20090810 街頭籃球(尚瑩 SEGA 版)(CXX_ACXX0V)英文版
Table of Contents
Special note..................................................................................................................... 3
Maintenance and Inspection ........................................................................................... 3
I.Inspection...................................................................................................................... 3
1.Parts list .................................................................................................................. 4
2.Half-Assembly type parts list................................................................................... 5
II.Machine view/size and power rating............................................................................. 6
III.Component description ............................................................................................... 6
IV.Assembly and disassembly ......................................................................................... 7
1. Assembly and disassembly for Assembly type....................................................... 7
2. Assembly and disassembly for Half-Assembly type ............................................. 19
3.【SET-UP Position & maintenance】 ................................................................... 28
V.Adjustment and Inspection......................................................................................... 28
1.Link adjustment..................................................................................................... 29
【Cable link SET-UP】............................................................................................ 29
【Link main board adjustment】.............................................................................. 30
2.Adjustment............................................................................................................ 31
【SET-UP 1】SET-UP the coin entry price for each game ................................ 31
【SET-UP 2】Additional tickets ......................................................................... 32
【SET-UP 3】Multiple of tickets......................................................................... 32
【SET-UP 4】Game Time SET-UP ................................................................... 33
【SET-UP 5】Basket motor AUTO test ............................................................. 34
【SET-UP 6】Ball holder motor AUTO test ....................................................... 34
【SET-UP 7】Reset the top score 250 or keep the record ................................ 34
【SET-UP 8】SET-UP DEMO music(ON or OFF) ........................................ 34
3.LED Monitor inspection......................................................................................... 35
- 2 -
4.Bookkeep.............................................................................................................. 35
5.Error code ............................................................................................................. 36
VI.How to play ............................................................................................................... 37
1.There are total 4 Stages ....................................................................................... 37
2.2 play types available............................................................................................ 38
VII.Screw and Nut list .................................................................................................... 38
VII.Expended view......................................................................................................... 40
Special note
We want to thank you for choosing our Street basketball machine,
and hope you read these instructions first to insure the security
of the user before this product is used.
This Manual contains the characteristics, special notes, and a
Simple breakdown of the product.
Maintenance and Inspection
■ Keep the machine clean by using mild types of cleaners.
■ Clean the machine regularly to maintain its appearance.
■ The appliance must not be cleaned by a water jet.
■ Treat acrylic with care by using Windex
Machine position regulation
The power must be turned off before any movement.
The brake must be released, before the machine is moved.
Do not put the machine under the direct sunlight, it will damage the inside parts.
I.Inspection
Before product use, please confirm the product content first, if anything is
missing, please contact us right away.
- 3 -
NO Items Specification Total quantity
1 Chassis items Packing 1 unit
2 Street basketball No.5 Basketball 10 unit
3 Key Maintenance door 1 pc
4 key Cash box 1 pc
5 AC cable line 1 unit
6 Operation manual A4 1 set
1.Parts list
1B Basket kits
2C 2 Front net
stander bridge(short)
4D Base holder BB
4B Base holder FB
2A Basket board
3A Front right net
stander kit
4C Base holder FF
2BR Back right net
stander kit
3B Front left net stander
kit
5A Wooden base
A type
2BL Back left net
stander kit
4A Base holder BF
5B Ball holder kit
- 4 -
5C Ball guide kits 6A Ball net holder kit
6B Main part
6C Block wooden
board for motor
Basketball
Top cover(optional)
2.Half-Assembly type parts list
Main frame
Metal Shelf (optional)
4B Base holder FB
Lower Side Net
(Frame Included)×4
(optional)
Lower Side Net
(Frame Included)×4 (optional)
4C Base holder FF
Top cover(optional)
5B Ball holder kit
- 5 -
5C Ball guide kits
6A Ball net holder kit
6B Main part
6C Block wooden board
for motor
Basketball
II.Machine view/size and power rating
Machine Dimensions:W1030×D2500×Top cover H2643mm
Weight:260 kg / 558.4 lbs (Accessories not Included )
(Top cover 6.6kg、Metal Shelf 3.4kg、Lower Side Net 4.2kg×4)
Voltage:AC110V~120V/AC220V~240V(50/60Hz) Use Electrical
plug display as a glide Located behind the machine.
Metal Shelf (optional)
Position direction
Back
Left
Right
Power Consumption:200W
Fuse:2A(AC220V~240V)/ 5A(AC110V~120V)
Token size:φ22mm~27mm
III.Component description
【Front】 【Base】 【Top】
- 6 -
Front
Basket board
Basket kit
Metal Shelf
tional)
IC Board
Power、
Fuse
Top cover(optional
Light board display
LED display(2 figures)
LED display(3 figures)
Coin LED display
(2 figures)
Ticket dispenser
Coin selector
Ticket box
Cash box(inside
Bass speaker
inside
Ball
holder kit
【Back】 【Side】
I/O control Board
Board cover
Basket cover
Light cover
AC Cable line
Electrical plug display
Lower Side Net
(Frame Included)×4(optional)
IV.Assembly and disassembly
1. Assembly and disassembly for Disassembly type
Main
art
Step 1:
1.Screw【Lower Side Net (optional)】on the basket board front.
- 7 -
P.35 NO.32
screw(M4×10)×10
P.35 NO.32
screw(M4×10)×10
Assembly parts
2BR Back right net stander kit
2BL Back left net stander kit
3A Front right net stander kit
3B Front left net stander kit
Lower Side Net(Frame Included)
Step 2:
1.Screw【1B Basket kits】on the basket board front.
- 8 -
Assembly parts
1B Basket kits
2A Basket board
P.34 NO.13 screw(M6×18)×2
screw(M6×16)×2
P.35 NO.21 nut(M6)×4
Step 3:
1. Screw【2BR、2BL Back left & right net stander kits】on basket board left and right.
2. Screw【2C Front net stander bridge(short)】on Back left & Right net stander kits.
- 9 -
Assembly parts
Insert position
P.34 NO.04 screw (M8×88)×4
P.35 NO.19 nut (M8)×4
2A Basket board
2BR Back right net stander kit
2BL Back left net stander kit
2C Front net stander
bridge(short)
P.34 NO.10 screw (M6×48)×2
P.35 NO.20 nut (M6)×2
Step 4:
Assemble【3A、3B Front right & left net stander kit】on basket board left and right,
- 10 -
connect with screw & fixed it as drawing.
Insert position
Assembly parts
3A Front right net stander kit
3B Front left net stander kit
Step 5:
P.34 NO.04
screw (M8×88)×4
P.35 NO.19 nut (M8)×4
- 11 -
Screw the【BF、FB、FF Base holders & Front net stander bridge(short)】step by
step as drawing.
Base holder BB
Front net stander bridge(short)
BF
FB
FF
Assembly parts
2C Front net stander
bridge(short)
4A Base holder BF
4B Base holder FB
4C Base holder FF
4D Base holder BB
P.34 NO.10
screw (M6×48)×9
P.35 NO.20 nut (M6)×9
P.35 NO.30
washer(M6.5×13.5)×9
P.34 NO.10
screw (M6×48)×6
P.35 NO.20
nut (M6)×6
P.34 NO.11
screw (M6×26)×2
P.35 NO.20 nut (M6)×2
- 12 -
Step 6:
Screw the【5A Wooden base A type、5B Ball holder kit、5C Ball guide kits】step by step
as drawing.
Wooden base A type
Ball holder kit
Ball guide kits
Assembly parts
5A Wooden base A type
5B Ball holder kit
5C Ball guide kits
P.34 NO.10
screw (M6×26) ×6
P.35 NO.20
nut(M6) ×6
P.35 NO.30
washer(M6.5×13.5) ×6
P.34 NO.11 screw (M6×26)×12
P.35 NO.20 nut (M6)×12
P.35 NO.30 washer(M6.5×13.5) ×12
- 13 -
Step 7:
1. Screw【6A Ball net holder kit】.
2. Screw【6B Main part】、【Metal Shelf (optional)】.
Assembly parts:
6A Ball net holder kit
6B Main part
Metal Shelf (optional)
- 14 -
Ball net holder kit
Metal Shelf (optional)
Main part
P.35 NO.31
Hexagonal Phillips screw will 2
Washers included 2 on each side
P.34 NO.08 screw (M8×16)×4
P.35 NO.19 nut (M8)×4
P.35 NO.30 washer(M10×20)×4
Step 8:
1.Fix the 3 main cords as the following drawing.
2.Run the IC board plug and the ball holder kit plug located underneath the front
P.34 NO.04
screw (M8×88)×4
P.35 NO.19 nut(M8)×4
P.35 NO.27
×
×
- 15 -