TO BE ISSUED AS FINAL PROVIDED COMMENTS ARE
INCORPORATED.
NO COMMENT – FINAL ISSUE.
PERMISSION TO PROCEED DOES NOT CONSTITUTE
ACCEPTANCE OR APPROVAL OF DESIGN DETAILS,
CALCULATIONS, ANALYSIS, TEST METHODS OR
MATERIALS DEVELOPED OR SELECTED BY SUPPLIER FROM
FULL COMPLIANCE WITH CONTRACTUAL
OBLIGATIONS.
SUPPLIER'S OWN DOCUMENT No
SUPPLIER APPROVAL
SIGNATURE
index for vendor data book
4
02/07/2020
VDB-19-3090-004
1
2
20/07/2020
04/11/2020
HVGO FILTER
17-FL-52 A/B
A0403-02
2

VENDOR DATA-BOOK (VDB) - INDEX
PROJECT NAME: MIDOR REFINARY EXPANSION
ERECTION, OPERATING AND MAINTENANCE INSTRUCTION MANUAL
Filtering Element / Basket Data
Sheet Attached
Chemicals, Catalyst Utilities Consumption
RECCOMENDATION FOR TRANSPORTATION, HANDLING AND
STORAGE
List of components to be erected/installed on site
Detailed schedule of the erection including hypothesis taken into
account
Procedures for erection and installation of the equipment
List of connection points detailing location and dimensions
Details of site assembly and field welds
List of special tools for site erection and assembly
Procedures for site assembly, leveling and welding
Welding specifications for field welds
List of checks and tests to be performed on site with SAT (Site
Acceptance Test) & Site Quality Control Plan
Pre-commissioning, Commissioning and Start-Up Procedure
Normal Operating Procedure
Sequence Flow Chart (valve positioning, controls, etc.)
Description of Control System (Functional design Specification)
List of Alarms and Set Points
Program List (logic and ladder diagram, AND/OR, etc.)
Normal Shutdown Procedure
Emergency Shutdown Procedure
Special operation (chemical cleanings, catalyst regeneration, etc…)

VENDOR DATA-BOOK (VDB) - INDEX
PROJECT NAME: MIDOR REFINARY EXPANSION
A5010 / A5015 / A5016 / A5001
IOM-19-3090-002
Lubricant table and equivalence
Troubleshooting checks lists and diagrams
Consumable for erection, commissioning and start-up
Spare parts for start-up and 2 years operation
Sectional drawings with part list numbers
Piping & Instrument Diagrams and Process Flow Diagrams with
Material Balance
Assembly Construction Drawings
A2006/A2001/A1103/
A1112/A1109
AF-C-E034-001
Machinery and Other Equipment
(Pumps, fans, compressors, etc.)
Data Sheet and/or Expected Performance Curves
Sectional Drawings (with part list)
STC-19-3090-002

VENDOR DATA-BOOK (VDB) - INDEX
PROJECT NAME: MIDOR REFINARY EXPANSION
Accessories Drawings of Brochures (Mechanical seals, pulsation
dampers,lubricant unit, flushing system, gear reducer, couplings,
etc.)
Data sheet and/or Performances Curves
Assembly/Sectional Drawings
Piping and Piping Supports Layout
Valves and Accessories Drawings
Instrument and Local Control Panel
Instrument Data Sheet and Brochure
Control Panel Drawing (with internal arrangement and wiring)
Terminal Strip Connection
Instrument/Electrical Equipment Layout and Cable Routing
Primary Measuring Valves Calculation (PVC, PSV)
Power Distribution Panels Drawings (with internal arrangement and
wiring)