Siemens SIDRIVE IQ User Manual

SIDRIVE IQ
Drive System Analyzer
Product Sheet
and Specific Terms
With the SIDRIVE IQ Drive System Analyzer, you can conveniently access the relevant data from your motors and converters nearly anytime and anywhere. The cloud­based solutions for data analysis process the data collected, which then allows you to monitor and analyze the status and performance of your drive systems and derive a variety of optimization measures.
Prerequisites
Hardware
Web browser
An HTML5 capable internet browser is required. Latest versions of Google Chrome, Mozilla Firefox or Microsoft Edge are supported. Google Chrome is recommended. The preferred screen resolution is 1024x768 or higher. Mobile devices are supported using an HTML5 capable web browser.
Description
General This application provides for up to five users the following views of data obtained
from your Assets:
· General overview: Statistics regarding the state of health, operating and
efficiency
· Chart overview: Graphical representation and curves of individual data points and reference values (e. g. time series)
· Log view: Overview of historical events (e. g. status, alarms, faults)
· Info view: Information about the Asset itself (e. g. type plate) and Siemens
contact person
The content and scope of views may vary depending on which Asset type is
connected.
v1.0 (November 2020) Unrestricted 1 of 4
Application permissions
This application is operated in a data center in Germany (Frankfurt) and processes the following data:
· Time series data which includes the variables received from an Asset within defined continuous time cycles.
· Asset configuration data which describes the Asset (e.g. Asset name, location).
This application performs the following activities which modify or amend Your Content in your SIDRIVE IQ Account on your behalf:
· Read and write access on your time series data: This application reads uploaded data from your data repository to evaluate and process certain information presented in different views within this application. This application writes time series data into your time series data repository to keep the processed values available on a long-term basis.
· Read access on your Asset configuration data: Read access on your Asset configuration data is required in order to use all functionalities of this application.
Pricing Model
Payment Terms
Subscription Term / Termination Minimum Subscription Term for this application is 12 months. Following expiration
Adaptation of Fees
Trial Periode
The subscription fee for SIDRIVE IQ Drive System Analyzer is charged monthly in advance, starting with the onboarding of the Asset.
of the preceding Subscription Term, the subscription automatically renews with a Subscription Term of one year until terminated by you or us for convenience at least three months in advance. The termination shall become effective at the end of the month. We inform you about a termination by sending a message to the email address provided to us. Your termination has to be addressed to sidrive-iq.industry@siemens.com.
We may change or add new fees (collectively referred to as “Fee Change”) due to and to the extent required to reflect: (i) changes in the quality or functionalities of the Service; (ii) material changes in market conditions; (iii) general increases in wages or other employment costs; and/or (iv) changes in procurement costs due to price changes made by our suppliers, in each case to the extent that the changes affect our provision of the agreed Service. We will notify you of any Fee Change at least 60 days in advance of the effective date of the Fee Change.
When ordering the corresponding MLFB, the customer will receive the services of SIDRIVE IQ Drive System Analyzer free of charge for the first three (3) months. During this test phase, the services will be provided in the actual state, excluding any warranty and liability for service quality. The customer may terminate the contract at any time during the trial period to the end of the trial period. The notice of termination must reach Siemens no later than 30 days before the end of the test phase, otherwise the test phase will automatically be transferred into a fee-based contract with a term of one year.
Specific Terms
Your Obligations
v1.0 (November 2020) Unrestricted 2 of 4
During online monitoring, you shall ensure that nothing directly or indirectly impedes the state of the installation or the running of this application (e.g. removal of a connection cable, switching off any instruments or switching off the Asset itself).
Loading...
+ 2 hidden pages