Rough Country 622N2 User Manual

921622N200
6” Jeep YJ Suspension Lift
Thank you for choosing Rough Country for all your suspension needs.
Rough Country recommends a certified technician install this system. In addition to these instructions, professional knowledge of disassembly and reassembly procedures as well as post install ation checks must be known. Attempts to install this system without this knowledge and expertise may jeopardize the integrity and/or operating safety of the vehi­cle.
With the installation of all lift kits and larger tires it is important to check the condition of your steering stabilizer. If the stabilizer is worn or is leaking it should be replaced. Steering stabilizers are designed to restrain “bump steer” and front­end vibration, giving added life to tires, ball joints, and other steering components. A large bore off-road stabilizer kit is highly recommended for vehicles equipped with larger tires, please contact your Rough Cou ntry distrib utor for details on purchasing this Part #87317.
PRODUCT USE INFORMATION
As a general rule, the taller a vehicle is, the easier it will roll. Offset, as much as possible, what is lost in rollover resis­tance by increasing tire track width. In other words, go "wide" as you go "tall". Many sportsmen remove their mud tires after hunting season and install ones more appropriate for street driving; always use as wide a tire and wh eel combina­tion as possible to enhance vehicle stability.
Seat belts and shoulder harnesses should be worn at all times. Avoid situations where a side rollover may occur. Gener­ally, braking performance and capability are decreased when significantly larger/heavier tires and wheels are used. Take this into consideration while driving.
Do not add, alter, or fabricate any factory or after-market parts to increase vehicle height over the intended height of the Rough Country product purchased. Mixing component brands is not recommended. Rou gh Country makes no claims regarding lifting devices and excludes any and all implied claims. We will not be responsible for any product that is al­tered.
This suspension system was developed using a 35 x12.5 tire on a 15” x 8” wheel with 3.75” of backspacing. If you have any questions concerning the design, function, and/or correct use of our products please contact one of our
customer service representatives us at 800-222-7023.
NOTICE TO DEALER AND VEHICLE OWNER
Any vehicle equipped with any Rough Country product should have a “Warning to Driver” decal installed on the inside of the windshield or on the vehicle’s dash. The decal should act as a constant reminder for whoever is oper-
ating the vehicle of its unique handling characteristics. INSTALLING DEALER - it is your responsibility to install the warning decal and forward these installation instructions on
to the vehicle owner for review. These instructions should be kept in the vehicle for its service life.
IMPORTANT PRE—INSTALLATION INSTRUCTIONS
Prior to beginning this installation it is always good to use a penetrating oil and spray all fasteners that will be removed. Typically the spring eye bolts and the pitman arm are difficult to remove without having done this step. Rough Country does offer a replacement spring bolt kit to replace all leaf spring mounting bolts, Part #1184 that is highly recommended and something that should be considered before proceeding.
Rear Brake Line
KIT CONTENTS
Rear Springs (2)
Rr Track Bar Brkt
Rear Shock
Relocators
Rear U-Bolts
Rear Shocks (2)
Front springs (2)
Kit Includes:
8014-Fr Springs 8016-Rr Springs 1622N2 Kit Box Contains: 6-1/2” x 2 3/4” x 6 1/4” U-bolts 2-1/2” x 3 1/4” x 6 3/4” U-bolts 1-Front Track Bar Bracket 1-Rear Track Bar Bracket 2-Front Sway Bar Disconnect Links 1-Pitman Arm 2-Front Brake Lines 1-Rear Brake Lines 2-Front Shock Absorbers (658718) 2-Rear Shock Absorbers (658692) 2-1/2” U-Bolt Bags 8-1/2” Nuts 8-1/2” Washers 1 -1622N2Bag1: Inst Sheet Bag 1 -1622N2Bag2:Shock Bag 1 -1622Bag1: - Spring Bushings 1- 1622Bag2: - Track Bar Brkts Bag 1– 1186Bag: Front Disconnect Bag 1– 1185Bag: Rear Shock Reloc Bag
Front Shocks (2)
Fr Trk Bar Brkt
Pitman Arm
Kit Hardware Breakdown: 1622Bag1:
For Front & Rear Springs 8-Spring Bushings Large
8 Spring Bushings 4-1/2” ID Spring Sleeves 4-9/16” ID Spring Sleeves
1086Bag: For Front Sway Bar Links 2-12mm x 65mm Bolts
2-Flat Washers 2-12mm Flange Lock Nut 2-Upper Sleeves
1622Bag2:
For Front Track Bar Bracket 1-12mm x 65mm Bolt
1-Flat Washer 2-12mm Flange Lock Nut 1-12mm x 50mm Bolt 1-3/8” x 1 1/4” Bolt 1-3/8” Flat Washer 1-3/8” Flange Lock Nut
For Pitman Arm 1-Cotter Pin
Front Disconnects
Front Brake Lines
1622Bag2 Continued:
For Rear Track Bar Bracket 1-12mmx 65mm Bolt
1-12mm Flange Lock Nut 1-Crush Sleeve 1-3/8” x 1” Bolt 1-3/8’ Flat Washer 1-3/8” Flange Lock Nut
1622N2Bag2: For Fr and Rear Shocks
4-Shock Sleeves 4-Stud Bushings 4-Cup Washers 2-Stud Nuts
1185Bag:
For Rear Shock Relocator 2-12mm x 65mm Bolts 2-12mm Flange Locks 2-5/16” x 3./4” Bolts 2-5/16” Lock Nuts 2-Sleeves
INSTALLATION INSTRUCTIONS
1. Raise the front of the vehicle and support with safety stands under the frame rails. Take care not to over extend the stock brake lines.
2. Remove the front wheels and tires. Remove front stock shocks. Retain the lower shock hardware for reuse.
3. Support the front axle housing with a floor jack (you must have stands under frame supporting vehicle weight).
4. Remove the stock sway bar links from the sway bar and the spring pads. It may be necessary to tap the upper link on the sway bar with a hammer to release the tapered pin. See Photo 1.
5. Unbolt track bar from the axle mount on the passenger side of the front axle as shown in Photo 2 and then tie the bar up and out of the way.
Photo 1
Photo 2
6. Remove the stock brake hose bracket from the top of the frame rail by removing the one bolt located directly behind the shock towers. (Access can be gained through the engine compartment). Retain the factory torx head bolt for re­use.
7. Remove the four front spring to axle u-bolts. See Photo 3. (The remainder of the spring removal and installation is performed one side at a time.)
8. On the driver side position a floor jack under the axle tube, just inside of the leaf spring. Raise the jack until the axle just separates from the spring. Now remove the frame bolts and the shackle bolts on the leaf spring. Retain hard­ware for reuse. See Photo 4. Remove the stock spring.
Photo 3
Photo 4
9. Repeat on the other side.
10. Prior to installation of new springs, thoroughly lubricate the new spring poly eye bushings and sleeves with a water resistant, lithium based grease. Loosely attach the spring (front spring part number is 8010) to its hangers with the stock bolts, washers & nuts (unless optional spring bolt package 1184 was purchased). Note that small spring eye goes to shackle end. Snug up but do not completely tighten. Make sure spring tie bolt heads align and seat into spring perch holes.
11. Install new u-bolts. Tighten u-bolts to 65 ft. lbs. of torque. Tighten spring pivot bolts to 35ft. lbs. on both frame mounts and shackle mounts.
Loading...
+ 5 hidden pages