— 6 —
DCR-TRV738E/TRV740/TRV740E/TRV840
3. Subjects ··········································································· 5-7
1-2. INITIALIZATION OF 8, A, B, C, D, E, F, 1B, 1C, 1E, 1F
PAGE DATA ···································································· 5-8
1-2-1.INITIALIZATION OF A, D PAGE DATA ······················5-9
1. Initializing the A, D Page Data ········································ 5-9
2. Modification of A, D Page Data ······································5-9
3. A Page Table····································································5-9
4. D Page Table··································································5-10
1-2-2.INITIALIZATION OF B, 1B PAGE DATA ·················· 5-11
1. Initializing the B, 1B Page Data ····································5-11
2. Modification of B, 1B Page Data ··································5-11
3. Loader writing inhibit mode setting ······························5-11
4. B Page Table ·································································· 5-11
5. 1B Page Table ································································ 5-11
1-2-3.INITIALIZATION OF 8, C, 1C PAGE DATA ·············· 5-12
1. Initializing the 8, C, 1C Page Data ································5-12
2. Modification of 8, C, 1C Page Data ······························5-12
3. 8 Page Table···································································5-13
4. C Page Table ·································································· 5-13
5. 1C Page Table ································································ 5-15
1-2-4.INITIALIZATION OF E, F, 1E, 1F PAGE DATA ········ 5-16
1. Initializing the E, F, 1E, 1F Page Data ·························· 5-16
2. Modification of E, F, 1E, 1F Page Data·························5-16
3. E Page Table ··································································5-17
4. F Page Table ·································································· 5-18
5. 1E Page Table ································································5-19
6. 1F Page Table ································································ 5-19
1-3. CAMERA SYSTEM ADJUSTMENTS ························5-20
1. HALL Adjustment ························································· 5-20
2. Flange Back Adjustment (Using Minipattern Box)·······5-21
3. Flange Back Adjustment (Using Flange Back Adjustment
Chart and Subject More Than 500m Away) ·················· 5-22
3-1. Flange Back Adjustment (1) ·········································· 5-22
3-2. Flange Back Adjustment (2) ·········································· 5-22
4. Flange Back Check························································5-23
5. Mechanical Shutter Adjustment ····································5-23
6. Black Defective CCD Adjustment·································5-24
7. Picture Frame Setting ····················································5-24
8. Color Reproduction Adjustment····································5-25
9. Auto White Balance & LV Standard Data Input ···········5-26
10. Auto White Balance Adjustment ···································5-27
11. White Balance Check ····················································5-28
12. Steady Shot Check·························································5-29
1-4. ELECTRONIC VIEWFINDER SYSTEM
ADJUSTMENT·····························································5-30
1. VCO Adjustment (VC-278 board) ································5-30
2. RGB AMP Adjustment (VC-278 board) ·······················5-31
3. Contrast Adjustment (VC-278 board) ···························5-31
1-5. LCD SYSTEM ADJUSTMENT ···································5-32
1-5-1.LCD Type Check ···························································5-32
1-5-2.LCD SYSTEM ADJUSTMENT (PD-156 board) ·········5-33
1. VCO Adjustment (PD-156 board)·································5-33
2. RGB AMP Adjustment (PD-156 board)························5-33
3. Contrast Adjustment (PD-156 board)····························5-34
4. COM AMP Adjustment (PD-156 board) ·······················5-34
5. V-COM Adjustment (PD-156 board) ····························5-35
6. White Balance Adjustment (PD-156 board)··················5-35
1-5-3.LCD SYSTEM ADJUSTMENT (PD-160 board) ·········5-36
1. VCO Adjustment (PD-160 board)·································5-36
2. PSIG Gray Adjustment (PD-160 board)························5-36
3. RGB AMP Adjustment (PD-160 board)························5-37
4. Black Limit Adjustment (PD-160 board) ······················5-37
5. Contrast Adjustment (PD-160 board)····························5-38
6. Center Level Adjustment (PD-160 board)·····················5-38
7. V-COM Adjustment (PD-160 board) ····························5-39
8. White Balance Adjustment (PD-160 board)··················5-39
5-2. MECHANISM SECTION ADJUSTMENT··················5-40
2-1. Hi8/STANDARD 8 MODE···········································5-40
2-1-1.OPERATING WITHOUT CASSETTE ························5-40
2-1-2.TAPE PATH ADJUSTMENT········································5-40
1. Preparations for Adjustment··········································5-40
2-2. DIGITAL8 MODE ························································ 5-41
2-2-1.HOW TO ENTER RECORD MODE WITHOUT
CASSETTE ···································································5-41
2-2-2.HOW TO ENTER PLAYBACK MODE WITHOUT
CASSETTE ···································································5-41
2-2-3.OVERALL TAPE PATH CHECK·································5-41
1. Recording of the tape path check signal························5-41
2. Tape path check ·····························································5-41
5-3. VIDEO SECTION ADJUSTMENT ······························5-42
3-1. PREPARATIONS BEFORE ADJUSTMENTS ············5-42
3-1-1.Equipment to Required··················································5-42
3-1-2.Precautions on Adjusting ···············································5-43
3-1-3.Adjusting Connectors ····················································5-44
3-1-4.Connecting the Equipment ············································ 5-44
3-1-5.Alignment Tape ·····························································5-45
3-1-6.Input/output Level and Impedance································5-46
3-2. SYSTEM CONTROL SYSTEM ADJUSTMENT········5-47
1. Initialization of 8, A, B, C, D, E, F, 1B, 1C, 1E, 1F Page
Data ···············································································5-47
2. Serial No. Input ·····························································5-47
2-1. Company ID Input·························································5-47
2-2. Serial No. Input ·····························································5-47
3-3. SERVO AND RF SYSTEM ADJUSTMENT ···············5-49
1. REEL FG Adjustment (VC-278 board)·························5-49
2. PLL f0 & LPF f0 Adjustment (VC-278 board) ··············5-49
3. Switching Position Adjustment (VC-278 board)···········5-50
4. AGC Center Level and APC & AEQ Adjustment ·········5-50
4-1. Preparations before adjustments····································5-50
4-2. AGC Center Level Adjustment (VC-278 board)···········5-50
4-3. APC & AEQ Adjustment (VC-278 board) ···················· 5-51
4-4. Processing after Completing Adjustments ····················5-51
5. PLL f
0 & LPF f0 Fine Adjustment (VC-278 board) ······5-52
6. Hi8/Standard8 Switching Position Adjustment
(VC-278 board) ·····························································5-52
7. CAP FG Duty Adjustment (VC-278 board)··················5-53
3-4. VIDEO SYSTEM ADJUSTMENTS·····························5-54
1. 54MHz/66MHz Origin Oscillation Adjustment
(VC-278 board) ·····························································5-54
2. S VIDEO OUT Y Level Adjustment (VC-278 board)···5-54
3. S VIDEO OUT Chroma Level Adjustment
(VC-278 board) ·····························································5-55
4. VIDEO OUT Y, Chroma Level Check (VC-278 board) 5-55
5. Hi8/Standard8 Y/C Output Level Setting
(VC-278 board) ·····························································5-56
6.
Hi8/standard 8mm AFC f0 Adjustment (VC-278 board) ·
5-56
3-5. AUDIO SYSTEM ADJUSTMENTS ····························5-57
1.
Hi8/Standard8 AFM BPF f0 Adjustment (VC-278 board)·
5-57
2. Hi8/Standard8 AFM 1.5 MHz Deviation Adjustment
(VC-278 board) ·····························································5-58
3. Hi8/Standard8 AFM 1.7 MHz Deviation Adjustment
(VC-278 board) ·····························································5-58
4. Digital8 Playback Level Check ·····································5-58
5. Overall Level Characteristics Check ·····························5-58
6. Overall Distortion Check···············································5-58
7. Overall Noise Level Check············································5-59
8. Overall Separation Check··············································5-59
5-4. SERVICE MODE ·························································· 5-60
4-1. ADJUSTMENT REMOTE COMMANDER················5-60
1. Using the Adjustment Remote Commander··················5-60
2. Precautions Upon Using the Adjustment Remote
Commander ···································································5-60
4-2. DATA PROCESS···························································5-61
4-3. SERVICE MODE ·························································· 5-62