Samsung M-V19H01 Disassemble

4. Disassembly and Reassembly
Disassembly and Reassembly
4-1
4-1 Deck Parts Locations
4-1-1 Deck (Top View)
1
2
3
4
8
9
10
11
12
13
14
151617
18
19
20
5
Fig. 4-1 Deck Top Parts Location (DX7-R/DX8-R DECK ONLY)
1. ARM TENSION FULL ASS’Y
2. BRAKE MAIN “L” ASS’Y
3. GUIDE ROLLER ASS’Y “T”
4. FULL ERASE HEAD
5. STOPPER TAPE (DX7-R/DX8-R ONLY)
6. GUIDE ROLLER ASS’Y “S”
7. CYLINDER ASS’Y
8. LEVER PINCH CAM
9. LEVER PINCH CAM
10. FULL ACE HEAD AAS’Y
11. UNIT PINCH ROLLER ASS’Y
12. LEVER REVIEW
13. BRAKE SUB “R” ASS’Y
14. REEL DISK “R” ASS’Y
15. GEAR RELAY “T” ASS’Y
16. IDLER ASS’Y
17. GEAR RELAY “S” ASS’Y
18. REEL DISK “L” ASS’Y
19. LEVER JOG ASS’Y (DX8-R/RC ONLY)
20. LEVER REC SWITCH
Disassembly and Reassembly
4-2
4-1-2 Deck (Bottom View)
1
2
3
4
6
5
7
8
9
10
11
13
12
Fig. 4-2 Deck Bottom Parts Location
1. LEVER SLIDE PINCH
2. BELT CAPSTAN
3. MOTOR D.D CAPSTAN
4. BRAKE CAPSTAN ASS’Y
5. GEAR LOADING “R” ASS’Y
6. MOTOR CYLINDER
7. GEAR LOADING “L” ASS’Y
8. SLIDE MAIN
9. LEVER REC SWITCH
10. LEVER IDLER CHANGE
11. CLUTCH ASS’Y
12. UNIT LOADING
13. GEAR MASTER
Disassembly and Reassembly
4-3
4-1-3 Housing
1
2 3
4
6
5
Fig. 4-3 Housing Parts Location
1. CHASSIS SIDE “L” ASS’Y
2. UPPER CHASSIS
3. CHASSIS SIDE “R” ASS’Y
4. SHAFT ARM ASS’Y
5. HOLDER CASSETTE ASS’Y
6. LEVER DOOR
Disassembly and Reassembly
4-4
4-2 Housing Assembly
4-2-1 Removal from Main Base
1. Remove 3 Screws .
2. Lift the Housing AssÕy in the direction of arrow ÒBÓ, while pushing the tab in the direction of arrow
ÒAÓ. (Refer to detail drawing)
3 SCREWS
1
MAIN BASE
TAB
"A"
2
"B"
Fig. 4-4 Housing Ass’y Removal from Main Base
Disassembly and Reassembly
4-5
4-2-2 Disassembly
2 SCREWS
UPPER CHASSIS
CHASSIS SIDE "R"
HOLDER
CASSETTE ASS'Y
SHAFT ARM ASS'Y
CHASSIS SIDE "L"
Fig. 4-5 Housing Ass’y Removal
Disassembly and Reassembly
4-6
4-2-3 Upper Chassis Removal
1. Remove 2 Screws .
2. Lift the Upper Chassis in the direction of arrow ÒAÓ.
2 SCREWS
UPPER CHASSIS
2
"A"
1
Fig. 4-6 Upper Chassis Removal
Disassembly and Reassembly
4-7
4-2-4 Holder Cassette Ass’y and Chassis Side L/R Removal
1. Lift the Cassette Holder in the direction of arrow ÒAÓ (Refer to Fig. A).
2. Remove the Side Chassis ÒLÓ and ÒRÓ from Arm Shaft AssÕy in the direction of arrow ÒBÓ, ÒCÓ
(Refer to Fig. B).
HOLDER CASSETTE ASS'Y
"A"
1
2
4
SHAFT ARM ASS'Y
CHASSIS SIDE "L"
3
CHASSIS SIDE "R"
SLIDE DAMPER
"B"
<Fig. A>
<Fig. B>
<DETAIL>
(REASSEMBLY OF CHASSIS SIDE "R" & SHAFT ARM "R")
(SIDE VIEW)
"C"
"D"
SHAFT ARM "R"
Fig. 4-7 Holder Cassette Ass’y and Chassis Side L/R
Disassembly and Reassembly
4-8
4-2-5 Chassis Side “R” Parts Locations
CHASSIS SIDE "R"
(SIDE VIEW "A")
SLIDE DAMPER
LEVER-LID OPENDER
"A"
SPRING-SLIDE DAMPER
SPRING-LID OPENDER
Fig. 4-8 Chassis Side “R” Parts Locations
Note : If you operate the deck when the Cassette AssÕy Holder is removed, the Arm Shaft ÒRÓ and the
Damper Slide are not returned to their original positions. If this happens by accident, push the Damper Slide of Side Chassis ÒRÓ in the direction of arrow ÒDÓ, and return the Damper Slide in the reverse direction of arrow ÒDÓ when the Arm Shaft AssÕy is in eject mode.
Disassembly and Reassembly
4-9
4-2-6 Slide Damper Removal
1. Remove the Slide Damper Spring .
2. Push the Stopper of the Side Chassis ÒRÓ . Move the Damper Slide in the direction of arrow.
3. Align the Damper Slide with the chassis side tab (as shown detail drawing).
CHASSIS SIDE "R"
CHASSIS SIDE "R" TAB
SLIDE DAMPER
4
STOPPER
3
SLIDE DAMPER
2
SPRING- SLIDE DAMPER
1
Fig. 4-9 Slide Damper Removal
Disassembly and Reassembly
4-10
4-3 Cylinder Ass’y
4-3-1 Exploded View of Cylinder Ass’y
1 SCREW
3 SCREWS
HEAD BRUSH
CYLINDER SUB ASS'Y
HOLDER FPC
MOTOR STATOR
MOTOR ROTOR
RETAINER RUBBER ASS'Y
CYLINDER BASE
2 SCREWS
3 SCREWS
Fig. 4-10 Exploded View of Cylinder Ass’y
Disassembly and Reassembly
4-11
4-3-2 Stopper Tape Removal (Only for Deck : DX7-R/DX8-R)
1. Release 1 tab in the direction of arrow ÒAÓ. (Refer to detail drawing)
2. Lift the Tape Stopper in the direction of arrow ÒBÓ.
STOPPER TAPE
"B"
2
TAB
<DETAIL>
"A"
1
Fig. 4-11 Stopper Tape Removal
4-3-3 Head Cleaner Ass’y Removal (Only for Deck : DX7-RC/DX8-RC)
1. Release 1 tab in the direction of arrow ÒAÓ. (Refer to detail drawing)
2. Lift the Head Cleaner in the direction of arrow ÒBÓ.
ASS'Y HEAD CLEANER
"B"
2
TAB
<DETAIL>
"A"
1
Fig. 4-12 Head Cleaner Ass’y Removal
Disassembly and Reassembly
4-12
4-3-4 Cylinder Ass’y Removal from Main Base
1. Remove 3 Screws holding the Main Base and the Cylinder AssÕy.
2. Lift the Cylinder AssÕy in the direction of arrow.
Note : Do not touch the video heads during removal or installation.
CYLINDER ASS'Y
2
3 SCREWS
1
Fig. 4-13 Cylinder Ass’y Removal from Main Base
Disassembly and Reassembly
4-13
HOLDER FPC
CYLINDER BASE
CYLINDER BASE
HOLDER FPC
<DETAIL : BOTTOM VIEW>
4
3
1 SCREW
1
HEAD BRUSH
2
Fig. 4-14 Head Brush and Holder FPC Removal
4-3-5 Head Brush and Holder FPC Removal
1. Remove 1 Screw and then lift the Head Brush .
2. Release the Holder FPC tab holding the Cylinder Base in the direction of arrow. (Refer to detail
drawing)
3. Disconnect the Holder FPC from the Cylinder Base . Note : When disconnecting the FPC Holder from the Cylinder Base :
Disassembly and Reassembly
4-14
4-3-6 Cylinder Ass’y Removal from Cylinder Base
1. Remove 3 Screws from the Cylinder Base .
2. Lift the Cylinder AssÕy # from the Cylinder Base in the direction of arrow.
CYLINDER SUB ASS'Y
CYLINDER BASE
3 SCREWS
1
2
3
Fig. 4-15 Cylinder Ass’y Removal from Cylinder Base
Disassembly and Reassembly
4-15
4-3-7 Motor Rotor Removal
1. Remove 2 Screws .
2. Lift the Retainer Rubber AssÕy and the Motor Rotor .
RETAINER RUBBER ASS'Y
MOTOR - ROTOR
MOTOR - STATOR
CYLINDER SUB ASS'Y
2
3
4
5
2 SCREWS
1
Fig. 4-16 Motor Rotor Removal
Disassembly and Reassembly
4-16
4-3-8 Motor Rotor and Cylinder Sub Ass’y
1. Make sure that phase matching holes of the Motor Rotor and the Cylinder Sub AssÕy are aligned correctly as shown in Fig. 3-18 (Refer to phase matching hole).
2. Reinstall the Retainer Rubber AssÕy and secure with 2 Screws.
RETAINER RUBBER ASS'Y
MOTOR - ROTOR
PHASE MATCHING HOLE
MOTOR - STATOR
CYLINDER SUB ASS'Y
2
3
4
5
2 SCREWS
1
Fig. 4-17 Assembly of Motor Rotor and Cylinder Sub Ass’y
Disassembly and Reassembly
4-17
4-3-9 Motor Stator Removal
1. Remove 3 Screws .
2. Remove the Motor Stator from the Cylinder Sub AssÕy .
3 SCREWS
MOTOR - STATOR
CYLINDER SUB ASS'Y
1
2
3
Fig. 4-18 Motor Stator Removal
Disassembly and Reassembly
4-18
4-3-10 Motor Stator and Cylinder Sub Ass’y
1. Reinstall the Motor Stator toward the FPC cable of Cylinder Sub AssÕy .
2. Secure with 3 Screws. (Refer to Fig. 4-19)
MOTOR - STATOR
CYLINDER SUB ASS'Y
1
2
Fig. 4-19 Assembly of Motor Stator and Cylinder Sub Ass’y
Disassembly and Reassembly
4-19
4-4 Main Deck Removal and Reassembly
4-4-1 Slide Rack Housing Removal
1. Lift the Slide Rack Housing in the direction of arrow.
SLIDE RACK HOUSING
Fig. 4-20 Slide Rack Housing Removal
Disassembly and Reassembly
4-20
4-4-2 Assembly of Slide Rack Housing and Gear Master
1. Confirm that the hole of Master Gear and the hole ÒAÓ of Main Base are aligned correctly.
(Eject mode)
2. Align the Slot #1 of Master Gear with the Tooth #1 of Rack Housing Slide . (Refer to timing point)
(SLIDE VIEW)
DETAIL
A
TIMING POINT
SLOT #1
TOOTH #1
GEAR MASTER
( TOP VIEW )
( SIDE VIEW )
1
SLIDER RACK HOUSING
ARM " R"
2
Fig. 4-21 Assembly of Slide Rack Housing and Gear Master
Loading...
+ 46 hidden pages