Samsung DVD-V642K, DVD-V645K, DVD-V940K, DVD-V2500K, DVD-V2900K Service Manual

...
SERVICE
1. Precautions
2. Alignment and Adjustment
4. Electrical Parts List
5. Block Diagram
6. Schematic Diagrams
Manual
DVD-VCR COMBINATION CONTENTS
SERVICE MANUAL DVD-V940K/V645K/V642K/V29000K/V25000K, SV-DVD240
ELECTRONICS
© Samsung Electronics Co., Ltd. APR. 2004
Printed in Korea
AK82-00556A
If you want to know additional information which is not included on this Service Manual, please refer to the DVD-V940K Training Manual (AK82-00557A).
This Service Manual is a property of Samsung Electronics Co .,Ltd. Any unauthorized use of Manual can be punished under applicable
International and/or domestic law.
DVD-VCR COMBINATION
Chassis : Kaiser Karaoke
DVD-V642K / DVD-V645K /
DVD-V940K / DVD-V25000K/ DVD-V29000K / SV-DVD240
IMPORTANT SERVICE GUIDE
MODE SWITCH (PROGRAM SWITCH) ASSEMBLY POINT
1) When installing the ass’y deck on the Main PCB, be sure to align the assembly point of mode switch.
VCR MAIN PCB
ASSEMBLY POINT
Fig. 1
HOW TO EJECT THE CASSETTE TAPE (If the tape is stuck in the unit)
1) Turn the Gear Worm Œ clockwise in the direction of arrow with a screwdriver. (See Fig. 2)
(Other method ; Remove the screw of Motor Load Ass’y, Separate the Motor Load Ass’y)
2) When Slider S, T approachs the unloading position, rotate holder Clutch counterclockwise after inserting screwdriver in the
frame’s bottom hole in order to wind the unwound tape. (Refer to Fig. 3) (If you rotate Gear Worm Œ continuously when tape is unwinding, you may cause tape contamination by grease and
tape damage. Be sure to wind the unwound tape with the unit in the horizontall position.)
3) Rotate Gear Worm Œ clockwise using a screwdriver until the mecha is in the eject state. Remove the tape. (Refer to Fig. 2)
Fig. 2 Fig. 3
Œ GEAR WORM
FRAME
Samsung Electronics 1-1
1. Precautions
1-1 Safety Precautions
1) Before returning an instrument to the customer,
always make a safety check of the entire instrument, including, but not limited to, the following items:
(1) Be sure that no built-in protective devices are
defective or have been defeated during servicing. (1)Protective shields are provided to protect both the technician and the customer. Correctly replace all missing protective shields, including any removed for servicing convenience. (2)When reinstalling the chassis and/or other as­sembly in the cabinet, be sure to put back in place all protective devices, including, but not limited to, nonmetallic control knobs, insulating fish papers, adjustment and compartment covers/shields, and isolation resistor/capacitor networks. Do not oper­ate this instrument or permit it to be operated with­out all protective devices correctly installed and functioning.
(2) Be sure that there are no cabinet openings through
which adults or children might be able to insert their fingers and contact a hazardous voltage. Such openings include, but are not limited to, excessive­ly wide cabinet ventilation slots, and an improper­ly fitted and/or incorrectly secured cabinet back cover.
(3) Leakage Current Hot Check-With the instrument
completely reassembled, plug the AC line cord directly into a 120V AC outlet. (Do not use an iso­lation transformer during this test.) Use a leakage current tester or a metering system that complies with American National Standards institute (ANSI) C101.1 Leakage Current for Appliances and Underwriters Laboratories (UL) 1270 (40.7). With the instrument’s AC switch first in the ON position and then in the OFF position, measure from a known earth ground (metal water pipe, conduit, etc.) to all exposed metal parts of the instrument (antennas, handle brackets, metal cabinets, screw­heads, metallic overlays, control shafts, etc.), espe­cially any exposed metal parts that offer an electri­cal return path to the chassis.
Any current measured must not exceed 0.5mA. Reverse the instrument power cord plug in the out­let and repeat the test. See Fig. 1-1.
Any measurements not within the limits specified herein indicate a potential shock hazard that must be eliminated before returning the instrument to the customer.
Fig. 1-1 AC Leakage Test
(4) Insulation Resistance Test Cold Check-(1) Unplug
the power supply cord and connect a jumper wire between the two prongs of the plug. (2) Turn on the power switch of the instrument. (3) Measure the resistance with an ohmmeter between the jumpered AC plug and all exposed metallic cabinet parts on the instrument, such as screwheads, antenna, control shafts, handle brackets, etc. When an exposed metallic part has a return path to the chassis, the reading should be between 1 and 5.2 megohm. When there is no return path to the chas­sis, the reading must be infinite. If the reading is not within the limits specified, there is the possibil­ity of a shock hazard, and the instrument must be repaired and rechecked before it is returned to the customer. See Fig. 1-2.
Fig. 1-2 Insulation Resistance Test
DEVICE UNDER
TEST
(READING SHOULD
NOT BE ABOVE
0.5mA)
LEAKAGE CURRENT
TESTER
EARTH
GROUND
TEST ALL
EXPOSED METER
SURFACES
ALSO TEST WITH
PLUG REVERSED
(USING AC ADAPTER
PLUG AS REQUIRED)
2-WIRE CORD
Antenna Terminal
Exposed Metal Part
ohm
ohmmeter
Precautions
1-2 Samsung Electronics
2) Read and comply with all caution and safety re­lated notes on or inside the cabinet, or on the chas­sis.
3) Design Alteration Warning-Do not alter or add to the mechanical or electrical design of this instru­ment. Design alterations and additions, including but not limited to, circuit modifications and the addition of items such as auxiliary audio output connections, might alter the safety characteristics of this instrument and create a hazard to the user. Any design alterations or additions will make you, the servicer, responsible for personal injury or property damage resulting therefrom.
4) Observe original lead dress. Take extra care to assure correct lead dress in the following areas: (1) near sharp edges, (2) near thermally hot parts (be sure that leads and components do not touch ther­mally hot parts), (3) the AC supply, (4) high voltage, and (5) antenna wiring. Always inspect in all areas for pinched, out-of-place, or frayed wiring, Do not change spacing between a component and the printed-circuit board. Check the AC power cord for damage.
5) Components, parts, and/or wiring that appear to have overheated or that are otherwise damaged should be replaced with components, parts and/ or wiring that meet original specifications. Additionally, determine the cause of overheating and/or damage and, if necessary, take corrective action to remove any potential safety hazard.
6) Product Safety Notice-Some electrical and mechani­cal parts have special safety-related characteristics which are often not evident from visual inspection, nor can the protection they give necessarily be obtained by replacing them with components rated for higher voltage, wattage, etc. Parts that have spe­cial safety characteristics are identified by shading, an ( )or a ( )on schematics and parts lists. Use of a substitute replacement that does not have the same safety characteristics as the recommended replacement part might create shock, fire and/or other hazards. Product safety is under review con­tinuously and new instructions are issued whenev­er appropriate.
Precautions
Samsung Electronics 1-3
1-2 Servicing Precautions
CAUTION : Before servicing units covered by this service manual and its supplements, read and follow the Safety Precautions section of this manual.
Note : If unforseen circumstances create conflict between the following servicing precautions and any of the safety precautions, always follow the safety pre­cautions. Remember: Safety First.
1-2-1 General Servicing Precautions
(1) a. Always unplug the instrument’s AC power cord
from the AC power source before (1) re-moving or reinstalling any component, circuit board, module or any other instrument assembly, (2) disconnecting any instrument electrical plug or other electrical connection, (3) connecting a test substitute in parallel with an electrolytic capaci­tor in the instrument.
b. Do not defeat any plug/socket B+ voltage inter-
locks with which instruments covered by this service manual might be equipped.
c. Do not apply AC power to this instrument and
/or any of its electrical assemblies unless all solid-state device heat sinks are correctly in­stalled.
d. Always connect a test instrument’s ground lead
to the instrument chassis ground before connect­ing the test instrument positive lead. Always remove the test instrument ground lead last.
Note : Refer to the Safety Precautions section ground lead last.
(2) The service precautions are indicated or printed on
the cabinet, chassis or components. When servic­ing, follow the printed or indicated service precau­tions and service materials.
(3) The components used in the unit have a specified
flame resistance and dielectric strength. When replacing components, use components which have the same ratings. Components identi­fied by shading, by( ) or by ( ) in the circuit dia­gram are important for safety or for the characteris­tics of the unit. Always replace them with the exact replacement components.
(4) An insulation tube or tape is sometimes used and
some components are raised above the printed wiring board for safety. The internal wiring is sometimes clamped to prevent contact with heat­ing components. Install such elements as they were.
(5) After servicing, always check that the removed
screws, components, and wiring have been in­stalled correctly and that the portion around the serviced part has not been damaged and so on. Further, check the insulation between the blades of the attachment plug and accessible conductive parts.
1-2-2 Insulation Checking Procedure
Disconnect the attachment plug from the AC outlet and turn the power ON. Connect the insulation resi­stance meter (500V) to the blades of the attachment plug. The insulation resistance between each blade of the attachment plug and accessible conductive parts(see note) should be more than 1 Megohm.
Note : Accessible conductive parts include metal pan­els, input terminals, earphone jacks, etc.
Precautions
1-4 Samsung Electronics
1-3 ESD Precautions
Electrostatically Sensitive Devices (ESD)
Some semiconductor (solid state) devices can be dam­aged easily by static electricity. Such components commonly are called Electrostati­cally Sensitive Devices(ESD). Examples of typical ESD devices are integrated circuits and some field-effect transistors and semiconductor chip components. The following techniques should be used to help reduce the incidence of component damage caused by static electricity.
(1) Immediately before handling any semiconductor
component or semiconductor-equipped assembly, drain off any electrostatic charge on your body by touching a known earth ground. Alternatively, obtain and wear a commercially available dis­charging wrist strap device, which should be removed for potential shock reasons prior to apply­ing power to the unit under test.
(2) After removing an electrical assembly equipped
with ESD devices, place the assembly on a conduc­tive surface such as aluminum foil, to prevent elec­trostatic charge buildup or exposure of the assem­bly.
(3) Use only a grounded-tip soldering iron to solder or
unsolder ESD devices.
(4) Use only an anti-static solder removal devices.
Some solder removal devices not classified as “anti-static” can generate electrical charges suffi­cient to damage ESD devices.
(5) Do not use freon-propelled chemicals. These can
generate electrical charges sufficient to damage ESD devices.
(6) Do not remove a replacement ESD device from its
protective package until immediately before your are ready to install it.(Most replacement ESD devices are packaged with leads electrically short­ed together by conductive foam, aluminum foil or comparable conductive materials).
(7) Immediately before removing the protective ma-
terials from the leads of a replacement ESD device, touch the protective material to the chassis or cir­cuit assembly into which the device will be installed.
CAUTION : Be sure no power is applied to the ch­assis or circuit, and observe all other safety precau­tions.
(8) Minimize bodily motions when handling unpack-
aged replacement ESD devices. (Otherwise harm­less motion such as the brushing together of your clothes fabric or the lifting of your foot from a car­peted floor can generate static electricity sufficient to damage an ESD device).
Precautions
Samsung Electronics 1-5
1-4 Handling the optical pick-up
The laser diode in the optical pick up may suffer elec­trostatic breakdown because of potential static elec­tricity from clothing and your body.
The following method is recommended. (1) Place a conductive sheet on the work bench (The
black sheet used for wrapping repair parts.)
(2) Place the set on the conductive sheet so that the
chassis is grounded to the sheet.
(3) Place your hands on the conductive sheet(This
gives them the same ground as the sheet.)
(4) Remove the optical pick up block
(5) Perform work on top of the conductive sheet. Be
careful not to let your clothes or any other static sources to touch the unit.
Be sure to put on a wrist strap grounded to the sheet.
Be sure to lay a conductive sheet made of copper etc. Which is grounded to the table.
Fig.1-3
(6) Short the short terminal on the PCB, which is in-
side the Pick-Up ASS’Y, before replacing the Pick­Up. (The short terminal is shorted when the Pick­Up Ass’y is being lifted or moved.)
(7) After replacing the Pick-up, open the short termi-
nal on the PCB.
THE UNIT
WRIST-STRAP FOR GROUNDING
1M
1M
CONDUCTIVE SHEET
Precautions
1-6 Samsung Electronics
1-5 Pick-up disassembly and reassembly
1-5-1 Disassembly
1) Remove the power cord.
2) Disassemble the Deck-Assy.
3) Make solder land 2 points short on Pick-up. (See Fig. 1-4)
4) Disassemble the Pick-up.
1-5-2 Assembly
1) Replace the Pick-up.
2) Remove the soldering 2 points on Pick-up.
3) Reassemble the Deck-Assy.
PICK-UP ASS'Y
SOLDER LAND 2 POINTS SHORT
Note : If the assembly and disassembly are not done in correct sequence, the Pick-up may be damaged.
Fig. 1-4
Samsung Electronics
2-1
2. Alignment and Adjustments
2-1 VCR Adjustment
1) X-Point (Tracking center) adjustment, “Head switching adjustment” and “NVRAM option setting” can be adjusted with remote control.
2) When replacing the Main PCB Micom (IC601) and NVRAM (IC603 ; EEPROM) be sure to adjust the “Head switching adjustment” and “NVRAM option setting”.
3) When replacing the cylinder ass’y, be sure to adjust the “X-Point” and “Head switching adjustment”.
4) How to adjust.
- Short the “TEST” Point on VCR MAIN PCB to set the adjustment mode.
- If the corresponding adjustment button is pressed, the adjustment is performed automatically.
- When the adjustment is completed, be sure to turn the power off.
2-1-1(a) Location of adjustment button of remote control
Fig. 2-1
X-Point (Tracking Center) Adjustment ;
Head Switching Adjustment ;
NVRAM Option Setting ;
OPEN/CLOSE
STANDBY/ON
PROG / TRK
OK
KARAOKE SEARCH
KARAOKE
VOLUME
2-1-1 Reference
2-2
Alignment and Adjustments
Samsung Electronics
2-1-1(b) TEST location for adjustment mode setting
Fig. 2-2 VCR Main PCB (Top View)
SHORT
Alignment and Adjustments
2-3
Samsung Electronics
2-1-2 Head Switching Point Adjustment
1) Playback the alignment tape.
2) Short the “TEST” Point on VCR MAIN PCB to set the adjustment mode.. (See Fig. 2-2)
3) Press the “1, 0” buttons; remote control adjustment operates automatically. (See Fig. 2-1)
2-1-3 NVRAM Option Setting
1) Short the “TEST” Point on VCR MAIN PCB to set the adjustment mode.. (See Fig. 2-2)
2)
Press the “1, 4” button on the remote control. The option setting appears. (See Fig. 2-3)
3)
Select the option number (See table 2-1) of corresponding model with “ , , , ” buttons on the remote control.
4) After selecting the option number is completed, press the “ ” button of remote control. (If “ ” button is pressed, the selected number is changescolor. ; See Fig. 2-4)
5) Press the “ENTER” button of remote control again to store the option number.
6) Turn the Power off.
1) NVRAM Option is adjusted in the factory.
2) In case Main PCB Micom (IC601) and NVRAM (IC603 ; EEPROM) are replaced, be sure to set the corresponding option number of the required model. (If the option is not set, the unit will not operate.)
MOVE : SAVE : ENTER
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Fig. 2-3
MOVE : COMPLETE
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Fig. 2-4
2-4
Alignment and Adjustments
Samsung Electronics
<Table 2-1 NVRAM Option Table>
MODELS OPTION NUMBERS
DVD-940K/CHN 6, 7, 9, 10, 12, 17, 18, 19, 20, 22, 25, 26, 28, 30, 31, 33, 35, 38, 39, 42, 44, 47, 48, 50, 51, 57, 61, 63, 65, 66
SV-DVD240/XEV 6, 10, 12, 17, 19, 20, 30, 33, 34, 35, 36, 37, 39, 42, 47, 48, 51, 52, 54, 57, 61, 63, 65, 66 DVD-V940K/XSA 1, 6, 7, 9, 10, 12, 17, 18, 19, 20, 28, 30, 33, 34, 39, 42, 44, 47, 48, 50, 51, 57, 61, 63, 65, 66 DVD-V940K/XSH 1, 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 25, 28, 30, 31, 35, 37, 38, 41, 42, 44, 47, 48, 50, 51, 57, 61, 63, 65, 66 DVD-V940K/XST 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 30, 34, 36, 37, 38, 42, 44, 47, 48, 50, 51, 57, 61, 63, 65, 66
DVD-V940K/XSS, XSV 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 30, 34, 36, 37, 38, 42, 44, 47, 48, 50, 51, 57, 61, 63, 65, 66
DVD-V940K/SMR, BPT 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 30, 34, 36, 37, 38, 42, 44, 47, 48, 50, 51, 57, 61, 63, 65, 66
DVD-V940K/XTL 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 30, 34, 36, 37, 39, 42, 44, 47, 48, 50, 51, 57, 61, 63, 65, 66
DVD-V29000K 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 29, 30, 34, 36, 38, 42, 44, 47, 48, 50, 51, 56, 57, 61, 63, 65, 66 DVD-V25000K 6, 9, 10, 12, 17, 18, 19, 20, 22, 29, 30, 34, 36, 38, 42, 44, 47, 48, 52, 56, 57, 61, 63, 65, 66
DVD-V940K/XSG, ELT 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 30, 34, 36, 38, 42, 44, 47, 48, 50, 51, 55, 57, 61, 63, 65, 66
DVD-V940K/UMG, TAW 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 22, 30, 34, 36, 38, 42, 44, 47, 48, 50, 51, 55, 57, 61, 63, 65, 66
DVD-V645K/XSG, ELT 6, 9, 10, 12, 17, 18, 19, 20, 22, 30, 33, 34, 35, 36, 38, 42, 44, 47, 48, 52, 55, 57, 61, 63, 65, 66
DVD-V645K/UMG, TAW 6, 9, 10, 12, 17, 18, 19, 20, 22, 30, 33, 34, 35, 36, 38, 42, 44, 47, 48, 52, 55, 57, 61, 63, 65, 66
DVD-V642K/XSG, ELT 9, 10, 12, 17, 18, 19, 20, 22, 30, 33, 34, 35, 36, 38, 42, 44, 47, 48, 52, 55, 57, 61, 63, 65, 66
DVD-V642K/UMG, TAW 9, 10, 12, 17, 18, 19, 20, 22, 30, 33, 34, 35, 36, 38, 42, 44, 47, 48, 52, 55, 57, 61, 63, 65, 66
Alignment and Adjustments
2-5
Samsung Electronics
2-2 DVD Adjustment
2-2-1 Location of Test Point
Fig. 2-5 Location of test Point (Main PCB - Top Side)
Pin 29 of RIC1
2-6
Alignment and Adjustments
Samsung Electronics
2-2-2(a) Adjustment Spec. and Test Point
2-2-2 Skew Adjustment
Test Disc Adjustment Spec. Test Point Adjustment Location
TDV-533 “Pin 29 of RIC1” Ass’y Deck - Top Side
Chapter 14 Flat Waveform (DVD Main PCB - Top Side) (See Fig. 2-6)
(See Fig. 2-5)
Fig. 2-6 Ass’y Deck (Top Side)
Test Disc ; Service not Available
<Table 2-2>
Alignment and Adjustments
2-7
Samsung Electronics
2-2-2(b) SKEW Adjustment Method
Needed to minimize the variations in Skew of the Pickup unit and to provide optimum match with the recorded signal on the Disc.
1) Connect an Oscilloscope to the “Pin 29 of RIC1” Test Point (See Fig. 2-5).
2) Connect Power, Open the Tray and Play Ch.14 Which is in the TDV-533 Disc.
Set the Oscilloscope Range as follows : (Voltage ; 50mV/Div., Frequency ; 10m Sec.)
3) Adjust the Screws “A” and “B” (See Fig. 2-6) using a Hex screwdriver until you obtain a Flat Waveform and the picture is stable. Then, go to Chapter 1 and make sure the Waveform is Flat here as well. If not, you have to go back to Chapter 14 and adjust again. If you cannot obtain a Flat waveform, then the unit is defective.
Note : The Deck must be in a horizontal position. Use both “A” and “B” screws to adjust.
    

     
Typical Waveform before Adjustment Waveform after Correct Adjustment
Fig. 2-7 Envelope Waveform
2-8
Alignment and Adjustments
Samsung Electronics
2-3 VCR Mechanical Adjustment
2-3-1 Tape Transport System and Adjustment Locations
The tape transport system has been adjusted precisely in the factory. Alignment is not necessary except for the following :
1) Noise observed on the screen.
2) Tape damage.
3) Parts replacement in the tape transport system.
Lower flange height of tape guide is used as the reference for the transport adjustment. To maintain the height of the tape guide and prevent damage, do not apply excessive force onto the main base.
Fig. 2-8 Location of Tape Transport Adjustment
Fig. 2-9 Tape Travel Diagram
CYLINDER ASS'Y
TAKE UP REEL DISK
#8 GUIDE POST
#9 GUIDE POST
SUPPLY REEL DISK
CAPSTAN
PINCH ROLLER
GUIDE ROLLER "T"
GUIDE ROLLER "S"
FULL ERASE HEAD
#3 GUIDE POST
TENSION POST
HEIGHT SCREW
TILT SCREW
X - POSITION ADJUST SILT
AZIMUTH SCREW
POST TENSION
MAIN BASE
FE HEAD CYLINDER ASS'Y
PINCH ROLLER
GUIDE ROLLER "S" GUIDE ROLLER "T"
#8 GUIDE POST #9 GUIDE POST
CAPSTAN SHAFT
ACE HEAD
#3 GUIDE POST
Alignment and Adjustments
2-9
Samsung Electronics
2-3-2 Tape Transport System Adjustment
When parts are replaced, perform the required adjustments by referring to procedures for the tape transport system. If there are any changes to the tape path, first run a T-120 tape and make sure excessive tape wrinkle does not occur at the tape guides.
If tape wrinkle is observed at the guide roller S, T, turn the guide roller S, T until wrinkle disappears.
If the tape wrinkle is still observed at the tape guide, perform the tilt adjustment of the ACE head.
(1) ACE Head Assembly Adjustment
a. ACE HEAD HEIGHT ADJUSTMENT
1) Run the alignment tape (Color bar) in the playback mode.
2) Observe surface of the audio head using a dental mirror.
3) Turn screw (C) clockwise or counterclockwise until the gap of lower tape edge and the lower edge of the control head is about 0.25mm. (Refer to Fig. 2-10 and 2-11)
Fig. 2-10 Location of ACE Head Adjustment Screw
Fig. 2-11 ACE Head Height Adjustment
SCREW (A)
TLIT ADJUST
X-POSITION
ADJUSTING SLIT
SCREW (C) HEIGHT ADJUST
SCREW (D) X-POSITION LOCKING
SCREW (B)
AZIMUTH ADJUST
0 ~ 0 .25 mm
AUDIO HEAD
VIDEO HEAD
CONTROL HEAD
2-10
Alignment and Adjustments
Samsung Electronics
b. ACE HEAD TILT ADJUSTMENT
1) Playback a blank tape and observe the position of the tape at the lower flange of tape guide.
2) Confirm that there is no curl or wrinkle at the lower flange of tape guide as shown in Fig. 2-12 (B).
3) If a curl or wrinkle of the tape occurs, slightly
turn the screw (A) tilt adjust on the ACE head ass’y.
4) Reconfirm the ACE head height.
Fig. 2-12 Tape Guide Check
c. AUDIO AZIMUTH ADJUSTMENT
1) Load alignment tape (Mono scope) and playback the 7KHz signal.
2) Connect channel-1 scope probe to audio output.
3) Adjust screw (B) to achieve maximum audio level. (See Fig. 2-10)
(A) (B)
(BAD)
WRINKLE
(GOOD)
Alignment and Adjustments
2-11
Samsung Electronics
d. ACE HEAD POSITION (X-POINT) ADJUSTMENT
1) Playback the alignment tape (Color bar)
2) Short the “TEST” Point on VCR MAIN PCB to set the adjustment mode.. (See Fig. 2-2)
3) Press the “0, 5” remote control buttons, then adjustment is operates automatically. (See Fig. 2-1)
4) Connect the CH-1 probe to “Envelope” the CH-2 probe to “H’D switching pulse” and then trigger to CH-1.
5) Insert the (-) driver into the X-Point adjustment hole and adjust it so that envelope waveform is maximum.
Test point : W325 (Audio Output)
W324 (Envelope) W323 (H’D S/W -Trigger) W322 (Control Pulse)
Fig. 2-13 Location of Test point (VCR Main PCB-Top View)
AUDIO OUTPUT
CONTROL PULSE
HEAD SWITCHING
ENVELOPE
2-12
Alignment and Adjustments
Samsung Electronics
(2) Linearity adjustment (Guide roller S, T adjustment)
1)
Playback the Mono Scope alignment tape (SP mode).
2) Observe the video envelope signal on an oscilloscope (triggered by the video switching pulse).
3) Make sure the video envelope waveform (at its minimum) meets the specification shown in Fig. 2-14. If it does not, adjust as follows :
Note :
a=Maximum output of the video RF envelope. b=Minimum output of the video RF envelope at the entrance side. c=Minimum output of the video RF envelope at the center point. d=Maximum output of the video RF envelope at the exit side.
4) If the section A in Fig. 2-15 does not meet the specification, adjust the guide roller S up or down.
5) If the section B in Fig. 2-15 does not meet the specification, adjust the guide roller T up or down.
Fig. 2-14 Envelope Waveform Adjustment
a
a b c d c,b,d/a
63%
b
c
d
Fig. 2-15 Adjustment Points
AB
A B
H'D SWITCHING PULSE
ENVELOPE
Alignment and Adjustments
2-13
Samsung Electronics
6) Play back the Mono Scope alignment tape (SP mode).
7) Connect an oscilloscope CH-1 to the “Envelope” and CH-2 to the “H’D SW Pulse” for triggering.
8)
Turn the guide roller heads with a flat head ( ) driver to obtain a flat video RF envelope as shown in Fig. 2-16.
Fig. 2-16 Guide Roller S, T Height Adjustment
IDEAL ENVELOPE
S HEIGHT TOO HIGH
S HEIGHT TOO LOW
T HEIGHT TOO HIGH
T HEIGHT TOO LOW
GUIDE ROLLER S
GUIDE ROLLER T
2-14
Alignment and Adjustments
Samsung Electronics
(3) Check Transitional Operation from RPS to Play
Check transition from RPS mode to play mode : Using a pre-recorded SP tape, make sure the entry side of enve­lope comes to an appropriate steady state within 3 seconds (as shown in Fig. 2-17). If the envelope waveform does not reach specified peak-to peak amplitude within 3 seconds, adjust as follows :
1) Make sure there is no gap between the supply roller lower flange and the tape. If there is a gap, adjust the supply guide roller again.
2) Change operation mode from the RPS to the play mode (again) and make sure the entry side of envelope rises within 3 seconds.
ENTRANCE SIDE ENVELOPE
Fig. 2-17 Video Envelope Rising when Operation mode Changes from RPS to Play Mode
(4) Envelope Check
1) Make recordings on T-120 (E-120) and T-160 (E-180) tape. Make sure the playback output envelope meets the specification as shown in Fig. 2-18.
2) Play back a self recorded tape (recording made on the unit using with T-120 (E-120). The video envelope should meet the specification as shown in Fig. 2-18. In SP mode, (A) should equal (B). If the head gap is wide, upper cylinder should be checked.
A
B
Fig. 2-18 Envelope Input and Output Level
(5) Tape Wrinkle Check
1) Run the T-160 (E-180) tape in the playback, FPS, RPS and Pause modes and observe tape wrinkle at each guide.
2) If excessive tape wrinkle is observed, perform the following adjustments in Playback mode :
Tape wrinkle at the guide roller S, T section : Linearity adjustment.
Tape wrinkle at tape guide flange : ACE head assembly coarse adjustment.
Alignment and Adjustments
2-15
Samsung Electronics
2-3-3 Reel Torque
1) The rotation of the capstan motor causes the
holder clutch ass’y to rotate through the belt pulley.
2) The spring wrap PLAY/REV of holder clutch ass’y drives the disk reel S, T through gear idler by rotation of gear center ass’y.
3) Brake is operated by slider cam at FF/REW mode.
4) Transportation of accurate driving force is done by gears. (Gear Center Ass’y)
Note : If the spec. does not meet the followings specifications, replace the holder clutch ass’y and then recheck.
MODE TORQUE g/cm GAUGE
PB 42 ± 11
Cassette Torquemeter
RPS 145 ± 30
Cassette Torquemeter
<Table 2-4>
2-16
Alignment and Adjustments
Samsung Electronics
MEMO
Loading...
+ 54 hidden pages