Installation and Power Limited Wiring Instructions
Model MXL/MXLV Rack Mount Kits (RKs)
for ACM-RK, MKB-RK, MMB-RK, MOM-RK,
MPS-RK, SYS-RK, TSP-RK, VSM-RK, and Cables-RK
INTRODUCTION
The Model RK series of panels and cables provides standard 19" rack mounting for MXL
(without Voice) and MXLV (with Voice) modules. Table 1 lists the individual rack mount kits along with
the specific modules that mount onto them.
TABLE 1
MXL/MXLV RACK MOUNT KITS
RACK
MOUNT KIT
ACM-RK
MKB-RK
MMB-RK
MOM-RK
MPS-RK
SYS-RK
TSP-RK
VSM-RK
FILLER
PLATE*
CABLES-RK
(Required)
MOUNTS
MODULE(S)
ACM-1, MMM-1, PIM-1,
TBM-1, and TMM-1
MKB-3, PIM-1Front12 1/4" X 19"MXL/MXLV
MMB-1 or PSR-1Rear12 1/4" X 19"MXL/MXLV
Up to 3 MOM-4s, MOM-2s,
OMM-1s, and/or OMM-2s
Up to 2 MPS-6/-Ws and/or
MPS-12/-Ws
EL-410DRear8 3/8" X 19"MXLV
TSP-40Front12 1/4" X 19"MXL/MXLV
Up to 6 VSM-1s, VLM-1s,
VFM-1s, and/or VSB-1s
NoneFrontAs required x 19"MXL/MXLV
4 special cables for
connecting modules
PLACEMENT
ON RACK
Front17 1/2" X 19"MXLV
Rear17 1/2" X 19"MXL/MXLV
Rear8 3/4" X 19"MXL/MXLV
Front7" X 19"MXLV
PANEL HEIGHT
X WIDTH
MXL/MXLV
TYPE OF
SYSTEM
* Filler plates can be purchased from any rack manufacturer.
NOTE: Each MXL/MXLV module that is mounted must be ordered separately.
Siemens Building Technologies, Inc.
8 Fernwood Road
Florham Park, New Jersey 07932
The MXL/MXLV rack mounting panels mount on a
standard 19" wide x 18" deep rack (See Figure 1).
Table 1 lists the recommended locations (front or
rear) for the rack mounted modules and the panel
heights of the rack mount kits.
The following rack is available for typical installations (Refer to Figure 1):
26"
MODEL
NO.
PART
NO.
DESCRIPTION
MXL-RK1500-6934706 Foot Vertical
Rack
The rack is supplied with:
• side, back, and top panels
• front door with clear lens
• battery tray
• mounting hardware
The front door door has a standard
lock with key.
MODULE ASSEMBLY
Mount each module, except the MKB-3, the
TSP-40, and the EL-410D to its designated rack
mount kit (See Table 1) using the hardware and
installation instructions provided with the module.
See Table 2 for a list of installation instructions.
Refer to Figure 2 when assembling the ACM-RK
to determine correct module placement and
cabling connections.
MKB-3 Installation
Remove all system power before
installation, first battery and then AC.
(To power up, connect the AC first
and then the battery.)
Setting the Network Address
(See Figure 3)
1. Before installing the MKB-3 panel, set its
network address on S1, the switch on the
ANN-1 board located on the back of the
MKB-3. Use dipswitches SW1 and SW2 on
switch S1 to set the network address of the
MKB-3. Refer to Table 3 for switch settings.
2. The MKB-3 module address is always set
within network addresses 248 through 251.
3. One supervised MKB-3 must be installed
at network address 251. Other supervised
MKBs may be at the other addresses.
NOTE: Switches S1-SW3 and S1-SW4 are for
future use. Switch S1-SW5 is used to
select supervision.
EXISTING
MMM-1 CABLE
Figure 2
Rear View of the ACM-RK
MMM-1
ACM-RK
NOTE: When you select non-supervision for an
annunciator, there must also be one andonly one supervised annunciator at the
same address. The supervisory mode is
independent of the network address.
TABLE 3
SWITCH SETTINGS ON THE ANN-1
Setting Supervision
Use switch S1-SW5 on the ANN-1 to select or
deselect supervision. If your ANN-1 has a switch
with position 1 indicated on the left-hand side,
ignore the printing on the switch. SW1 on S1 is at
the extreme right-hand side of S1, regardless of
any other marking.
To set for supervision
S1-SW5 = Closed (ON)
To set for non-supervision
S1-SW5 = Open (OFF)
ADDRESS SETTINGS FOR:
SWITCH
S1-SW1
S1-SW2
S1-SW3
S1-SW4
S1-SW5
248249250251
Open-
OFF
Open-
OFF
Closed-ONOpen-
OFF
Open-
Closed-ONClosed-
OFF
Closed-
On
ON
Closed-ONClosed-ONClosed-ONClosed-
ON
Closed-ONClosed-ONClosed-ONClosed-
ON
See Setting Supervision
3
Page 4
2. After installing the printer to the plate, mount
the plate to the rack using hardware supplied
with the rack. Refer to the SYSTEMASSEMBLY section below and Figures 6
(with Voice) and 7 (without Voice), for the
recommended location on the rack.
3. Mount the dress plate onto the rack with the
clear lens centered over the printer paper.
Fasten in place using hardware supplied with
the rack.
SYS-RK Installation
Figure 3
Setting S1 on the ANN-1 Board
To assemble the MBK-RK:
1. Remove the four screws from the four
standoffs on the rear side of the MKB-RK
plate.
2. Position the MKB-3 panel over the four
standoffs on the rear side of the MBK-RK
plate, being sure that the MKB-3 panel fits
into the cutout on the plate.
3. Replace the four screws on the standoffs and
tighten them securely.
4. Mount the MKB-RK to its recommended
location on the rack. Refer to Table 1 and
Figures 6 and 7 to determine the correct
location for your system.
The SYS-RK has two components (See Figure 5):
1. An 83/8 X 19" plate with studs.
2. A U-shaped plate with studs.
To assemble the SYS-RK:
1. Mount the 8
3
/8 X 19" plate on the rear of the
rack. Refer to the SYSTEM ASSEMBLY
section and Figure 6 for the recommended
location on the rack.
2. Place the six holes in the U-shaped plate over
the six studs in the 19" rack plate. Secure the
U-shaped plate in place using the six 8-32
nuts provided.
3. Install the EL-410D over the four studs on the
U-shaped plate using the four 8-32 nuts
provided.
TSP-40 Installation
The TSP-RK has two components:
1. U-shaped plate with studs (See Figure 4).
2. A dress plate with a clear lens.
To assemble the TSP-RK:
1. Mount the TSP-40 printer to the studs using the
hardware and installation instructions
supplied with the printer. In this application,
use the instructions for mounting the TSP-40
in an MBR-1 backbox.
STUDS
Figure 4
TSP-RK U-shaped Plate with Studs
4
Page 5
Figure 5
SYS-RK Components
SYSTEM ASSEMBLY
NOTE
Before installing the modules onto the rack,
access to field wiring connections must be
considered.
Refer to Figures 6 (with Voice) and 7 (without
Voice) for the recommended placement of
modules on the rack.
Observe the following conditions when mounting
the modules onto the rack:
1. Modules having cable connections must be
mounted close enough to each other so the
cables will connect. In order to use the fixed
length cables shipped with MXL/MXLV
modules, place the modules on the rack in
the same way that they are mounted in the
MME-3 enclosure. Refer to the MXL/MXVManual, P/N 315-092036, for mounting
positions and cable connections.
2. Rear mounted modules must face the inside
of the rack with the smooth side of the plate
facing the back of the rack.
3. The ACM-RK must be mounted below the
MKB-RK.
4. The MOM-RK must be mounted below the
MMB-RK.
5. The MPS-RK must be mounted below the
MOM-RK.
6. The MMB-RK must be mounted directly
behind the ACM-RK.
7. The TSP-RK must be located within 24
inches of the MMB-RK.
8. The VSM-RK must be mounted directly
below the ACM-RK.
Using the CABLES-RK Kit
The CABLES-RK kit (P/N 500-893044) has five
cables for connecting modules. Four of the five
cables replace cables that are shipped with
modules. The remaining cable extends the
length of the MMM-1 cable by plugging into it.
Refer to Figures 2, 6, or 7, and Table 4 for specific
cable use.
WIRING
All wiring must comply with national and
local codes.
In compliance with UL-864, effective May 1,
1995, all power limited fire protective signaling
conductors must be separated a minimum of 1/4
inch from all of the following items located within
a control panel:
• electric light
• power
• Class 1 or non-power limited fire protective
signaling conductors
5
Page 6
4ELBAT
TIKKR-SELBAC
)440398-005N/P(
ELBAC
EPYT
nobbiRrotcudnoC41VLXMsecalpeR1P,1-MCA
nobbiRrotcudnoC51VLXMsecalpeR4P,1-MCA
nobbiRrotcudnoC51ro"04
yrettaBeriW2VLXM/LXMsecalpeR2P,2/1-BMM
elbaCeriW9VLXMsdnetxE1-MMM
FOEPYT
METSYS
VLXMsecalpeR
LXMsecalpeR
SECALPER
SDNETXERO
STCENNOC
SELUDOM
ot
3P,1-MMT
ot
P,1-NNA
1
8P,2-BMM
ot
P,1-MCA5
8P,2-BMM
ot
P,1-NNA
1
ot
yrettaB
ot
7P,1-MCA
ELBAC
HTGNEL
"42
"42
"06
"6
To meet these requirements, two wire ducts are
mounted along the sides of the rack assembly, as
shown in Figure 8. Remove the wire duct cover,
route all non-power limited wiring through the
ducts, then snap the cover back in place.
Refer to the Installation and Power Limited WiringInstructions for the MME-3 Backbox, P/N 315-
094883, for further information on power and
non-power limited wiring.
NOTE: If power-limited wiring is not used within a
rack mount system, then the following
guidelines do not apply. In that case, be
sure to follow standard wiring practices.
6
Page 7
WIRING ENTERING THE RACK
ASSEMBLY
Non-Power Limited Wiring
Wiring to the following MXL/MXLV module terminations shown in Table 5 is considered nonpower limited. The wiring must enter and exit the
rack assembly through the bottom of the rack and
route in either of the two ducts. Wiring between
the ducts and the module terminations must be in
the shortest route and must not overlap any other
wiring.
TABLE 5
ModuleTermination
ASC-1/-2‡
(Power from EL-410D)
Batteries
CRM-4*
CSM-4†
MMB-1/2 (P3)
MPS-6/-W or
MPS-12/-W
ZC Zone Cards‡
(Power from EL-410D)
OMM-1
MMB-1/2 or
PSR-1
MOM-4
MOM-4
MOM-4 (P5)
1, 2, 3
OMM-1
TABLE 6
Module Termination
ALD-2
ALD-2I
CMI-300
CSM-4*
CZM-4
MMB-1/2
NET-4/7
NIM-1R
PIM-1
PSR-1
OCC-1
REP-1
TBM-2
XLD-1
ZAC-30
ZCT-8B
* When the CSM-4 is used as Notification Application
When the CSM-4 is used as Municipal Tie or Releasing
Service.
Audio or strobe power wiring to any ZC Zone Card
module and ASC-1/-2 first must be terminated at a
PLC-4 plug-in module installed in an OMM-1 and then at
the zone card. The PLC-4 must contain at least one of
the following plug-on boards: a PL864-25A or
PL864-70A for audio circuits, or a PL-864-25S for strobe
circuits. Refer to the PLC-4 Installation Instructions, P/N
315-093312.
WIRING ENTERING THE RACK
Power Limited Wiring
Wiring to the following MXL module terminations
shown in Table 6 is considered power limited
and must enter the rack assembly through the
bottom of the rack.
† Listed Class 2 or Power Limited Source.
SYSTEM WIRING
For systems without the voice option (MXL):
Connect the modules as shown in the individual
installation instructions (Refer to Table 2) and the
MXL/MXLV Manual, P/N 315-092036.
For systems with the voice option (MXLV):
Connect the modules as shown in the individual
installation instructions (Refer to Table 2) and the
MXL/MXLV Manual, P/N 315-092036.
For all systems:
After connecting the modules, complete the field
wiring to each module following the individual
installation instructions (Refer to Table 2) and
the MXL/MXLV Manual, P/N 315-092036.
7
Page 8
8 3/8"
12 1/4"
12"
17 1/2"
9"
17 1/2"
7"
7"
12 1/4"
70"
Figure 6
MXLV (with Voice )
Mounted on 19" Rack
8
Page 9
70"
12"
12 1/4"
12 1/4"
17 1/2"
9"
Figure 7
MXL (without Voice)
Mounted on 19" Rack
9
Page 10
Figure 8
Installing the Wiring Duct
10
Page 11
11
Page 12
Siemens Building Technologies, Inc.
8 Fernwood Road
Florham Park, New Jersey 07932