3 of 11
INSTALLATION INSTRUCTION
1.1 Minimum clearance around the unit
From combustible construction: Right side, Left side and Back: 6” (152mm)
From non-combustible construction: Right side, Left side and Back: 3” (76mm)
1.2 Location
Due to the heat a countertop oven may produce, it must be placed on a non-combustible surface. Do
not store combustible materials on top of the oven.
1.3 Electrical connections
Make sure to plug the unit into the right electrical outlet that corresponds with that specified on the
rating plate located in the rear of the oven.
1.4 Requirements for installation
For shipping purposes the optional 4-6” (100-152mm) legs are not mounted. To mount the legs,
follow steps 1 - 7.
1. Remove the outer shipping carton and paper.
Place the oven on the floor or other flat
surface.
2. Remove the legs, baking decks and any other
materials from inside the unit.
3. With sufficient help, tilt the unit back far
enough to mount the two front legs and
tighten with an adjustable wrench.
4. After the front legs are tight, lift rear of unit
approximately 5” (125mm) off the surface
and brace the unit using wood or some other
solid material. Now mount the two rear legs
and tighten.
5. Using the proper lifting equipment, move the
unit to its final location.
6. Adjust the bottom portion of the legs to make the unit level.
1.5 Initial start up
After the electrical connections have been made, the oven will need approximately 2 to 3 hours to
season the oven