
Commercial Chase Bracket
Installation Instructions
Bracket can be fastened to vent or stack pipe with stainless
steel band. Although not necessary, additional band can be
used in the slot provided to secure bracket to ver tical pipe.
Bracket can also be secured to any at surface with approved
hardware using two mounting holes provided.
INS TAL LAT ION
Position horizontal piping in the bracket to cradle the water
header then solder copper pipe to the bracket. Heat the pipe,
not the bracket. Maximum load is 275 lbs.
Optional installation allows installer to secure water header by
using a stainless band or cable tie threaded through horizontal
slot then secure band or tie around water header and through
the front channel of the bracket.
521-723 Chase Br acket wi th s.s . band
521-723B Chase Br acket
Patent # D 55 8,567
Made in USA
www.s iouxchief.com 1-800 -821-3944 ©2011 Sioux C hief
#IS- 521-723 Commercial Chas e Bracket Instru ction S heet Rev 2 04-11