To avoid possible damage to this Multi-Station Gym, please follow these assembly steps in the correct order. Before
proceeding, find your new Multi-Station Gym serial number located on the side of the leg press floor support (AC3),
and enter here:
Refer to this number when calling for service, and enter this serial number on your Warranty Card and in your
own records. Be sure to read your Assembly/Owner’s Guide before using your new Multi-Station Gym.
If any parts, hardware or tools are missing, please call 1.800.335.4348, Extension 12.
NOTE: During assembly, it is recommended to ensure that all bolts are in place and partially threaded
before completely tightening any one bolt. During assembly steps 1 thru 6, do not completely tighten
any bolts until completion of Step 6. Also, it is recommended to apply grease to the fittings of the
pillow block bearings on the Leg Press station. This will ensure smooth operation and prevent rust.
4
STEP
6
STEP
4
General
Warning
Decal
STEP
5
STEP
STEP
13
3
STEP
15
STEP
2
STEP
1
STEP
14
Serial #
Pinch Point
Decal
5
ORANGE BAG
HARDWARE INCLUDED
M10 x 60 Bolt
Quantity: 2
BLUE BAG
M10 x 25 Bolt
Quantity: 4
M10 x 78 Bolt
Quantity: 4
M6 x 8 Set Screw
Quantity: 4
M10 Nylon Nut
M10 x 65 Bolt
Quantity: 2
12 x 26 x 2
Flat Washer
Quantity: 1
Quantity: 6
10.2 x 22 x 2
Flat Washer
Quantity: 12
10.2 x 18.4 x 2.5
Lock Washer
Quantity: 5
M10 x 25 Bolt
M10 x 62 Bolt
Quantity: 6
M10 x 72 Bolt
Quantity: 1
Quantity: 1
10.2 x 22 x 2
M10 Nylon Nut
Quantity: 7
5 3/4” Shaft
(illustration not to scale)
Quantity: 1
8 7/16” Axle
(illustration not to scale)
Quantity: 1
Flat Washer
Quantity: 18
6
PINK BAG
HARDWARE INCLUDED
M10 x 62 Bolt
GREEN BAG
M10 x 62 Bolt
Quantity: 6
Quantity: 4
10.2 x 22 x 2
Flat Washer
Quantity: 10
10.2 x 22 x 2
Flat Washer
Quantity: 26
M10 Nylon Nut
Quantity: 6
M10 Nylon Nut
Quantity: 10
M10 x 67 Bolt
Quantity: 4
M10 x 100 Bolt
Quantity: 2
M10 x 25 Bolt
Quantity: 4
10.2 x 18.4 x 2.5
Lock Washer
Quantity: 6
7
BLACK BAG
HARDWARE INCLUDED
12 x 26 x 2
Flat Washer
Quantity: 2
M12 x 25 Bolt
Quantity: 2
10.2 x 22 x 2
Flat Washer
Quantity: 16
12.2 x 21 x 2.5
Lock Washer
Quantity: 2
M10 x 62 Bolt
Quantity: 8
M10 Nylon Nut
Quantity: 8
Pull Pin A
(illustration not to scale)
Quantity: 4
(illustration not to scale)
Quantity: 2
Axle
Pull Pin B
(illustration not to scale)
Quantity: 1
Sleeve
(illustration not to scale)
Quantity: 2
8
YELLOW BAG
HARDWARE INCLUDED
Accessory Storage Hook
(illustration not to scale)
Quantity: 3
M8 x 20 Bolt
Quantity: 7
Attachment Clips Z30
(illustration not to scale)
Quantity: 4
Add-on Weight Storage Posts
(illustration not to scale)
Quantity: 2
M5 x 15 Screw
Quantity: 8
Slip on nuts Z31
(illustration not to scale)
Quantity: 8
10.2 x 22 x 2
Flat Washer
Quantity: 2
M5 x 15 Bolt
Quantity: 6
M10 x 25 Bolt
Quantity: 2
10.2 x 18.4 x 2.5
Lock Washer
Quantity: 2
9
RED BAG
M10 x 25 Bolt
Quantity: 3
HARDWARE INCLUDED
M6 x 8 Set Screw
Quantity: 1
10.2 x 22 x 2
Flat Washer
Quantity: 9
Pull Pin B
(illustration not to scale)
Quantity: 1
M10 x 68 Bolt
Quantity: 2
LIGHT BLUE BAG
M8 x 20 Bolt
Quantity: 6
M10 Nylon Nut
Quantity: 6
M10 x 125 Bolt
Quantity: 1
4” Axle
(illustration not to scale)
Quantity: 1
8.4 x 15 x 1.6
Flat Washer
Quantity: 6
M10 x 25 Bolt
Quantity: 16
Small Disc (hole size)
(illustration not to scale)
Quantity: 6
10
Large Disc (hole size)
(illustration not to scale)
Quantity: 4
AB1
STEP
1
ORANGE BAG
NOTE: Leave all hardware partially
loose, until the end of Step 6.
• Attach the press arm foot (AC5) to the
press arm floor support (AC1) using two
bolts (M10x65), two flat washers
(10.2x22x2), and two nylon nuts (M10).
• Stand up the main center upright (AB1)
and place the functional arm floor support
(AC2) up against the center holes at the
bottom of the main center upright.
Connect the two frame pieces with two
bolts (M10x60), and two flat washers
(10.2x22x2).
• Align the holes in one of the weight
stack support blocks (AK3) with the holes
on the bottom right side of the main center
upright (AB1). See diagram for orientation
of the block. Place the press arm floor
support (AC1) up against the weight stack
support block, aligning those holes. Slide
two bolts (M10x78) with flat washers
(10.2x22x2) through the holes, securing
them with two more flat washers and two
nylon nuts (M10). Repeat this process on
the remaining holes on the bottom of the
main center upright, using the leg press
floor support (AC3) and the other weight
stack support block.
AC1
Inside
AK3
AK3
AC3
AC2
AC5
11
STEP
2
• Place the center connecting support
(AC6) in between the functional arm floor
support and the leg press arm floor
support, aligning the holes. Slide two bolts
(M10x62) with flat washers (10.2x22x2)
through the holes into the functional arm
floor support. Secure bolts with two more
flat washers and two nylon nuts (M10).
Repeat on other side of connecting support.
• Attach two pillow block bearings (C33)
to the leg press foot (AC4) with four
bolts (M10x25), four lock washers
(10.2x18.4x2.5), and four flat washers
(10.2x22x2). Make sure the grease fittings
are positioned on the inside, pointing
towards the main center upright. Tighten.
• Take the leg press foot (AC4) and place
over the end of the leg press floor support
(AC3), aligning the holes. Slide two bolts
(M10x62) with flat washers (10.2x22x2)
through the holes, securing with two more
flat washers and two nylon nuts (M10).
BLUE BAG
AH2
AC1
AC6
AN2
AC4
C33
AC3
AN1
• Loosely thread four set screws (M6x8) in
the axle housing on the leg press swing
arm (AN1). Place the axle (8
of the leg press swing arm between the
pillow block bearings on the leg press
foot, making sure the pulley bracket is facing
the floor support. Slide the axle through
the holes and center it in the bearings.
Secure by tightening set screws.
• Attach the foot plate (AN2) to the leg
press swing arm (AN1) by sliding the shaft
(5.75”) through holes in foot plate and
swing arm, and securing with a flat washer
(12.2x26x2), lock washer (10.2x18.4x2.5)
and a bolt (M10x25).
• Attach the leg curl post (AH2) in
between the bracket on the press arm floor
support (AC1) using one bolt (M10x72),
two flat washers (10.2x22x2), and a
nylon nut (M10).
7
/16”) housing
12
AB1
K18
STEP
3
WEIGHT STACK
• Place weight stack bumpers (Q05) over
the holes of both weight stack support
blocks (AK3). Place the guide rods over
and through the rubber weight plate
bumpers into the weight stack support
block. Use caution when adding the
weight plates. Don’t let the guides tilt too
far forward during installation. Slide each
of the 20 weight plates over both sets of
the guide rods on top of one another.
Place the header weight plate over both
sets of guide rods on top of other weight
plates.
with the pulley bracket on the leg
press side weight stack! The header
plate without the pulley bracket will
go on press arm side.
• Slide a stopper ring (K18) on the left
guide rod of the leg press side and tighten
the set screw so the bottom edge of the
ring is nine inches from the top of the rod.
• Rest each guide rod behind the top
bracket on the main center upright (AB1).
NOTE: Place the header plate
AK3
Q05
Q05
AK3
13
AH3
AB4
STEP
4
• With angled end down and pulley
brackets facing weight stack, place the
press arm upright (AB2) over the press arm
floor support (AC1), aligning the holes in
both components. Slide two bolts
(M10x62) with flat washers (10.2x22x2)
through holes and secure each of the bolts
with another flat washer and two nylon
nuts (M10).
• Take the adjustable handle assembly
and slide onto the functional arm upright
(AH3), making sure the handle is on the
side with the numbers. You will need to
squeeze the handle to slide over the
adjustment holes in the upright. Place the
functional arm upright (AH3), numbers
facing press arm upright (AB2), over the
exposed bolt ends on the functional arm
floor support (AC2). Secure the connection
with a flat washer (10.2x22x2) and a
nylon nut (M10) over each bolt end.
PINK BAG
AB2
AC1
AC2
• With the hole for the cable on the bottom,
place the leg press upright (AB4) over the
leg press floor support (AC3). The upright
should angle upwards towards the weight
stacks. Align the holes in the upright with
the center holes in the floor support. Slide
two bolts (M10x62) with flat washers
(10.2x22x2) through the connection.
Secure each of the bolts with another flat
washer and a nylon nut (M10).
AC3
14
AG1
Press ArmLeg Press
Inside
STEP
AB5
5
GREEN BAG
• Slide a weight stack upper block (AK2)
onto the guide rods of the press arm
weight stack. See diagram for orientation.
Take the press arm overhead tube (AB3)
and place in the bracket on top of the
press arm upright (AB2). Align the holes of
the overhead tube, weight stack upper
block, and main center upright (AB1).
Slide a bolt (M10x67) with a flat washer
(10.2x22x2) through each hole and
secure the bolts with another flat washer
and a nylon nut (M10). To secure the connection between the press arm upright and
overhead tube, use two bolts (M10x62),
four flat washers (10.2x22x2), and two
nylon nuts (M10). Repeat this process on
leg press side with the leg press overhead
tube (AB5) and the other weight stack
upper block (AK2).
AB3
AB2
AK2
AH3
AB1
AK2
AE3
• Place the functional arm overhead tube
(AG1) over the main center upright (AB1)
and functional arm upright (AH3). Secure
the overhead tube to the main center
upright using four bolts (M10x25) with
four lock washers (10.2x18.4x2.5) and
four flat washers (10.2x22x2). To secure
the connection between overhead tube
and functional arm upright, use two
bolts (M10x100), two lock washers
(10.2x18.4x2.5), and two flat washers
(10.2x22x2).
• Attach the dual snap hook bar mount (AE3)
to AB5 with two bolts (M10x62), four flat
washers (10.2x22x2), and two nuts (M10).
Make sure snap hooks are on the bottom.
15
Loading...
+ 33 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.