Vulcan VCB25S Installation Manual

OPERATION MANUAL
VCB25, VCB36, VCB47 SERIES CHARBROILERS
MODELS VCB25S ML-44908Z
VCB25M ML-44963Z VCB36 ML-44966 VCB36S ML-44909Z VCB36C ML-44967 VCB36M ML-44964Z VCB47S ML-44910Z VCB47M ML-44965Z
Model VCB36C
VULCAN-HART COMPANY, P.O. BOX 696, LOUISVILLE, KY 40201-0696, TEL. (502) 778-2791
FORM 31167 (Jan. 2001)
– 1 –
IMPORTANT FOR YOUR SAFETY
THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL.
POST IN A PROMINENT LOCATION THE INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE SMELL OF GAS IS DETECTED. THIS INFORMATION CAN BE OBTAINED FROM THE LOCAL GAS SUPPLIER.
IMPORTANT
IN THE EVENT A GAS ODOR IS DETECTED, SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE.
WARNING
IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
IN THE EVENT OF A POWER FAILURE, DO NOT ATTEMPT TO OPERATE THIS DEVICE.
© VULCAN-HART COMPANY, 2001
– 2 –
INSTALLATION, OPERATION AND CARE OF
MODEL VCB SERIES CHARBROILERS
PLEASE KEEP THIS MANUAL FOR FUTURE USE
GENERAL
Vulcan-Hart Charbroilers are produced with quality workmanship and material. Proper installation, usage and maintenance of your charbroiler will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.
INSTALLATION
Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications on the rating plate located on the right inside panel. If the supply and equipment requirements do not agree, do not proceed with the installation. Contact your dealer or Vulcan-Hart Company immediately.
UNPACKING
This charbroiler was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the charbroiler is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Carefully unpack charbroiler and place in a work-accessible area as near to its final installed position as possible.
LOCATION
The equipment area must be kept free and clear of combustible substances.
This charbroiler is design certified for installation on a non-combustible counter with 4" (10 cm) legs, or on a combustible floor with a 24" (61 cm) high cabinet or stand with the following minimum clearances to adjacent wall construction:
ecnaraelCmuminiM
:morF
kcaB
sediS
leveLdirGevobA leveLdirGwoleB
leveLdirGevobA leveLdirGwoleB
elbitsubmoC noitcurtsnoC
)mc03("21
)mc8("3
)mc32("9
)mc8("3
"0 "0
elbitsubmoC-noN
noitcurtsnoC
)mc8("3 )mc8("3
– 3 –
Loading...
+ 5 hidden pages