the hood to the duct cover.
Position the island hood under the duct cover and
4
loosely install the four 1 1/4" bolts provide with the duct
cover.
Note: Verify the electrical supply has been routed to the
appropriate location on the hood prior to connecting
duct work to the hood.
Verify the duct cover is aligned with the hood, then
5
tighten all four bolts.
9012823 REV-A 02/2017
Page 1 of 1
*9012823$REVA*