Sealer Sales, Inc. Page 2
ST-1606-20-110 Volt Tunnel Service Manual
IMPORTANT - PLEASE READ THIS CAREFULLY
The development of a good safety program, that is rigidly enforced, is absolutely imperative when involved in the operation of industrial equipment. Our machinery is well designed and includes extremely important safety features. The part you the user play through proper installation and maintenance procedures is of far greater significance than our designs. Only properly trained individuals following rigidly enforced safety rules, as recommended by A.N.S.I. and O.S.H.A., should be allowed to operate these machines.
Sealer Sales, Inc. Page 3
ST-1606-20110 Volt Tunnel Service Manual
TABLE OF CONTENTS
___________________________________________________________
Preface
Unpacking 4-8 Warranty Notice 9 Warranty 10-11 Warranty Exceptions 12 Warnings 13-15
Tunnel Section
Description and Specifications 16 Installation and Basic Set-Up 17-18 Front Panel Diagram 19 Sequence of Operation 20-21 Temperature Control Adjustment 22 Troubleshooting 23-31 Troubleshooting–Conveyor Malfunction 23-26 Troubleshooting–No Air Flow 27-28 Troubleshooting–No Heat 29-31 Maintenance 32-46 Maintenance—Replace Conveyor Rollers 33-35 Maintenance—Replace Idler Shaft 35 Maintenance—Replace Drive Shaft 36-37 Maintenance—Replace Conveyor Motor 37-38 Maintenance—Replace Heater Bank 39-41 Maintenance—Replace Temperature Controller 42 Maintenance—Replace Blower Motor 43-44 Maintenance—Replace Wear Rails 44-46 Electrical Panel Diagram 47 Electrical Schematic 48 Parts List Nomenclature 49 Replacement Parts List 50-51 Spare Parts List 52
Sealer Sales, Inc. Page 4
ST-1606-20-110 Volt Tunnel Service Manual
UNPACKING
THOROUGHLY INSPECT EQUIPMENT UPON ARRIVAL.
If goods are received short or in a damaged condition, it is
important that you notify the carrier’s driver before he leaves your company and insist on a notation of the loss or damage across the
face of the freight bill. Unless this is done, no claim can be enforced against the transportation company.
If concealed loss or damage is discovered, notify the carrier at once and insist on an inspection. This is absolutely necessary! A concealed damage report must be made no later than ten (10) days from the date the shipment was delivered. Unless you do this, the
carrier will not consider any claim for loss or damage. The carrier’s
agent will then make an inspection and grant a concealed damage notation. If you give the transportation company a clear receipt for the goods that have been damaged or lost in transit, you do so at your own risk and expense.
All claims must be filed within six 30 days of delivery date or carrier will not accept them.
Sealer Sales, Inc. is willing to assist in every possible manner to collect claims for loss or damage; however, this does not hold Sealer Sales, Inc. responsible for collection on claims or replacement of material.
Do not throw away damaged pallets or box until freight inspection has occurred.
UNPACKING
Sealer Sales, Inc. Page 5
ST-1606-20-110 Volt Tunnel Service Manual
Your new Sealer Sales, Inc. Tunnel comes bolted to a pallet and has a tri-walled corrugated box strapped to the pallet to protect the tunnel. The larger box is the Tunnel and the smaller box on the right is the leg set.
If your machine does not arrive in this condition, write on
shipping paperwork that outside of box is damaged. Concealed damage may have occurred.
If you ordered the Tabletop unit, it comes complete in one box.
UNPACKING
Sealer Sales, Inc. Page 6
ST-1606-20-110 Volt Tunnel Service Manual
UNPACKING
1. Cut the two steel straps holding corrugated box to pallet.
2. Remove tri-wall corrugated box from pallet.
UNPACKING
Sealer Sales, Inc. Page 7
ST-1606-20-110 Volt Tunnel Service Manual
UNPACKING
3. Remove plastic bag and stretch film that covers machine.
4. Unbolt tunnel from base of pallet using Phillips screwdriver.
5. Place forks of forklift under center of tunnel to lift off the pallet.
6. If you ordered the Leg Kit – Leave tunnel on forklift and install leg
set using the bolts provided.
7. Place in desired location and lock casters.
UNPACKING
Sealer Sales, Inc. Page 8
ST-1606-20-110 Volt Tunnel Service Manual
UNPACKING
7. Cut plastic strap from top and bottom of conveyor rollers
before attempting to operate conveyor.
UNPACKING
Sealer Sales, Inc. Page 9
ST-1606-20-110 Volt Tunnel Service Manual
IMPORTANT WARRANTY NOTICES
OPERATING AND MAINTENANCE MANUAL
The operating and maintenance manual has been carefully prepared to provide the user with all the information needed to properly install, operate, and maintain your Sealer Sales, Inc. equipment.
Please read this manual carefully and refer to it for information on the care and use of your Sealer Sales, Inc. equipment. It is recommended that additional copies be ordered for use by production, maintenance, and supervisory personnel. Although the design of this equipment incorporates safeguards to protect personnel, care should be used in operating, adjusting, and servicing.
Attention is directed to the warranty that accompanies all your Sealer Sales, Inc. equipment. The terms and conditions of this warranty apply only to unmodified units. Any
unauthorized modifications to the equipment automatically voids this warranty.
WARRANTY NOTICE
Sealer Sales, Inc. Page 10
ST-1606-20-110 Volt Tunnel Service Manual
Sealer Sales, Inc.
WARRANTY
Sealer Sales, Inc., Inc. warrants each new product manufactured to be free from defects in material and workmanship for a period of (1) year from date of shipment by Sealer Sales, Inc..
This warranty is not transferable with any subsequent resale.
Defective parts under warranty must be returned to Sealer
Sales, Inc. freight prepaid. Sealer Sales's sole obligation and purchaser’s sole remedy in the event of a warranty dispute
shall be, at Sealer Sales’s option, to repair or replace the part in question. Labor incurred in removing or installing the defective part is not covered by this warranty. Prior to returning any parts for any reason, contact Sealer Sales, Inc. for a Return Authorization Number. This number must accompany all returns.
This warranty shall not apply if equipment has been tampered with, misused, improperly installed, altered, or has received damage due to abuse, carelessness, accident or failure to follow recommended regular maintenance procedures or has been serviced by someone other than a duly authorized factory representative without the express written consent of Sealer Sales, Inc., Inc.
This warranty is in lieu of all other warranties, expressed or implied, including but not limited to warranties of merchantability and fitness for a particular purpose, non-infringement or any other matter.
WARRANTY
Sealer Sales, Inc. Page 11
ST-1606-20-110 Volt Tunnel Service Manual
Sealer Sales, Inc. shall have no liability to any person for direct, indirect, incidental or consequential damages or delay resulting from any defect negligence, or tort and customer hereby waives for itself any and all claims for punitive damages and all claims of negligence of strict liability or both. In no event shall our liability exceed the purchase price of the product that was actually paid.
Sealer Sales, Inc. reserves the right to make changes, additions, or improvements to our products with no obligation to make such changes in any previously shipped product covered by this warranty.
Sealer Sales, Inc. shall not be held liable for any damages arising out of nor in connection with the operation of the equipment should customer or its agent fail to maintain equipment in safe operating condition. This warranty shall become unenforceable if and to the extent the customer or its agents remove, disconnect, or otherwise render useless any safety device and or parts designed or affixed by us or fails to maintain and service equipment in a manner as advised.
Sealer Sales, Inc. provides a one-year warranty on parts, excluding shipping or freight costs for replacement parts. All warranty parts are shipped F.O.B. Rancho Cucamonga, California. Service Labor to install part is not covered under warranty!
WARRANTY
Sealer Sales, Inc. Page 12
ST-1606-20-110 Volt Tunnel Service Manual
WARRANTY EXCEPTIONS
The following parts are an exception to the general warranty list on page 10. Each part listed below shall carry a 30-day warranty unless designated otherwise.
ST-1606-20 Tunnel Parts
1. Silicone Tubing (roller covers)
2. Tunnel Curtains
WARRANTY EXCEPTIONS
Sealer Sales, Inc. Page 13
ST-1606-20-110 Volt Tunnel Service Manual
WARNINGS
Every effort has been taken to ensure your safety while operating this machine; however, there still remain certain risks. Do not allow this machine to be operated before informing all personnel of the following warnings.
WARNING........
Do not tamper with the electrical wiring. Only use a licensed electrician for maintenance. Always disconnect the electrical power before attempting any maintenance to all electrical and/or moving parts.
WARNING........
In order to prevent injury to personnel and/or machinery DO NOT INCREASE SETTINGS OR RATINGS ON EITHER ELECTRICAL OR MECHANICAL OVERLOAD SAFETY DEVICES.
WARNING........
KEEP HANDS AWAY FROM MOVING CONVEYORS AND ASSEMBLIES. Conveyor belts that have become worn or frayed are capable of being hazardous. They should be replaced promptly.
WARNING........
NEVER OPERATE THIS OR ANY MOVING EQUIPMENT WITHOUT ALL COVERS AND GUARDS IN PLACE. The internal mechanism of most packaging machinery contains numerous shear, pinch, and inrunning nip points, many of which are capable of causing severe injury and/or permanent disfigurement.
WARNINGS
Sealer Sales, Inc. Page 14
ST-1606-20-110 Volt Tunnel Service Manual
WARNING........
To minimize the potential for personnel injury, always be sure that machine operators and others working on the machinery are properly trained in the correct usage of the equipment and properly instructed regarding the safety procedures for operation.
WARNING........
Heat sealing arms and jaws on packaging machinery can become very warm after a period of use. KEEP HANDS AWAY WHILE IN OPERATION AND USE CAUTION IF THE MACHINE HAS BEEN RUNNING RECENTLY.
WARNING........
ANY MODIFICATIONS TO EITHER THE ELECTRICAL CIRCUITRY OR THE MECHANICAL ASSEMBLIES OF THE MACHINERY WILL VOID ANY WARRANTIES ASSOCIATED WITH THIS EQUIPMENT. Such modifications may introduce hazards that would not otherwise be associated with this machinery. Sealer Sales, Inc. will not be responsible for any consequences resulting from such unauthorized modifications.
WARNING........
The use of certain types of plastic films in sealing and/or shrinking equipment may result in the release of HAZARDOUS FUMES due to the degradation of the film at high temperatures. Before using any plastic film in this equipment, the manufacturer or supplier of the film should be contacted for specific information concerning the potential release of hazardous fumes. ADEQUATE VENTILATION MUST BE PROVIDED AT ALL TIMES.
WARNINGS
Sealer Sales, Inc. Page 15
ST-1606-20-110 Volt Tunnel Service Manual
WARNING........
It is important that the machine operator unplug the
machine when he/she has finished operating the unit.
WARNING........
Turn off machine and disconnect power cord from power
source before attempting to make any repairs or work on machine.
WARNINGS
Sealer Sales, Inc. Page 16
ST-1606-20-110 Volt Tunnel Service Manual
DESCRIPTION AND SPECIFICATIONS OF
MODEL ST-1606-20 TUNNEL
DESCRIPTION
The ST-1606-20 Tunnel is a conveyorized heat shrinking device employing electric heating combined with a recirculating air system, and a complete range of adjustments. The main components are the blower, the heater bank, the shrink chamber, and the package conveyor. Curtains cover the entrance and exit of the heat chamber to minimize heat loss as packages travel through the tunnel. This is a live roller tunnel with High-density roller with 1/2” spacing between rollers to accommodate small packages and special applications. Teflon mesh belt kits are also available.
A simple yet reliable and extremely durable shrink tunnel.
The strength and durability of this model are it’s greatest features. Straightforward, easy manual operation is employed.
Operator training should, at the ultimate extreme, be less than 1-2 hours.
SPECIFICATIONS
Model:
ST- 1606-20
Chamber Size: Width: 16”
Height: 6” Length: 20”
Volts: 110
Amperage: 20
Phase: Single 1/0
Weight: 250 lbs.
DESCRIPTION AND SPECIFICATIONS
Sealer Sales, Inc. Page 17
ST-1606-20-110 Volt Tunnel Service Manual
INSTALLATION AND BASIC SET-UP
IMPORTANT
Read this manual carefully, and make it available to everyone connected with the supervision, maintenance, or production of this machine. Additional copies are available at your request. (Contact your distributor for this information.) Be very careful when operating, adjusting, or servicing this equipment. If in doubt, stop and obtain qualified help before proceeding.
INSTALLATION OF SHRINK TUNNEL
Place the tunnel in the desired location with the required electrical power source available. (See power requirements.) Make certain that proper electrical wiring is provided to guard against low voltage. If the voltage is too low, the equipment will not function properly.
Finding the proper location is a most important function of the initial set-up. One must take several factors into consideration:
1. Adequate power source.
2. Relationship to source of product.
3. Relationship to sealer.
4. Relationship to any conveyors necessary to remove finished product.
5. Convenience of operator.
6. Avoid drafty areas as heat may be unintentionally drawn from the tunnel and reduce its efficiency.
An electrician should install a plug on the end of the main power cord. If there is any doubt, get qualified assistance to do the initial installation. Do not take any chances!
INSTALLATION
Sealer Sales, Inc. Page 18
ST-1606-20-110 Volt Tunnel Service Manual
Do not attempt to install, adjust, or operate this machine without first reading the contents of this manual. Although the design of the equipment incorporates safeguards to protect operating and maintenance personnel, care should be used in operating, adjusting, and servicing.
INSTALLATION
Sealer Sales, Inc. Page 19
ST-1606-20-110 Volt Tunnel Service Manual
-- Front Panel Diagram
ST-1606-20
1. Start Switch -- Green
2. Heater Switch -- White
3. Temperature Control
4. Tunnel Conveyor Speed Control – Small Black Knob
FRONT PANEL DIAGRAM