VENDOR DOC. NO.
REVISE AND RESUBM IT
TO BE ISSUED AS FI NAL PROVIDED
COMMENTS ARE INCORPORATED
NO COMMENT – FINAL ISSUE
1
2
3
FOR INFORMATION ONLY
4
Emanuele Rizzo - May 11, 2022
VRV-VDB-CY19P01-0020
INDEX OF VENDOR DATA BOOK
04.05.2022 Revised as per client comments
03
25.09.2020 Revised as per client comments
02
04.09.2020 Revised as per client comments
01
10.07.2020 First issue
00
REV. PREPARED CHECKED APPROVED
DATE DESCRIPTION
FT
CS
CS
CS
F.Trenta
C. Scanga
C. Scanga
C. Scanga
S.Colombo
C. Borioli
C. Borioli
C. Borioli
INDEX OF VENDOR DATA BOOK
VENDOR DOCUMENT DESCRIPTION
Erection, Operating and Maintenance Instruction Manual
Doc. for package transport service RFQ
Software freezing package
Software freezing package
Procedures for siste assembly, levelling and welding
Welding specifications for field welds
List of checks and tests to be performed on site
PRECOMMISSIONING, COMMISSIONING AND START-UP PROCEDURE
(Test, flushing, cleaningm drying etc. with relevant acceptance criteria)
Detailed schedule of the erection including hypothesis taken into account
Procedures for erection and installation of the equipment
List of connection points detailing location and dimensions
Details of site assembly and field welds
List of special tools for siste erection and assembly
Chemicals, Catalyst Utilities consumtion
RECOMMENDATION FOR TRANSPORTATION, HANDLING AND STORAGE
List of components to be erected/installed on siste
List of Alarms and Set Points
Software freezing package
Program List (logic and ladder diagram, etc.)
Normal Operating procedure
Sequence flow chart (valve positioning, controls, etc.)
Description of control system
EMERGENCY SHUT-DOWN PROCEDURE
NORMAL SHUT-DOWN PROCEDURE
SPECIAL OPERATION (chemical cleanings, catalyst regeneration, etc.)
Operating and maintenance manual
Operating and maintenance manual
Trouble shooting check list and diagrams
Operating and maintenance manual
Lubricant table and equivalence
Spare parts for start-up and 2 years operation
Spare parts for 2 years operation
SPARE PARTS (ref. To 2544-00-PP-908)
Consumable for erection, commissioning and start-up
Spare parts for comissioning
Sectional drawings with part list numbers
Assembly construction drawings
Pressure vessels construction drawings
5.1
VRV-IM-CY19P01-0001_00X
Operating and maintenance manual
1 GENERAL
1.1 Drawing list NOT APPLICABLE -
1.2 P&ID VRV-PID-CY19P01-0012 P&ID
1.3 Process Flow Diagram with Material Balance VRV-PFD-CY19P01-0011 PFD
1.4 General arrangement drawing VRV-GA-CY19P01-0001 General arrangemet drawings
1.5 Plot plan VRV-LY-CY19P01-0002 Foundation layout and plot plan
2 MAIN EQUIPMENT
2.1 Data sheet VRV-ME-CY19P01-0007 Equipment filled-in data sheet
2.2 Assembly Construction drawings NOT APPLICABLE -
2.3 Nameplate drawing VRV-me-cy19p01-0006 Nameplate drawings
3 PRESSURE VESSELS
3.1 Data sheet NOT APPLICABLE -
Document no. VR-VDB-CY19P01-0020
RD Code: A0403
Page 2