1
TABLE OF CONTENTS
Page (s)
Description and Specifications ........................................................................................................................................1
Installation Restrictions .................................................................................................................................................2
Cautions .........................................................................................................................................................................2
Safety Inspection of a Previously Used Appliance .....................................................................................................2, 3
SS1-R Terminology ........................................................................................................................................................3
LED Status / Fault Indicators and Fault Retrieval from Memory .....................................................................................3
SS1-R With Integral UC1 Universal Control Board Features .........................................................................................4
Pre / Post-Purge & Pre-Cycle Prover Status Check Settings......................................................................................4, 5
Vent Hood Termination Clearances For U.S. Installations ..........................................................................................5, 6
Vent Hood Termination Clearances For Canadian Installations..................................................................................6, 7
Installation
Tools Required .................................................................................................................................................7
Vent Hood Installation ..................................................................................................................................7, 8
Installation of Rain Shield .................................................................................................................................8
Plenum Installation .....................................................................................................................................9, 10
Installation of Vent Pipe ............................................................................................................................10, 11
Electrical Wiring
Wiring Restrictions ..........................................................................................................................................12
Installation of Oil Solenoid Valve.....................................................................................................................12
Field Wiring Connections & Sequence of Operation...........................................................................12, 13, 14
Selection of Proper Bleed Orifice & Draft Adjustment ............................................................................................14, 15
Combustion Air .............................................................................................................................................................15
System Operation Check Out .......................................................................................................................................15
Troubleshooting Oil Odors.......................................................................................................................................15, 16
Troubleshooting Electrical Problems .................................................................................................................16, 17, 18
Maintenance ..................................................................................................................................................................18
Removal & Replacement of Motor/Wheel ......................................................................................................18
Warranty ........................................................................................................................................................................19
Mounting Templates
Template B Motor Notch ................................................................................................................................20
Template A Vent Hood Terminus....................................................................................................................21
SideShot
®
is a registered trademark of Tjernlund Products, Inc. for their Model SS1-R Vent System.
DESCRIPTION
The SS1-R is a mechanical vent system designed and listed for use with specified Rheem, Ruud, Weatherking and Heat Controller oil
fired furnaces. The SS1-R automatically vents the flue gases away from the oil furnace to the outdoors. By combining outside air
with high-tech insulation and maintaining required clearances, surrounding combustible materials remain at safe temperatures. A
factory post-purge time is set at 2 minutes and is adjustable up to 16 minutes, see “Pre / Post-purge Settings” on page 4. The
SS1-R features a safety system consisting of the integral UC1 Universal Control, a Fan Proving Switch and a High Limit temperature control. These devices monitor the SS1-R’s performance and will interrupt the main burner if a venting malfunction is detected.
APPLICATION TABLE
Verify that the total BTU/hr. input of the heating appliance(s) fall
within the proper category listed below. All BTU/hr. capacity ranges
are based on a maximum of 10 linear feet of vent pipe with no more
than 3 - 90
0
elbows. (Two 450elbows are equivalent to one 900elbow)
SPECIFICATIONS
Motor: 115/1/60, 3300 RPM, 212 watts, 2.28 FLA
Fan Proving Switch: Non-adjustable set point of -.04" W.C.
High Limit: Manual reset, N/C contacts, open at 135oF +
10oF.
UC1 Universal Control: See UC1 Universal Control Board Features on page 4.
Pre-Purge: Options (0, 5, 20, 35 seconds); Post-Purge: Factory set at 2 minutes, Options (0, 30 seconds or 1, 2, 4, 8, 16 minutes).
See page 4 for Pre / Post-purge options.
Oil Solenoid Valve: ON - Off control of oil flow to burner; 3-8 second valve opening delay; 120 VAC, .115 Amps, 13.8 VA