1Safety requirements
1.1Rosemount™ Gas Chromatograph safety
warnings
Observe these safety messages for the Rosemount 370XA Gas Chromatograph.
WARNING
EXPLOSION HAZARD
Do not open when energized or when an explosive atmosphere may be present.
Failure to de-energize the analyzer may cause serious injury or death to personel.
WARNING
EXPLOSION HAZARD
Keep cover tight while circuits alive.
Failure to de-energize the analyzer before removing the cover may cause serious injury or
death to personel.
WARNING
EXPLOSION/FIRE HAZARD
Do not open when an explosive atmosphere may be present.
Do not open while energized.
Use supply cables or wires suitable for at least 80 ℃ (176 ℉).
Failure to observe this warning may cause serious injury or death to personnel.
WARNING
PHYSICAL ACCESS
Unauthorized personnel may potentially cause significant damage to and/or
misconfiguration of end users’ equipment. This could be intentional or unintentional and
needs to be protected against.
Physical security is an important part of any security program and fundamental to
protecting your system. Restrict physical access by unauthorized personnel to protect end
users’ assets. This is true for all systems used within the facility.
Gas Supply Separation Kit5
Page 6
Safety requirementsQuick Start Guide
April 20192-3-9000-763
6Emerson.com/RosemountGasAnalysis
Page 7
Quick Start GuideInstallation
2-3-9000-763April 2019
2Installation
2.1Installing the gas separation kit
These are the installation instructions for the actuation and carrier gas hardware
separation kit for the Rosemount™ 370XA Gas Chromatograph.
This installation kit contains the hardware necessary to separate the actuation gas supply
from the carrier gas supply for the analyzer.
The contents of the kit are listed in Table 3-1 and are illustrated in Figure 3-1.
Procedure
1. Shut off the carrier and actuation gas supply.
2. Disconnect the actuation gas tubing from the tee fitting and analyzer manifold as
shown in Figure 3-2. Note that the tee fitting may be positioned differently in the
original installation.
3. Screw the cap plug (Figure 3-2, Item A) onto the tee fitting where the actuation gas
tubing was attached. If the analyzer is in a factory supplied enclosure proceed with
Step 4, Step 5 and Step 6. Otherwise skip to Step 7.
4. If the analyzer is in a factory supplied enclosure, drill another hole through the
enclosure to install a bulkhead fitting for the actuation gas supply. The gas line
bulkhead fittings are located on the lower left side of the enclosure. Drill a 29/64 in.
diameter hole approximately 1 in. to 1½ in. horizontally from the forward bulkhead
fitting as shown in Figure 3-3. Install the bulkhead fitting (Table 3-1, Item G).
5. Cut a length of ⅛ in. tubing (Item F) sufficient to extend from the actuation gas
manifold inlet to the bulkhead fitting. A tubing nut and front and rear ferrules
(Table 3-1, Items C, D and E) are required to connect the tubing to the manifold.
The bulkhead union includes the nut and ferrules.
6. Trim the remaining unused tubing to connect the other end of the bulkhead fitting
to the actuation gas supply. A ⅛ in. tube fitting with male ⅛ NPT threads (Figure
3-2, Item B) is commonly used to connect ⅛ in. tubing to the actuation gas pressure
regulator.
7. Cut a length of ⅛ in. tubing (Table 3-1, Item F) sufficient to extend from the
actuation gas manifold inlet to the actuation gas supply. A tubing nut and front and
rear ferrules (Table 3-1, Items C, D and E) are required to connect the tubing to the
manifold. A ⅛ in. tube fitting with male ⅛ NPT threads (Table 3-1, Item B) is used to
connect ⅛ in. tubing to the actuation gas pressure regulator.
8. Open the carrier and actuation gas supplies and set the pressures as appropriate.
Gas Supply Separation Kit7
Page 8
InstallationQuick Start Guide
April 20192-3-9000-763
8Emerson.com/RosemountGasAnalysis
Page 9
Quick Start GuideOrdering information
2-3-9000-763April 2019
3Ordering information
3.1Carrier and actuation gas kit
Table 3-1: Gas Supply Separation Kit P/N 7A00215G01
ITEMQTYPART NO.DESCRIPTIONUNITS
A12-4-4000-143Cap Plug, ⅛ in. Tubing ConnectionEA
B12-4-9500-013Connector, ⅛ in. MNPT X ⅛ in. TubingEA
C32-4-9500-022⅛ in.Tubing Nut, SSTEA
D52-6-5000-336Rear Ferrule, ⅛ in. TubingEA
E52-6-5000-334Front Ferrule, ⅛ in. TubingEA
F102-6-5000-487TUBING, ⅛ in. OD X .085 in. ID, 316 SSFT
G12-4-4000-119Bulkhead Union, ⅛ in. SST TubingEA
Figure 3-1: Carrier and Actuation Gas Separation Kit - Table Items
A. Cap plug
B. ⅛ in. tubing connector
C. ⅛ in.tubing nut
D. Rear ferrule
E. Front ferrule
F. SST tubing, ⅛ in. OD X .085 in. ID
G. Bulkhead union
Gas Supply Separation Kit9
Page 10
Ordering informationQuick Start Guide
April 20192-3-9000-763
Figure 3-2: View of the Rosemount™ 370XA Inlet Gas Manifold
A. Tee fitting
B. Acutation gas tubing nuts
C. Actuation gas tubing
D. Common carrier and actuation gas supply
10Emerson.com/RosemountGasAnalysis
Page 11
Quick Start GuideOrdering information
2-3-9000-763April 2019
Figure 3-3: View of the Rosemount 370XA Actuation Bulkhead Connection
A. Bulkhead fitting drilled hole
B. Enclosure
Gas Supply Separation Kit11
Page 12
2-3-9000-763
Rev. A
2019
AMERICAS
Emerson Automation Solutions
10241 West Little York, Suite 200
Houston, TX 77040 USA
The Emerson logo is a trademark and service mark of Emerson Electric Co. Rosemount is a
mark of one of the Emerson family of companies. All other marks are the property of their
respective owners.
ASIA-PACIFIC
Emerson
1 Pandan Crescent
Singapore 128461
Republic of Singapore
+65 6 777 8211
+65 6 777 0947
gc.csc@emerson.com
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.