INSTALLATION &
OPERATION MANUAL
VCB25, VCB36, VCB47 SERIES
CHARBROILERS
MODELS
VCB25S ML-44908Z
VCB25M ML-44963Z
VCB36 ML-44966
VCB36S ML-44909Z
VCB36C ML-44967
VCB36M ML-44964Z
VCB47S ML-44910Z
VCB47M ML-44965Z
Model VCB36C
VULCAN-HART COMPANY, P.O. BOX 696, LOUISVILLE, KY 40201-0696, TEL. (502) 778-2791
FORM 31167 (Jan. 2001)
– 1 –
IMPORTANT FOR YOUR SAFETY
THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS
EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND
ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL.
POST IN A PROMINENT LOCATION THE INSTRUCTIONS TO BE FOLLOWED IN THE
EVENT THE SMELL OF GAS IS DETECTED. THIS INFORMATION CAN BE OBTAINED
FROM THE LOCAL GAS SUPPLIER.
IMPORTANT
IN THE EVENT A GAS ODOR IS DETECTED, SHUT
DOWN UNITS AT MAIN SHUTOFF VALVE AND
CONTACT THE LOCAL GAS COMPANY OR GAS
SUPPLIER FOR SERVICE.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER
FLAMMABLE VAPORS OR LIQUIDS IN THE
VICINITY OF THIS OR ANY OTHER APPLIANCE.
WARNING
IMPROPER INSTALLATION, ADJUSTMENT,
ALTERATION, SERVICE OR MAINTENANCE CAN
CAUSE PROPERTY DAMAGE, INJURY OR DEATH.
READ THE INSTALLATION, OPERATING AND
MAINTENANCE INSTRUCTIONS THOROUGHLY
BEFORE INSTALLING OR SERVICING THIS
EQUIPMENT.
IN THE EVENT OF A POWER FAILURE, DO NOT
ATTEMPT TO OPERATE THIS DEVICE.
© VULCAN-HART COMPANY, 2001
– 2 –
INSTALLATION, OPERATION AND CARE OF
MODEL VCB SERIES CHARBROILERS
PLEASE KEEP THIS MANUAL FOR FUTURE USE
GENERAL
Vulcan-Hart Charbroilers are produced with quality workmanship and material. Proper installation,
usage and maintenance of your charbroiler will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions
provided.
INSTALLATION
Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications
on the rating plate located on the right inside panel. If the supply and equipment requirements do not
agree, do not proceed with the installation. Contact your dealer or Vulcan-Hart Company immediately.
UNPACKING
This charbroiler was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the charbroiler is found to be damaged, save the packaging material
and contact the carrier within 15 days of delivery.
Carefully unpack charbroiler and place in a work-accessible area as near to its final installed position
as possible.
LOCATION
The equipment area must be kept free and clear of combustible substances.
This charbroiler is design certified for installation on a non-combustible counter with 4" (10 cm) legs,
or on a combustible floor with a 24" (61 cm) high cabinet or stand with the following minimum clearances
to adjacent wall construction:
ecnaraelCmuminiM
:morF
kcaB
sediS
leveLdirGevobA
leveLdirGwoleB
leveLdirGevobA
leveLdirGwoleB
elbitsubmoC
noitcurtsnoC
)mc03("21
)mc8("3
)mc32("9
)mc8("3
"0
"0
elbitsubmoC-noN
noitcurtsnoC
)mc8("3
)mc8("3
– 3 –