REMEHA Quinta Pro, Quinta Pro 55, Quinta Pro 45, Quinta Pro 90, Quinta Pro 115 Installation, User And Service Manual

...
Page 1
United Kingdom
en
Installation, user and service manual
Wall-hung gas condensing boilers
Quinta Pro
30 – 45 – 65 – 90 – 115
Page 2
Thank you for purchasing this appliance.
Please read this manual carefully before using the product and keep it in a safe place for future reference.
In order to ensure continued safe and efficient operation we recommend that the product is regularly maintained. Our Service and After Sales organization can assist with this.
We hope you will receive many years of satisfactory service.
Remeha B.V.
Postbus 32 7300 AA Apeldoorn
T +31 (0)55 549 6969 I http://nl.remeha.com E [email protected]
Page 3
Contents
1 Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.1 General safety instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.2 Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.3 Liabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.3.1 Manufacturer's liability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.3.2 Installer's liability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
1.3.3 User's liability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2 About this manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2.1 Symbols used . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2.1.1 Symbols used in the manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2.2 Afkortingen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3 Technical specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.1 Homologations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.1.1 Certifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.1.2 Unit categories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
3.1.3 Directives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
3.1.4 Factory test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.2 Technical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
3.3 Dimensions and connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
3.4 Electrical diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
4 Description of the product . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.1 General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
4.2 Operating principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.2.1 Circulating pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.2.2 Cascade system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.2.3 Water flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.2.4 Calorifier connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.3 Main components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.4 Control panel description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.4.1 What each key means . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.4.2 Meaning of the symbols on the display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.5 Standard delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
4.6 Accessories and options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
5 Before installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
5.1 Installation regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
5.2 Choice of the location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
5.2.1 Type plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
5.2.2 Boiler position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
5.3 Ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
6 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
6.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
6.2.1 Positioning the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
6.3 Water connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
6.3.1 Rinsing the system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
6.3.2 Connecting the heating circuit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
6.3.3 Connecting the expansion vessel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
6.3.4 Connecting the condensate discharge pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
6.4 Gas connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
6.5 Air supply/flue gas connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
6.5.1 Classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
6.5.2 Outlets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
6.5.3 Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
6.5.4 Length of the air and flue gas pipes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
6.5.5 Additional guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
6.5.6 Connecting the flue gas outlet and air supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
6.6 Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Contents
123157 - v.07 - 10082015 3
Page 4
6.6.1 Control unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
6.6.2 Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
6.6.3 Access to the connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30
6.6.4 Connection options for the standard PCB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
6.6.5 PCBs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
6.7 Filling the system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
6.7.1 Water treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40
6.7.2 Filling the siphon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
6.7.3 Filling the system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40
7 Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
7.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
7.2 Gas circuit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42
7.3 Hydraulic circuit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42
7.4 Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
7.5 Commissioning procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
7.6 Gas settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
7.6.1 Adaptation to a different gas type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
7.6.2 Checking and setting the gas/air ratio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
7.7 Final instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46
8 Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
8.1 Use of the control panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
8.2 Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
8.3 Frost protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
9 Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
9.1 Parameter descriptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48
9.2 Changing the parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
9.2.1 Changing the user-level parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
9.2.2 Changing the parameters at installer level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
9.2.3 Setting the maximum load for CH operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
9.2.4 Return to the factory settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53
9.2.5 Carrying out an auto-detect . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
9.2.6 Setting the manual mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54
9.3 Displaying the measured values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54
9.3.1 Reading the various current values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
9.3.2 Reading out the hour counter and percentage of successful starts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
9.3.3 Status and sub-status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
10 Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
10.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
10.2 Service message . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .58
10.2.1 Resetting the service messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
10.2.2 Starting a new service interval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59
10.3 Standard inspection and maintenance operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
10.3.1 Checking the water pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59
10.3.2 Checking the ionisation current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
10.3.3 Checking the flue gas outlet/air supply connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
10.3.4 Checking the combustion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
10.3.5 Checking the automatic air vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
10.3.6 Cleaning the siphon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62
10.3.7 Checking the burner and cleaning the heat exchanger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
10.4 Specific maintenance work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
10.4.1 Replacing the ionisation/ignition electrode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
10.4.2 Checking the non-return valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65
10.4.3 Reassembling the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
11 Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .66
11.1 Error codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
11.1.1 Blocking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
11.1.2 Lock out . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
11.2 Error memory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
11.2.1 Reading out the error memory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
11.2.2 Clearing error memory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73
Contents
4 123157 - v.07 - 10082015
Page 5
12 Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74
12.1 Removal/recycling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74
13 Spare parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
13.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
13.2 Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
14 Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
14.1 ErP information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
14.1.1 Product card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
14.1.2 Package sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .81
14.2 EC declaration of conformity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .82
14.3 Optional electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
14.3.1 Housing for PCBs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
14.3.2 Connection options for the PCB (SCU-S03) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
14.3.3 Connection options for the PCB (SCU-X02) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
14.3.4 Connection options for the PCB (SCU-X03) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
14.3.5 Connection options for the PCB (c-Mix) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Contents
123157 - v.07 - 10082015 5
Page 6
1 Safety
1.1 General safety instructions
For the installer:
Danger If you smell gas:
1. Do not use naked flames, do not smoke and do not operate electrical contacts or switches (door bell, lighting, motor, lift etc).
2. Shut off the gas supply.
3. Open the windows.
4. Trace possible leaks and seal them off immediate ly.
5. If the leak is upstream of the gas meter, notify the gas company.
Danger If you smell flue gases:
1. Switch the boiler off.
2. Open the windows.
3. Trace possible leaks and seal them off immediate ly.
Caution After maintenance or repair work, check the entire heating installation to ensure that there are no leaks.
For the end user:
Danger If you smell gas:
1. Do not use naked flames, do not smoke and do not operate electrical contacts or switches (door bell, lighting, motor, lift etc).
2. Shut off the gas supply.
3. Open the windows.
4. Report any leaks immediately.
5. Evacuate the property.
6. Contact a qualified installer.
Danger If you smell flue gases:
1. Switch the boiler off.
2. Open the windows.
3. Report any leaks immediately.
4. Evacuate the property.
5. Contact a qualified installer.
Warning Do not touch the flue gas pipes. Depending on the boiler settings, the temperature of the flue gas pipes can rise to over 60°C.
1 Safety
6 123157 - v.07 - 10082015
Page 7
Warning Do not touch radiators for long periods. Depending on the boiler settings, the temperature of the radiators can rise to over 60°C.
Caution Ensure that the boiler is regularly serviced. Contact a qualified installer or arrange a maintenance contract for the servicing of the boiler.
Caution Only genuine spare parts may be used.
Note Regularly check for the presence of water and pres sure in the heating installation.
1.2 Recommendations
Danger This appliance must not be used by people (and chil dren) with a physical, sensory or mental disability, or by people with a lack of technical experience, unless they are supervised by someone who can assure their safety, or they have been instructed in the correct use of the appliance. Do not allow children to play with the appliance.
Warning Installation and maintenance of the boiler must be car ried out by a qualified installer in accordance with lo cal and national regulations.
Warning Removal and disposal of the boiler must be carried out by a qualified installer in accordance with local and national regulations.
Warning If the mains lead is damaged, it must be replaced by the original manufacturer, the manufacturer's dealer or another suitably skilled person to prevent hazard ous situations from arising.
Warning Always disconnect the mains supply and close the main gas tap when working on the boiler.
Warning Check the entire system for leaks after maintenance and servicing work.
1 Safety
123157 - v.07 - 10082015 7
Page 8
Caution
Make sure the boiler can be reached at all times. The boiler must be installed in a frost-free area. If the power cord is permanently connected, you must always install a main bipolar switch with an opening gap of at least 3 mm (EN 60335-1). Drain the boiler and central heating system if you are not going to use your home for a long time and there is a chance of frost. The frost protection does not work if the boiler is out of operation. The boiler protection only protects the boiler, not the system. Check the water pressure in the system regularly. If the water pressure is lower than 0.8 bar, the system must be topped up (recommended water pressure between 1.5 and 2 bar)
.
Note Keep this document near to the boiler.
Note Casing panels may only be removed for maintenance and servicing purposes. Refit all panels when mainte nance work and servicing are complete.
Note Instruction and warning labels must never be removed or covered and must be clearly legible throughout the entire service life of the boiler. Replace damaged or il legible instruction and warning labels immediately.
Note Modifications to the boiler require the written approval of Remeha.
1.3 Liabilities
1.3.1 Manufacturer's liability
Our products are manufactured in compliance with the re quirements of the various Directives applicable. They are therefore delivered with the marking and any documents necessary. In the interests of the quality of our products, we strive constantly to improve them. We therefore reserve the right to modify the specifications given in this document.
Our liability as manufacturer may not be invoked in the fol lowing cases:
Failure to abide by the instructions on installing the appli ance. Failure to abide by the instructions on using the appliance. Faulty or insufficient maintenance of the appliance.
1 Safety
8 123157 - v.07 - 10082015
Page 9
1.3.2
Installer's liability
The installer is responsible for the installation and initial com missioning of the appliance. The installer must abide by the following instructions:
Read and follow the instructions given in the manuals pro vided with the appliance. Install the appliance in compliance with prevailing legisla tion and standards. Carry out initial commissioning and any checks necessary. Explain the installation to the user. If maintenance is necessary, warn the user of the obliga tion to check the appliance and keep it in good working or der. Give all the instruction manuals to the user.
1.3.3
User's liability
To guarantee optimum operation of the system, you must abide by the following instructions:
Read and follow the instructions given in the manuals pro vided with the appliance. Call on a qualified professional to carry out installation and initial commissioning. Get your installer to explain your installation to you. Have the required inspections and maintenance carried out by a qualified installer. Keep the instruction manuals in good condition close to the appliance.
1 Safety
123157 - v.07 - 10082015 9
Page 10
2 About this manual
2.1 Symbols used
2.1.1 Symbols used in the manual
This manual uses various danger levels to draw attention to special in structions. We do this to improve user safety, to prevent problems and to guarantee correct operation of the appliance.
Danger Risk of dangerous situations that may result in serious personal injury.
Danger of electric shock Risk of electric shock.
Warning Risk of dangerous situations that may result in minor personal in jury.
Caution Risk of material damage.
Note Please note: important information.
See Reference to other manuals or pages in this manual.
2.2 Afkortingen
DHW Domestic hot water PCU PCB for managing burner operation PWM Pulse wide modulation SCU Control panel PCB SU Safety PCB
2 About this manual
10 123157 - v.07 - 10082015
Page 11
3 Technical specifications
3.1 Homologations
3.1.1 Certifications
Tab.1 Certifications
CE identification number PIN 0063CL3333
NOx class 5 (EN 15502–1)
Type of connection B23, B
23P
, B
33
C13, C33, C43, C53, C63, C83, C
93
3.1.2 Unit categories
Category Gas type Connection pressure
(mbar)
II
2H3B/P
G20 (H gas) G30/G31 (butane/ propane)
20 30-50
3.1.3 Directives
In addition to the legal requirements and guidelines, the supplementary guidelines in this manual must also be followed.
Supplements or subsequent regulations and guidelines that are valid at the time of installation shall apply to all regulations and guidelines speci fied in this manual.
3.1.4 Factory test
Before leaving the factory, each boiler is optimally set and tested for:
Electrical safety. Adjustment of (O2/CO2).
Water tightness. Gas tightness. Parameter setting.
3.2
Technical data
Tab.2 General
Quinta Pro 30 45 65 90 115
Nominal output (Pn) Central heating operation (80°C/ 60°C)
min–max
(1)
kW 8.0 - 29.8
29.8
8.0 - 40.8
40.8
12.0 - 61.5
61.5
14.1 - 84.2
84.2
20.5 -
107.0
107.0
Nominal output (Pn) Central heating operation (50°C/ 30°C)
min–max
(1)
kW 8.9 - 31.4
31.4
8.9 - 43.0
43.0
13.3 - 65.0
65.0
15.8 - 89.5
89.5
22.7 -
114.0
114.0
Nominal input (Qn) Central heating operation (Hi)
min-max
(1)
kW 8.2 - 30.0
30.0
8.2 - 41.2
41.2
12.2 - 62.0
62.0
14.6 - 86.0
86.0
19.6 -
110.2
110.2
Nominal input (Qn) CH operation (Hi) G31 (propane)
min kW 8.8 8.8 12.2 22.1 21.2
3 Technical specifications
123157 - v.07 - 10082015 11
Page 12
Quinta Pro 30 45 65 90 115
Nominal input (Qn) Central heating operation (Hs)
min-max
(1)
kW 9.1 - 33.3
33.3
9.1 - 45.7
45.7
13.6 - 68.8
68.8
16.2 - 95.5
95.5
21.9 -
122.4
122.4
Full load central heating efficiency (Hi) (80/60°C) (92/42/EEC)
% 99.4 99.1 99.2 97.9 97.1
Full load central heating efficiency (Hi) (50°C/30°C)
% 102.9 102.9 104.6 104.1 102.5
Low load central heating efficiency (Hi) (return temperature 60°C)
% 97.5 97.5 98.3 96.6 96.5
Part load central heating efficiency (92/42/EEC) (return temperature 30°C)
% 110.4 110.6 110.4 108.1 108.0
(1) Factory setting
Tab.3 Gas and flue gas data
Quinta Pro 30 45 65 90 115
Gas inlet pressure G20 (H gas) min-max mbar 17 - 25 17 - 25 17 - 25 17 - 25 17 - 25
Gas inlet pressure G31 (propane) min-max mbar 37 - 50 37 - 50 37 - 50 37 - 50 37 - 50
Gas consumption G20 (H gas)
(1)
min.– max.
m3/h
0.9 - 3.2 0.9 - 4.4 1.3 - 6.6 1.5 - 9.1 2.0 - 11.7
Gas consumption G31 (propane)
(2)
min-max
m3/h
0.4 - 1.2 0.4 - 1.7 0.5 - 2.5 0.9 - 3.5 0.9 - 4.5
Gas resistance between boiler con nection and measurement point on the gas valve unit G20 (H gas)
0.5 1.0 2.0 2.5 3.0
BREAM NOx mg/kWh 37 37 32 29 35
Flue gas quantity min-max kg/h
g/s
14 - 50
4.1 - 15.1
14 - 69
4.1 - 20.7
21 - 104
5.9 - 30.1
28 - 138
6.5 - 39.5
36 - 178
8.0 - 52.8
Flue gas temperature min-max °C 30 - 65 30 - 67 30 - 68 30 - 68 30 - 72
Maximum counter pressure Pa 70 150 100 160 220
(1) Gas consumption based on lower heating value under standard conditions: T=288.15 K, p=1013.25 mbar. Gag 30.33; G25 29.25; G31
88.00 MJ/m3
Tab.4 Central heating circuit data
Quinta Pro 30 45 65 90 115
Water content l 4.3 4.3 6.4 9.4 9.4
Water operating pressure min bar 0.8 0.8 0.8 0.8 0.8
Water operating pressure (PMS) max bar 4.0 4.0 4.0 4.0 4.0
Water temperature max °C 110.0 110.0 110.0 110.0 110.0
Operating temperature max °C 90.0 90.0 90.0 90.0 90.0
Hydraulic resistance (ΔT=20K) mbar 70 90 130 140 250
Tab.5 Electrical data
Quinta Pro 30 45 65 90 115
Supply voltage VAC 230 230 230 230 230
Power consumption – full load max W 39 68 88 125 199
Power consumption - low load max W 18 18 23 20 45
Power consumption - standby max W 5 5 6 4 7
Electrical protection index
(1)
IP
X4D
(3)
X4D
(3)
X4D
(3)
X4D
(3)
X4D
(3)
3 Technical specifications
12 123157 - v.07 - 10082015
Page 13
Quinta Pro 30 45 65 90 115
Fuses Main
PCU
A 6.3
2.0
6.3
2.0
6.3
2.0
6.3
2.0
6.3
2.0
(1) Splashproof; under certain conditions, the boiler may be installed in damp areas, such as bathrooms.
Tab.6 Other data
Quinta Pro 30 45 65 90 115
Total weight (empty) kg 53 53 60 67 68
Minimum mounting weight
(1)
kg 49 49 56 65 65
Average acoustic level at a distance of one metre from the boiler
dB(A) 38 45 45 52 51
(1) Without front panel.
Tab.7 Technical parameters
Quinta Pro 30 45 65 90 115
Condensing boiler Yes Yes Yes Yes Yes
Low-temperature boiler
(1)
No No No No No
B1 boiler No No No No No
Cogeneration space heater No No No No No
Combination heater No No No No No
Rated heat output
Prated
kW 30 41 62 84 107
Useful heat output at nominal heat output and high temperature oper ation
(2)
P
4
kW 29.8 40.8 61.5 84.2 107.0
Useful heat output at 30% of rated heat output and low temperature regime
(5)
P
1
kW 9.9 13.7 20.5 27.9 35.7
Seasonal space heating energy effi ciency
ƞ
s
% 94 95 94 - -
Useful efficiency at rated heat out put and high temperature regime
(6)
ƞ
4
% 89.5 89.3 89.4 88.2 87.5
Useful efficiency at 30% of rated heat output and low temperature regime
(5)
ƞ
1
% 99.5 99.6 99.5 97.4 97.3
Auxiliary electricity consumption
Full load
elmax
kW 0.039 0.068 0.088 0.125 0.199
Part load
elmin
kW 0.018 0.018 0.023 0.020 0.045
Standby mode
P
SB
kW 0.005 0.005 0.006 0.004 0.007
Other items
Standby heat loss
P
stby
kW 0.101 0.101 0.110 0.123 0.123
Ignition burner power consumption
P
ign
kW - - - - -
Annual energy consumption
Q
HE
GJ 91 124 187 - -
Sound power level, indoors
L
WA
dB 46 53 53 60 59
Emissions of nitrogen oxides NO
X
mg/kWh 32 33 29 41 41
(1) Low temperature means 30°C for condensing boilers, 37°C for low temperature boilers and 50°C (at heater inlet) for other heating appli
ances.
(2) High temperature operation means 60°C return temperature at heater inlet and 80°C feed temperature at heater outlet.
See The back cover for contact details.
3 Technical specifications
123157 - v.07 - 10082015 13
Page 14
3.3 Dimensions and connections
Fig.1 Dimensions
AD-0000017-01
191
500
750
500
100
50
50
130
191
365
Flue gas outlet connection:
Ø 80 mm (≤ 45 kW) Ø 100 mm (≥ 65 kW)
Air supply connection:
Ø 125 mm (≤ 45 kW) Ø 150 mm (≥ 65 kW)
Siphon connection, 32 mm CH supply connection; 1 ¼ inch male thread CH return connection; 1 ¼ inch male thread Gas connection; ¾ inch male thread
3 Technical specifications
14 123157 - v.07 - 10082015
Page 15
3.4 Electrical diagram
Fig.2 Electrical diagram
AD-0000062-01
X1
X14
X13
X12
X3
X2
X4
X5
X6
X7
X8
X9
X10
X11
X13
1
X6
1 2 3
GN/ YW
WH
BL
153
X21
X8
1 2 3
BR
BL
GN/ YW
2 1 3
X81
3 1 2
X11
1 2 3 4 5 6
WH
GY
OR
RD
GN
YW
X5
2 3 4 1
BK
BL
GN/ YW
GY
1 23
X51
12 13
BK
BK
1 2
X116
9
RD
1
BK
1
2 2
X115
8
BL
1
2
X114
10 11
BK
BK
3 1
X112
2 3
X10
4 5 7 6
X111
BK
BK
BK
BK
1 2 3 4
X9
2 3 4 5
X91
BK
BK
BK
BK
1 2 4 5
1
BK
BK
1
2
X117
X4
1 2 3
X41
BR
BL
GN/ YW
3 1 2
230V, 50Hz
LN
X2
1 32
BL
BR
GN/ YW
2 31
K1
X1
1 32
BR
BL
4
X14
1 10
1 10
X3
4 3 2 15
BR
BL
BR
BL
GN/ YW
3 1
4 2
X51
X12
3 4 5 61 2 7 8
9 1 0
GN/ YW
GN/ YW
1 2 3
4 7
8
13 14
15 16 17
18 19
121110
4
5
6
2
9
1
Power supply (P)
2
Extended PCB (SCU)
3
On/off switch (S)
4
Fan (FAN)
5
Ignition transformer (IT)
6
Ignition pin (E)
7
Gas combination block (GB)
8
Circulating pump (pump A)
9
High limit switch (HLS)
10
Return sensor (RTS)
11
Flow sensor (FTS)
12
Pressure switch (PS)
13
Storage parameter (PSU)
14
Circulating pump (PWM pump)
15
Thermostat (OT)
16
Outside sensor (OS)
17
Calorifier sensor (WS)
18
Computer connection (PC)
19
Display (DIS)
3 Technical specifications
123157 - v.07 - 10082015 15
Page 16
4 Description of the product
4.1 General description
The Quinta Pro boiler has the following characteristics:
High-efficiency heating. Limited emissions of polluted substances. Ideal choice for cascade configurations. Option to produce domestic hot water using a separate hot water appli ance.
4.2
Operating principle
4.2.1 Circulating pump
The boiler is supplied without a pump. Take the boiler resistance and sys tem resistance into account when selecting a pump.
Caution The pump may have a maximum input of 200 W. Use an auxiliary relay for a pump with greater power.
See Technical data, page 11
If possible, install the pump directly under the boiler on the return connec tion.
For more information, see Connecting the heating circuit, page 22
4.2.2 Cascade system
The boiler is ideally suited for a cascade system. There are a number of standard solutions available.
Note Contact us for more information.
4.2.3
Water flow
The modulating control of the boiler limits the maximum temperature differ ence between the flow and return and the maximum rise velocity of the flow temperature. As a result, the boiler is virtually unaffected by low water
flow. In all cases, maintain a minimum water flow of 0.4 m3/h. If progres sive calorifier control is activated with parameter , then maintain a
minimum water flow of 0.8 m
3
/h.
4.2.4
Calorifier connection
A calorifier can be connected to the boiler. Our range includes various cal orifiers.
Note Contact us for more information.
Connect the calorifier to the boiler with a calorifier pump. A three-way valve is not suitable due to the hydraulic resistance. An optional PCB is re quired to connect a calorifier pump.
4 Description of the product
16 123157 - v.07 - 10082015
Page 17
4.3 Main components
1
Flue gas outlet/air supply
2
Casing/air box
3
Heat exchanger (CH)
4
Flue gas measuring point
5
Ionisation/ignition electrode
6
Mixer tube
7
Combined gas valve unit
8
Air intake silencer
9
Instrument box
10
Siphon
11
Housing for PCBs
12
Fan
13
Water flow pipe
4.4 Control panel description
4.4.1
What each key means
1
Display
2
Escape or key
3
CH temperature or key
4
DHW temperature or key
5
Enter or Cancel key lockout
6
Chimney-sweeping keys
Press the 2 and 3 keys simultaneously.
7
Menu keys
Press the 4 and 5 keys simultaneously.
8
On/off switch
4.4.2
Meaning of the symbols on the display
Tab.8 Symbols on the display
Information menu: Read out various current values.
Chimney-sweeping position: Forced high or low load for O2/CO2 measurement.
User menu: Parameters at user level can be changed.
Central heating function off: The heating function is deactivated.
Manual mode: Boiler is set to manual mode.
DHW function off: The DHW function is switched off.
Service menu: Parameters at installer level can be changed.
ECO setting: The economy setting is activated.
Fault: Boiler indicates a fault. This can be seen from the code and red display.
Fig.3 Main components
AD-0000011-01
8
7
4
5
5 6
2
1
3
9
11 10
12
13
Fig.4 Control panel
AD-0000065-01
1
2 3 4 5 8
6 7
4 Description of the product
123157 - v.07 - 10082015 17
Page 18
Frost protection: Boiler is running in frost protection mode.
Hour counter menu: Read out the operating hours, number of successful starts and hours on mains supply.
On/off switch: After 5 lockouts, the boiler must be switched off/on again.
Circulating pump: The pump is running.
CH function: Access to CH temperature parameter.
DHW function: Access to DHW temperature parameter.
Yellow display with the symbols: + + (maintenance message).
Water pressure: The water pressure is too low.
Battery symbol: Status of battery in wireless controller.
Signal strength symbol: Signal strength of the wireless controller.
Burner level: Boiler is running at full or part load.
Key lockout: Key lockout is activated.
4.5
Standard delivery
The delivery includes:
The boiler, with mains lead Suspension bracket and fasteners for wall mounting Mounting template Connection cable for pump (Quinta Pro 90/115)
Documentation This manual only deals with the standard scope of supply. For the installa tion or mounting of any accessories delivered with the boiler, refer to the corresponding mounting instructions.
4.6 Accessories and options
Various accessories can be obtained for the boiler.
Note Contact us for more information.
4 Description of the product
18 123157 - v.07 - 10082015
Page 19
5 Before installation
5.1 Installation regulations
Warning The installer must be registered with Gas Safe and have the cor rect ACS qualifications.
Note Practical guidelines - see the latest version.
5.2
Choice of the location
5.2.1 Type plate
The type plate on top of the boiler features the boiler serial number and important boiler specifications, for example the model and unit category. The dF and dU codes are also stated on the type plate.
Fig.5
Position of type plate
AD-0000013-01
5 Before installation
123157 - v.07 - 10082015 19
Page 20
5.2.2 Boiler position
Use the guidelines and the required installation space as a basis for de
termining the correct place to install the boiler.
When determining the correct installation space, take account of the
permitted position of the flue gas discharge and/or air supply outlet.
Ensure that there is sufficient space around the boiler for good access
and ease of maintenance.
Danger It is forbidden to store, even temporarily, combustible products and substances in the boiler or near the boiler.
Warning
Fix the appliance to a solid wall capable of bearing the weight of the boiler when full of water and fully equipped.
Caution
The boiler must be installed in a frost-free area. The boiler must have an earthed electrical connection. A connection to the sewer must be present for the condensate drain close to the boiler.
5.3
Ventilation
The installation must comply with BS 5540 (part 1 + 2), BS 6640 and IGUP/10.
Fig.6 Installation area
AD-0000014-01
500
min.1000
500
min. 400
350
min. 250
750
5 Before installation
20 123157 - v.07 - 10082015
Page 21
6 Installation
6.1 General
Warning The boiler must be installed by a qualified installer in accordance with local and national regulations.
6.2
Preparation
6.2.1
Positioning the boiler
The fitting bracket on the back of the casing can be used to mount the boiler directly on the suspension bracket.
The boiler is supplied with a mounting template.
1. Attach the mounting template of the boiler to the wall using adhesive tape.
Warning
Use a level to check whether the mounting template is hanging perfectly horizontally. Protect the boiler against building dust and cover the connection points for the flue gas outlet and air supply. Only remove this cover to assemble the relevant connections.
2. Drill 2 holes of Ø 10 mm.
Note The extra holes are intended for use in the event that one of the two fastening holes is not suitable for correct fastening of the plug.
3. Fit the Ø 10 mm plugs.
4. Attach the suspension bracket to the wall with the Ø 10 mm bolts supplied.
5. Mount the boiler on the suspension bracket.
6.3
Water connections
6.3.1 Rinsing the system
The installation must be cleaned and flushed in accordance with BS 7593 (2006).
Before a new CH boiler can be connected to an existing or new installa tion, the entire installation must be thoroughly cleaned and flushed. This
Fig.7 Mounting the boiler
AD-0000018-01
2
1
5
4
3
6 Installation
123157 - v.07 - 10082015 21
Page 22
step is absolutely crucial. The flushing helps to remove residue from the installation process (weld slag, fixing products etc.) and accumulations of dirt (silt, mud etc.)
Note Flush the CH installation with a volume of water equivalent to at least three times the volume of the CH installation. Flush the DHW pipes with at least 20 times the volume of the pipes.
Note Due to the presence of an aluminium heat exchanger, suitable chemicals and the correct use of these chemicals should be dis cussed with specialist water treatment companies.
6.3.2 Connecting the heating circuit
1. Remove the dust cap from the CH flow connection at the bot tom of the boiler.
2. Fit the outlet pipe for CH water to the CH flow connection.
3. For filling and tapping the boiler, install a filling and drain valve in the system.
4. Remove the dust cap from the CH return connection at the bot tom of the boiler.
5. Fit the inlet pipe for CH water to the CH return connection.
6. Install the pump in the CH return pipe (if applicable).
See For the pump's electrical connection: Connecting the pump, page 31
Note Fit a service shut-off valve in the CH flow pipe and the CH return pipe to facilitate servicing work.
Caution
When fitting service shut-off valves, position the filling and drain valve, the expansion vessel and the safety valve between the shut-off valve and the boiler. Carry out any welding work required at a safe distance from the boiler or before the boiler is fitted. If using synthetic pipes, follow the manufacturer's (connection) instructions. When installing open-vented systems, the cold feed and expan sion tank heights must comply with the requirements laid down in the Health and Safety Executive publication PM5. The Quinta Pro boilers require a minimum static height of 3 m (Quinta Pro 30/45/65/90) or 5 m (Quinta Pro 115).
6.3.3 Connecting the expansion vessel
1. Ensure that there is an expansion vessel with the correct volume and inlet pressure.
2. Fit the expansion vessel on the central heating return pipe
Fig.8 Connecting the CH flow
AD-0000022-01
Fig.9 Connecting the CH return
AD-0000023-01
6 Installation
22 123157 - v.07 - 10082015
Page 23
6.3.4 Connecting the condensate discharge pipe
1. Fit a plastic drain pipe of Ø 32 mm or larger, terminating in the drain.
2. Insert the flexible condensate drain hose into the pipe.
3. Fit a stench-trap or siphon in the drain pipe.
Danger The siphon must always be filled with water. This prevents flue gases from entering the room.
Caution
Never seal the condensate drain. The drain pipe must slope down at least 30 mm per metre, the maximum horizontal length is 5 metres. Condensed water must not be discharged into a gutter.
6.4 Gas connection
Warning
Before starting work on the gas pipes, turn off the main gas tap. Before installing, check that the gas meter has sufficient capaci ty. Take into account the consumption of all appliances. Notify the local energy company if the gas meter has insufficient capacity.
1. Remove the dust cap from the gas supply pipe at the bottom of the boiler.
2. Fit the gas supply pipe.
3. Fit a gas tap in this pipe, directly underneath the boiler.
4. Fit the gas pipe to the gas tap.
Caution
Remove dirt and dust from the gas pipe. Always perform welding work at a sufficient distance from the boiler. Place a gas filter to prevent pollution of the gas valve unit.
6.5
Air supply/flue gas connections
The boiler is suitable for the following types of flue gas connections:
For more information, see Certifications, page 11
6.5.1 Classification
This classification is specified in more detail in the table in accordance with .
Tab.9 Types of flue gas connections
Type Version Description
B
23
B
23P
(1)
Open Without down-draught diverter.
Flue gas discharge via the roof. Air from the installation area.
Fig.10 Connecting the condensate dis
charge pipe
AD-0000024-01
Fig.11 Connecting the gas pipe
AD-0000025-01
6 Installation
123157 - v.07 - 10082015 23
Page 24
Type Version Description
B
33
Open Without down-draught diverter.
Common flue gas discharge via the roof (depression). Flue gas discharge rinsed with air, air from the installation area (special construction).
C
13
Closed Discharge in the outside wall.
Inlet opening for the air supply is in the same pressure zone as the discharge (e.g. a combined outside wall feed-through).
C
33
Closed Flue gas discharge via the roof.
Inlet opening for the air supply is in the same pressure zone as the discharge (e.g. a concentric roof feed-through).
C
43
(2)
Closed/cascade Joint air supply and flue gas discharge duct (CLV system):
Concentric (preferably). Parallel (if concentric is not possible).
Overpressure cascade
C
53
Closed Closed unit.
Separate air supply duct. Separate flue gas discharge duct. Discharging into various pressure areas.
C
63
Closed This type of unit is supplied by the manufacturer without a supply and discharge sys
tem.
C
83
(3)
Closed The appliance can be connected to what is known as a semi-CLV system (common flue
gas outlet and individual air supply).
C
93
(4)
Closed Air supply and flue gas discharge duct in shaft or ducted:
Concentric. Air supply from existing duct. Flue gas discharge via the roof. Inlet opening for the air supply is in the same pressure zone as the discharge.
(1) Also pressure class P1 (2) EN 15502-2-1: 0.5 mbar suction due to depression (3) 4 mbar depression can occur (4) See table for minimum dimensions of shaft or duct
Shaft dimensions
Fig.12
Minimum dimensions of shaft or duct
AD-3000330-01
□
D
Ø
D
Tab.10 Minimum dimensions of shaft or duct
Type Version Diameter (D) Without air supply With air supply
Ø duct □ duct Ø duct □ duct
C
93
Rigid 60 mm 110 mm 110 x 110 mm 120 mm 110 x 110 mm
80 mm 130 mm 130 x 130 mm 140 mm 130 x 130 mm
100 mm 160 mm 160 x 160 mm 170 mm 160 x 160 mm
C
93
Flexible 60 mm 110 mm 110 x 110 mm 120 mm 110 x 110 mm
80 mm 130 mm 130 x 130 mm 145 mm 130 x 130 mm
100 mm 160 mm 160 x 160 mm 170 mm 160 x 160 mm
6 Installation
24 123157 - v.07 - 10082015
Page 25
Type Version Diameter (D) Without air supply With air supply
Ø duct □ duct Ø duct □ duct
C
93
Concentric 60/100 mm 120 mm 120 x 120 mm 120 mm 120 x 120 mm
80/125 mm 145 mm 145 x 145 mm 145 mm 145 x 145 mm
100/150 mm 170 mm 170 x 170 mm 170 mm 170 x 170 mm
6.5.2 Outlets
Drain systems (roof feed-through and outside wall feed-through) must be supplied by the following manufacturers:
Centrotherm Cox Geelen Muelink & Grol Natalini Poujoulat Ubbink
Note Where regulations stipulate that a wire grille must be fitted, use a suitable grille made from stainless steel.
Boiler-specific roof and outside wall feed-through kits are also available.
Note Contact us for more information.
6.5.3 Material
Warning
The coupling and connection methods may vary depending on the manufacturer. It is not permitted to combine pipes, coupling and connection methods from different manufacturers. The materials used must comply with the prevailing regulations and standards.
Tab.11 Flue gas outlet pipework materials
Design
(1)
Material
(2)
Single-wall, rigid Thick-walled, aluminium
Plastic T120 Stainless steel
Flexible Plastic T120
Stainless steel
(1) The sealing must conform to pressure class 1 (2) With CE marking
Tab.12 Air supply pipework materials
Version Material
Single-wall, rigid Aluminium
Plastic Stainless steel
Flexible Aluminium
Plastic Stainless steel
6 Installation
123157 - v.07 - 10082015 25
Page 26
6.5.4 Length of the air and flue gas pipes
Note
When using bends, the maximum chimney length (L) must be shortened according to the reduction table. The boiler is also suitable for longer chimney lengths and diam eters other than those specified in the tables. Contact us for more information.
Room-ventilated version (B23, B23P, B33)
Flue gas outlet connection
Air supply connection With a room-ventilated version, the air supply opening stays open; only the flue gas outlet opening is connected. This will ensure that the boiler ob tains the necessary combustion air directly from the installation area.
Caution
The air supply opening must stay open. The installation area must be equipped with the necessary air supply openings. These openings must not be obstructed or shut off.
Tab.13 Maximum chimney length (L)
Quinta Pro Diameter
80 mm 90 mm 100 mm 110 mm
30 40 m 40 m 40 m 40 m
45 33 m 40 m 40 m 40 m
65 10 m 18 m 27 m 40 m
90 9 m 16 m 24 m 40 m
115 8 m 12 m 19 m 37 m
Room-sealed version (C13, C33, C43, C63, C93)
Flue gas outlet connection
Air supply connection With a closed version, both the flue gas outlet and the air supply openings are connected (concentrically).
Tab.14 Maximum chimney length (L)
Quinta Pro Diameter
80–125 mm 100–150 mm
30 20 m 20 m
45 16 m 20 m
65 - 13 m
90 - 13 m
115 - 7 m
Fig.13 Room-ventilated version
AD-0000028-01
L
=
Fig.14 Room-sealed version (concentric)
AD-0000029-01
L
=
6 Installation
26 123157 - v.07 - 10082015
Page 27
Connection in different pressure areas (C53, C83)
Flue gas outlet connection
Air supply connection A 100/100 mm flue gas adapter (accessory) must be fitted for this connec tion.
Combustion air supply and flue gas discharge are possible in different pressure areas and semi-CLV systems, with the exception of the coastal area. The maximum permitted height difference between the combustion air supply and the flue gas outlet is 36 m.
Tab.15 Maximum chimney length (L) in the various pressure zones
Quinta Pro Diameter
80 mm 90 mm 100 mm 110 mm 130 mm
30 20 m 36 m 36 m 36 m 36 m
45 20 m 36 m 36 m 36 m 36 m
65 - 2 m 8 m 34 m 36 m
90 - - 4 m 32 m 36 m
115 - - - 24 m 36 m
Reduction table
Tab.16 Pipe reduction for each element used (parallel)
Diameter
Pipe reduction
45° bend 90° bend
60 mm 0.9 m 3.1 m
70 mm 1.1 m 3.5 m
80 mm 1.2 m 4.0 m
90 mm 1.3 m 4.5 m
100 mm 1.4 m 4.9 m
110 mm 1.5 m 5.4 m
130 mm 1.6 m 6.2 m
Tab.17 Pipe reduction for each element used (concentric)
Diameter
Pipe reduction
45° bend 90° bend
60–100 mm 1 m 2 m
80–125 mm 1 m 2 m
100–150 mm 1 m 2 m
6.5.5
Additional guidelines
For installing the flue gas outlet and air supply materials, refer to the in structions of the manufacturer of the relevant material. If the flue gas outlet and air supply materials are not installed in accordance with the instructions (e.g. not leakproof, not properly bracketed), this can result in dangerous situations and/or physical injury. After installation, check at least all flue gas outlet and air supply parts for tightness. Direct connection of the flue gas outlet to structural ducts is not permit ted because of condensation. Always clean shafts thoroughly when using lining pipes and/or an air supply connection. It must be possible to inspect the lining duct.
Fig.15
Different pressure areas
AD-0000030-01
L
=
+
6 Installation
123157 - v.07 - 10082015 27
Page 28
If condensate from a plastic or stainless steel pipe section can flow back to an aluminium part in the flue gas outlet, this condensate must be dis charged via a collector before it reaches the aluminium. With longer lengths of aluminium flue gas outlet pipes, relatively large quantities of corrosion products flowing back out of the outlet pipes to gether with the condensate must be taken into account the first time. Clean the siphon of the appliance regularly or install an extra conden sate collector above the unit. Make sure that the flue gas outlet pipe towards the boiler has a sufficient gradient (at least 50 mm per metre) and that there is a sufficient conden sate collector and discharge (at least 1 m before the outlet of the boiler). The bends used must be larger than 90° to guarantee the gradient and a good seal on the lip rings.
Note Contact us for more information.
6.5.6 Connecting the flue gas outlet and air supply
S Insertion depth 25 mm
Assembly
1. Fit the flue gas outlet pipe and the air supply pipe to the boiler.
2. Fit the successive flue gas outlet pipes and air supply pipes seam lessly together.
Caution
The pipes must not be resting on the boiler. Fit the horizontal parts sloping down towards the boiler, with a gradient of 50 mm per metre.
6.6 Electrical connections
6.6.1 Control unit
The table gives important connection values for the control unit.
Tab.18 Connection values for control unit
Supply voltage 230 VAC/50 Hz
Main fuse value F1 (230 VAC) 6.3 AT
Fuse value F2 (230 VAC) 2 AT
Fan 230 VAC
Danger of electric shock The following components of the boiler are connected to a 230 V power supply:
Electrical connection to circulating pump. Electrical connection to gas combination block. Electrical connection to fan. Control unit. Ignition transformer. Power supply cable connection.
The boiler has a three-wire mains lead (lead length 1.5 m) and is suitable for a 230 VAC/50 Hz power supply with a phase/neutral/earth system. The boiler is not phase sensitive. The power supply cable is connected to the X1 connector. A spare fuse can be found in the housing of the control unit.
Fig.16 Connecting the flue gas outlet and
air supply
AD-0000034-01
80/125 mm
100/150 mm
S
6 Installation
28 123157 - v.07 - 10082015
Page 29
Caution
Always order a replacement mains lead from Remeha. The power supply cable should only be replaced by Remeha, or by an installer certified by Remeha. The boiler switch must be easily accessible at all times.
The boiler has several control, protection and regulation connection op tions. The standard PCB can be extended with optional PCBs.
For more information, see Optional electrical connections, page 82
6.6.2
Recommendations
Warning
Electrical connections must always be made with the power supply disconnected and only by qualified installers. The boiler is completely pre-wired. Never change the internal connections of the control panel. Make sure you establish an earth connection before connecting the electricity.
Establish the electrical connections in accordance with:
The instructions of the current standards. The instructions of the wiring diagrams supplied with the boiler. The recommendations in this manual.
6 Installation
123157 - v.07 - 10082015 29
Page 30
Caution Separate the sensor cables from the 230 V cables.
6.6.3
Access to the connectors
Various thermostats and regulators can be connected to the standard PCB (PCU) (connector X12).
Access to the connectors:
1. Unscrew the two screws located under the front housing by a quar ter turn and remove the front housing.
2. Guide the cables from the regulator or the thermostat through the round grommet(s) on the right-hand side of the boiler bottom plate.
3. Tilt the instrument box forwards by opening the clips on the sides.
4. Open the instrument box by opening the clip on the front.
5. Guide the relevant connection cable(s) through the instrument box via the grommet(s) provided.
6. Unscrew the strain relief clamps as required (in front of the connec tor) and guide the cables underneath.
7. Connect the cables to the appropriate terminals on the connector.
8. Screw the strain relief clamps securely into position and close the control panel.
Fig.17 Access to the connectors
AD-3000075-01
OT
On/off
Tou
t
T
dh
w
BL
RL
X13
X12
7
4
4
3
3
3
1
90º
1
6 Installation
30 123157 - v.07 - 10082015
Page 31
6.6.4 Connection options for the standard PCB
Connecting the PWM pump
The energy-efficient modulating pump must be connected to the standard PCB of the PCU. Proceed as follows:
1. Connect the power supply cable and the cable for the PWM signal to the pump.
2. Remove the grommet from the opening in the middle of the base of the boiler.
3. Pass the pump power supply cable through the base of the boiler and seal the opening by tightening the bayonet fitting to the cable.
4. Pass the PWM cable from the pump through one of the grommets on the right in the base of the boiler.
5. Connect the pump power supply cable to the cable in the instrument box that is connected with connector X8.
6. Connect the pump PWM cable to the cable in the instrument box that is connected with connector X10.
7. Add the pump cables to the cable bundles by opening and closing the cable bundle bands.
Fig.18 Connecting the power supply cable
AD-0000038-01
2
3
X81
X116a
4
X120
1
X10
X8
X81
X81
PWM
5
6
7
6 Installation
123157 - v.07 - 10082015 31
Page 32
Connecting the pump
The pump must be connected to the standard PCB of the PCU. Proceed as follows:
1. Connect the cable supplied with the boiler to the pump.
2. Remove the grommet from the opening in the middle of the base of the boiler.
3. Pass the pump cable through the base of the boiler and seal the opening by tightening the bayonet fitting to the cable.
4. Connect the pump cable to the cable in the instrument box that is connected with connector X8.
5. Add the pump cable to the cable bundles by opening and closing the cable bundle bands.
Fig.19 Connecting the power supply cable
AD-0000043-01
5
X8
X81
X81
2
3
X81
1
4
6 Installation
32 123157 - v.07 - 10082015
Page 33
Connecting modulating thermostat
OT OpenTherm thermostat
The boiler is fitted with an OpenTherm connection as standard. As a re sult, modulating OpenTherm thermostats (room-temperature, weather­compensated and cascade thermostats) can be connected without further modifications. The boiler is also suitable for OpenTherm Smart Power.
1. In the case of a room thermostat: install the thermostat in a refer ence room.
2. Connect the two-wire cable of the thermostat to the On/Off OT termi nals of the connector. It does not matter which wire is connected to which cable clamp.
Note If the tap water temperature can be set on the OpenTherm ther mostat, the boiler will supply this temperature, with the value set in the boiler as a maximum.
Connecting the on/off thermostat
Tk On/off ambient thermostat
The boiler is suitable for connection to a two-wire on/off ambient thermo stat.
1. Fit the thermostat in a reference room (generally the living room).
2. Connect the two-wire cable of the thermostat to the On/off OT termi nals of the connector. It does not matter which wire is connected to which cable clamp.
3. Connect the power-stealing thermostat to the On/off OT terminals of the connector.
Note If an ambient thermostat with an anticipation element is used, this must be completed via parameter .
Fig.20 Connecting modulating thermostat
AD-0000046-01
On/off
OT BL RL Tout Tdhw
OT
On/off
Tout
Tdhw
BL
RL
OT
Fig.21 Connecting the on/off thermostat
AD-0000047-01
Tk
OT
On/off
Tout
Tdhw
BL
RL
On/off
OT BL RL Tout Tdhw
6 Installation
123157 - v.07 - 10082015 33
Page 34
Frost protection combined with on/off thermostat
When an on/off thermostat is used, the pipes and radiators in a frost-sen sitive room can be protected by a frost thermostat. The radiator valve in the frost-sensitive room must be open.
1. Place a frost thermostat (Tv) in a frost-sensitive room (e.g. a ga rage).
2. Connect the frost thermostat (Tv) parallel to the on/off thermostat (Tk) on the On/Off OT terminals of the connector.
Note When an OpenTherm thermostat is used, it is not possible to con nect a frost thermostat parallel to the On/Off OT terminals. In that case, implement frost protection of the central heating system in combination with an outside sensor.
Frost protection combined with outside sensor
The central heating system can also be protected against frost in combina tion with an outside sensor. The radiator valve in the frost-sensitive room must be open.
1. Connect the outside sensor to the Tout terminals of the connector.
The frost protection works as follows with an outside sensor:
At an outside temperature lower than -10°C (can be set with parameter
): the circulating pump switches on.
At an outside temperature higher than -10°C (can be set with parameter
): the circulating pump continues to run and then switches off.
Connecting an outside sensor
Ba Outside sensor An outside sensor can be connected to the Tout terminals of the connector (accessory). In the event of an on/off thermostat, the boiler will regulate the temperature using the set point of the internal heating curve (F). Vari ous parameter settings can be used to change the internal heating curve.
1. Connect the two-wire cable to the Tout terminals of the connector.
Note An OpenTherm controller can also use this outside sensor. In that case, the required internal heating curve must be set on the con troller.
Fig.22 Connecting the frost thermostat
AD-0000049-01
OT
On/off
Tout
Tdhw
BL
RL
Tk
Tv
On/off
OT BL RL Tout Tdhw
Fig.23 Connecting an outside sensor
AD-0000048-01
Ba
OT
On/off
Tout
Tdhw
BL
RL
On/off
OT BL RL Tout Tdhw
6 Installation
34 123157 - v.07 - 10082015
Page 35
Setting the heating curve
1 2 3 4
F Heating curve If an outside temperature sensor is connected, it is possible to adapt the internal heating curve. The setting can be modified using parameters ,
, and .
Connecting the calorifier sensor/calorifier thermostat
Ws Calorifier sensor
1. Connect the calorifier sensor or calorifier thermostat to the Tdhw ter minals of the connector.
Connecting a PC/laptop
A PC or laptop can be connected to the telephone connector using the op tional Recom interface Using the Recom PC/Laptop service software, you can enter, change and read out various boiler settings.
Fig.24
Heating curve
AD-3000038-01
0 10 20
-20
-10
10
30
70
50
90
F
1
3
4
2
Fig.25 Connecting the calorifier sensor/calo
rifier thermostat
AD-0000050-01
Ws
OT
On/off
Tout
Tdhw
BL
RL
On/off
OT BL RL Tout Tdhw
Fig.26 Connecting a PC/laptop
AD-0000051-01
OT
On/off
Tout
BL
RL
X13
6 Installation
123157 - v.07 - 10082015 35
Page 36
Blocking input
The boiler has a blocking input. This input relates to the BL terminals of the connector.
Warning Only suitable for potential-free contacts.
Note First remove the bridge if this input is used.
The parameter can be used to change the function of the input.
For more information, see Changing the parameters, page 50
Release input
The boiler has a release input. This input relates to the RL terminals of the connector.
Warning Only suitable for potential-free contacts.
The parameter can be used to change the function of the input.
The parameter can be used to change the wait time of the input.
For more information, see Changing the parameters, page 50
6.6.5 PCBs
The PCBs are positioned in the PCB housing.
The following PCBs are already installed in the PCB housing:
IF-01 SCU-S02 SCU-X01
Fig.27
Blocking input
AD-0000052-01
OT
On/off
Tout
Tdhw
BL
RL
On/off
OT BL RL Tout Tdhw
Fig.28 Release input
AD-0000053-01
OT
On/off
Tout
Tdhw
BL
RL
On/off
OT BL RL Tout Tdhw
Fig.29 Open housing for PCBs
AD-3000341-01
2
x3
1
6 Installation
36 123157 - v.07 - 10082015
Page 37
Connection options for the 0–10 V PCB (IF-01)
The IF-01 PCB can be built into the instrument box or the housing for the PCBs. See the instructions provided with the product.
Caution Do not connect a frost thermostat or room thermostat to the boiler if using the 0–10 V PCB.
Connecting the status relay (Nc)
If the boiler locks out, a relay is de-energised and the alarm can be trans mitted via a potential-free contact (maximum 230 V, 1 A) on terminals Nc and C of the connector.
Connection (OTm)
The interface uses OpenTherm to communicate with the boiler control unit. To make this possible, the OTm connection must be connected to the OpenTherm input of the boiler control unit.OTm
Analogue input
A choice can be made with this control between control based on temper ature or heat output. The two controls are described briefly below.
1. Connect the input signal to terminals 0–10 of the connector.
Tab.19 Temperature-based control (°C)
Jumper 2 Input signal (V) Temperature °C Description
0–1.5 0–15 Boiler off
1.5–1.8 15–18 Hysteresis
1.8–10 18–100 Desired temperature
The 0–10 V signal controls the boiler supply temperature. This control modulates on the basis of flow temperature. The output varies between the minimum and maximum value on the basis of the flow temperature set point calculated by the controller.
A jumper (2) on the interface is used to select either temperature-based control ( ) or output-based control (%).
Tab.20 Control based on heat output
Jumper 2 Input signal (V) Heat output (%) Description
%
0–2.0
(1)
0–20 Boiler off
2.0–2.2
(1)
20–22 Hysteresis
2.0–10
(1)
20–100 Desired temperature
(1) Dependent on the minimum modulation depth (set speeds, standard 20%)
The 0–10 V signal controls the boiler output. This control modulates on the basis of the heat output. The minimum output is linked to the boiler's mod ulation depth. The output varies between the minimum and maximum val ue on the basis of the value defined by the controller.
Fig.30
IF-01 PCB
AD-0000054-01
Status 0-10 0-10
Nc NoC
Nc No OTm 0 + 0 +C
OTm 0 + 0 +
X5
X4
X1
IF-01
%
1
2
Fig.31 Switch jumper (2)
AD-0000055-01
1 2
%
2 2
6 Installation
123157 - v.07 - 10082015 37
Page 38
Analogue output (0–10 V)
This feedback can be based on temperature or heat output. The two con trols are described briefly below.
A jumper (1) on the interface is used to select either temperature ( ) or out put (%).
Tab.21 Temperature message
Jumper 1 Output signal (V) Temperature °C Description
0.5 – Alarm
1–10 10–100 Supplied tempera
ture
Tab.22 Output message
Jumper 2 Output signal (V) Heat output (%) Description
%
0 0–15 Boiler off
0.5 15–20 Alarm
2.0–10
(1)
20–100 Supplied heat output
(1) Dependent on the minimum modulation depth (set speeds, standard 20%)
Connection options for the PCB (SCU-S02)
If the boiler is fitted with the PCB (SCU-S02), then this PCB is automatical ly recognised by the boiler's automatic control unit.
Note On removing this PCB, the boiler will show error code . To prevent this error, an auto-detect must be carried out after remov ing this PCB.
For information on carrying out an auto-detect, see: Carrying out an auto­detect, page 53
The status indicator D3 at the top right of the PCB indicates the status:
Continuous signal: PCB working normally Flashing signal: no connection No signal: no power or faulty PCB (check the wiring)
Control of external CH pump (pump)
An external central heating pump can be connected to the pump terminals of the connector. The maximum power consumption is 400 VA.
Control of external three-way valve (3wV)
The external three-way valve (230 VAC) can be used when connecting an indirectly heated calorifier. The neutral position of the three-way valve can be set using parameter .
The three-way valve is connected as follows:
N = neutral C = central heating D = calorifier
Control of external sanitary hot water pump (3wV)
It is also possible to connect an external DHW pump to the terminals 3wV.
Connect the pump as follows:
N = N pump D = L pump
= PE pump
Fig.32
Switch jumper (1)
AD-0000056-01
1 2
%
1 1
Fig.33 SCU-S02 PCB
AD-0000057-01
Status
CNc No C
Nc No
Pump
N L
Pump
N L
EgV
N L
EgV
N L
3wV
X3
SCU-SO2
X1
X4 X5
N C
3wV
N C D
D
X2
D3
Tsol Gps
Tsol Gps
Hru Hru
F 4AT
6 Installation
38 123157 - v.07 - 10082015
Page 39
Caution If the neutral position of the three-way valve is adjusted with pa rameter , the pump must be connected as follows:
N = N pump C = L pomp
= PE pump
Control of external gas valve (EgV)
If there is a heat demand, an alternating voltage of 230 VAC, 1 A (maxi mum) becomes available on the EgV terminals of the connector to control an external gas valve.
Connecting the minimum gas pressure switch (Gps)
The minimum gas pressure switch blocks the boiler if the gas inlet pres sure becomes too low.
1. Connect the minimum gas pressure switch to the Gps terminals of the connector.
The presence of the gas pressure switch must be set using parameter
.
Connecting a heat recovery unit (Hru)
1. Connect the wires from the heat recovery unit to the Hru terminals of the connector.
The presence of the heat recovery unit must be set using parameter
.
Operation signal and error signal (status)
You can choose between an alarm or operation signal using parameter
.
If the boiler is operating, the operation signal can be switched via a po tential-free contact (maximum 230 VAC, 1 A) on the No and C terminals of the connector. If the boiler is locked out, the alarm signal can be transmitted via a po tential-free contact (maximum 230 VAC, 1 A) on the Nc and C terminals of the connector.
Connection options for the PCB (SCU-X01)
The SCU-X01 PCB has two potential-free contacts (status), which can be configured as required. Depending on the setting, a maximum of two mes sages about the status of the boiler can be transmitted. See table. Select the messages required using rotary knobs SW1 and SW2. Use rotary knob SW1 for messages on the status connector X3. Use rotary knob SW2 for messages on the status connector X4.
Tab.23 Configuring the rotary knobs
Position C-NO C-NC
0 Alarm standby Alarm active
1 Alarm inverted active Alarm inverted standby
2 Burning standby Burning active
3 Burning inverted active Burning inverted standby
4 Burning low standby Burning low active
5 Burning high standby Burning high active
6 Maintenance message standbyMaintenance message active
7 CH mode standby CH mode active
8 DHW mode standby DHW mode active
9 CH pump standby CH pump active
Fig.34 SCU-X01 PCB
AD-0000059-01
SCU-X01
X2
X2a
X4
Status
CNc No CNcNo
X3
Status
CNc No CNcNo
SW2SW1
6 Installation
123157 - v.07 - 10082015 39
Page 40
6.7 Filling the system
6.7.1 Water treatment
In many cases, the boiler and central heating system can be filled with normal tap water and water treatment will not be necessary.
Warning Do not add chemical agents to the central heating water without consulting Remeha. For example: antifreeze, water softeners, pH­increasing or lowering agents, chemical additives and/or inhibitors. Such agents can cause errors in the boiler and damage to the heat exchanger.
Note
For untreated water, the pH value of the water in the installation must be between 7 and 9 and for treated water between 7 and
8.5. The maximum hardness of the water in the installation must be between 0.5 and 20.0 °dH (dependent on the total heat output generated). More information is available in our Water quality regulations. Always adhere to the instructions in the aforementioned docu ment.
6.7.2
Filling the siphon
Danger The siphon must always be sufficiently filled with water. This pre vents flue gases from entering the room.
1. Remove the siphon.
2. Fill the siphon up with water.
3. Fit the siphon.
4. Check whether the siphon is firmly fitted in the boiler.
6.7.3 Filling the system
Caution Before filling, open the valves on every radiator in the installation.
Note In order to be able to read off the water pressure from the boiler display, the boiler must be switched on.
1. Fill the central heating system with clean tap water.
Note The recommended water pressure is between 1.5 and 2 bar.
2. Check the water-side connections for tightness.
Fig.35 Filling the siphon
AD-0000064-01
6 Installation
40 123157 - v.07 - 10082015
Page 41
Note After switching on the power and if there is adequate water pres sure, the boiler always runs through an automatic venting program lasting approximately 3 minutes (air may escape via the automatic air vent during filling). If the water pressure is lower than 0.8 bar, the symbol will appear. If the water pressure is too low, top up the CH installation.
Caution
Carry out the filling within 30 minutes to avoid the venting pro gram starting up. That would indeed be undesirable if the boiler is not filled. Switch the boiler off if the CH installation is not be ing topped up immediately. When venting, prevent water from getting into the boiler casing and electrical parts of the boiler.
6 Installation
123157 - v.07 - 10082015 41
Page 42
7 Commissioning
7.1 General
Follow the steps set out in the paragraphs below to put the boiler into op eration.
Warning Do not put the boiler into operation if the supplied gas is not in ac cordance with the approved gas types.
7.2
Gas circuit
Warning Ensure that the boiler is disconnected from the power supply.
1. Open the main gas tap.
2. Open the boiler gas tap.
3. Unscrew the two screws located under the front housing by a quar ter turn and remove the front housing.
4. Tilt the instrument box forwards by opening the clips on the sides.
5. Check the gas inlet pressure at the measuring point C on the gas valve unit.
Warning
The gas pressure measured on measurement point C is the gas inlet pressure at the boiler connection point reduced by the re sistance of the internal gas pipe. See Technical data, page 11 For authorised gas pressures, see: Unit categories, page 11
6. Vent the gas supply pipe by unscrewing the measuring point on the gas valve unit.
7. Tighten the measuring point again when the pipe has been fully ven ted.
8. Check all connections for gas tightness. The test pressure may be a maximum of 60 mbar.
7.3
Hydraulic circuit
1. Check the siphon; it should be fully filled with clean water.
2. Check the water-side connections for tightness.
7.4 Electrical connections
1. Check the electrical connections.
7.5
Commissioning procedure
Warning
Initial commissioning must be done by a qualified professional. If adapting to another gas type i.e. propane, the gas valve unit must be adjusted before switching on the boiler.
See Adaptation to a different gas type, page 43
Note On first firing the boiler, a smell may be present for a short period.
1. Tilt the instrument box upwards again and fasten it using the clips lo cated on the sides.
2. Open the main gas tap.
Fig.36 Gas valve unit measuring points
AD-0000066-01
C C
7 Commissioning
42 123157 - v.07 - 10082015
Page 43
3. Open the boiler gas tap.
4. Insert the boiler plug into an earthed socket.
5. Switch the power on with the boiler's on/off switch.
6. Set the components (thermostats, control) so that heat is deman ded.
7. The start-up program will start and cannot be interrupted. During the start-up cycle, the display shows the following information: A short test where all segments of the display are visible:
: Software version : Parameter version
The version numbers are displayed alternately.
8. A three-minute venting cycle is performed automatically.
Note If a calorifier sensor is connected and the legionella protection function is activated, the boiler starts to heat the water in the DHW tank as soon as the venting programme has been completed.
By pressing the key for a short time, the current operating status is shown on the display:
Tab.24 Operating status
Heat demand Heat demand stopped
: Fan on : Post-ventilation
: Burner ignition : Burner stop
: Post-circulation of the pump
: CH operation : Standby
In addition to , in STAND-BY the display normally shows the water pres sure and the symbols and .
Error during start-up procedure:
No information is shown on the display:
Check the mains supply voltage Check the main fuses Check the fuses on the control unit: (F1 = 6.3 AT, F2 = 2 AT) Check the connection of the mains lead to the connector X1 in the in
strument box An error is indicated on the display by the error symbol and a flashing error code.
The meaning of the error codes can be found in the error table.
Press the key for 3 seconds to restart the boiler.
Note If the ECO setting is on, then the boiler will not ignite for hot tap water production after central heating operation.
7.6
Gas settings
7.6.1 Adaptation to a different gas type
Warning Only a qualified engineer may carry out the following operations.
Before operating with a different type of gas, carry out the following steps.
1. Set the fan speed as indicated in the table (if necessary). The set ting can be modified using parameters , , and
.
See Changing the parameters at installer level, page 51
2. Check the setting of the gas/air ratio.
7 Commissioning
123157 - v.07 - 10082015 43
Page 44
See Checking and setting the gas/air ratio, page 44
7.6.2
Checking and setting the gas/air ratio
1. Unscrew the cap from the flue gas measuring point.
2. Insert the probe for the flue gas analyser into the measurement opening.
Warning During measurement, seal the opening around the sensor fully.
Note
The flue gas analyser must have a minimum accuracy of ±0.25% O2/CO2.
The flue gas analyser must meet the requirements of BS 7927 or BS-EN 503793 and be calibrated according to the manufac turer's requirements.
3. Measure the percentage of O2/CO2 in the flue gases. Take meas urements at full load and at low load.
Note Measurements must be taken with the front housing off.
Checking/setting values for O2/CO2 at full load
1. Set the boiler to full load. Press the two keys at the same time. The display shows . The symbol appears.
2. Measure the percentage of O2/CO2 in the flue gases.
3. Compare the measured value with the checking values in the table.
Tab.25 Checking/setting values O2/CO2 at full load for G20 (H gas)
Values at full load for G20 (H gas)
O2 (%) CO2 (%)
Quinta Pro 30
4.3 – 4.8
(1)
9.0
(1)
– 9.3
Quinta Pro 45
4.3 – 4.8
(1)
9.0
(1)
– 9.3
Quinta Pro 65
4.3 – 4.8
(1)
9.0
(1)
– 9.3
Quinta Pro 90
3.4 – 3.9
(1)
9.5
(1)
– 9.8
Quinta Pro 115
4.2 – 4.7
(1)
9.1
(1)
– 9.4
(1) Nominal value
Tab.26 Checking/setting values O2/CO2 at full load for G31 (pro
pane)
Values at full load for G31 (pro pane)
O2 (%) CO2 (%)
Quinta Pro 30
4.1 – 4.6
(2)
10.7
(2)
– 11.0
Quinta Pro 45
4.1 – 4.6
(1)
10.7
(2)
– 11.0
Quinta Pro 65
4.1 – 4.6
(2)
10.7
(2)
– 11.0
Quinta Pro 90
4.1 – 4.6
(2)
10.7
(2)
– 11.0
Quinta Pro 115
4.4 – 4.9
(2)
10.5
(2)
– 10.8
(1) Nominal value
Fig.37 Flue gas measuring point
AD-0000069-01
Fig.38 Setting to full load
AD-0000070-01
rpm
kWµA
± 30l/min
barPsi
St ºC
ºCºFh
7 Commissioning
44 123157 - v.07 - 10082015
Page 45
Caution
The O2 values at full load must be lower than the O2 values at part load.
The CO2 values at full load must be higher than the CO2 values at part load.
4. If the measured value is outside of the values given in the table, cor rect the gas/air ratio.
5. Using adjusting screw A, adjust the percentage of O2/CO2 for the gas type being used to the nominal value. This should always be in
side the highest and lowest setting limit.
Checking/setting values for O2/CO2 at low load
1. Set the boiler to low load. Press the key several times until appears on the display.
2. Measure the percentage of O2/CO2 in the flue gases.
3. Compare the measured value with the checking values in the table.
Tab.27 Checking/setting values O2/CO2 at low load for G20 (H gas)
Values at low load for G20 (H gas)
O2 (%) CO2 (%)
Quinta Pro 30
5.7
(1)
– 6.2 8.2 – 8.5
(1)
Quinta Pro 45
5.7
(1)
– 6.2 8.2 – 8.5
(1)
Quinta Pro 65
4.8
(1)
– 5.3 8.7 – 9.0
(1)
Quinta Pro 90
4.8
(1)
– 5.3 8.7 – 9.0
(1)
Quinta Pro 115
5.6
(1)
– 6.1 8.3 – 8.6
(1)
(1) Nominal value
Tab.28 Checking/setting values O2/CO2 at low load for G31 (pro
pane)
Values at low load for G31 (pro pane)
O2 (%) CO2 (%)
Quinta Pro 30
5.4
(2)
– 5.9 9.9 – 10.2
(2)
Quinta Pro 45
5.4
(1)
– 5.9 9.9 – 10.2
(2)
Quinta Pro 65
5.4
(2)
– 5.9 10.1 – 10.4
(2)
Quinta Pro 90
5.4
(2)
– 5.9 9.9 – 10.2
(2)
Quinta Pro 115
5.7
(2)
– 6.2 9.7 – 10.0
(2)
(1) Nominal value
Caution
The O2 values at low load must be higher than the O2 values at full load.
The CO2 values at low load must be lower than the CO2 values at full load.
4. If the measured value is outside of the values given in the table, cor rect the gas/air ratio.
Fig.39 Position of adjusting screw A
AD-0000067-01
A A
Fig.40 Setting to low load
AD-0000071-01
rpm
kWµA
± 30l/min
barPsi
St ºC
ºCºFh
7 Commissioning
123157 - v.07 - 10082015 45
Page 46
5. Using adjusting screw B, adjust the percentage of O2/CO2 for the gas type being used to the nominal value. This should always be in
side the highest and lowest setting limit.
6. Set the boiler back to the normal operating status.
7.7
Final instructions
1. Remove the measuring equipment.
2. Screw the cap on to the flue gas measuring point.
3. Put the front casing back. Tighten the two screws by a quarter of a turn.
4. Press the key to return the boiler to normal operating mode.
5. Heat the CH system up to approximately 70°C.
6. Switch the boiler off.
7. Vent the central heating system after approx. 10 minutes.
8. Turn on the boiler.
9. Check the water pressure. If necessary: top up the central heating system.
10. Specify the gas type used on the type plate.
11. Instruct the user in the operation of the system, boiler and controller.
12. Inform the user of the maintenance to be performed.
13. Hand over all manuals to the user.
Fig.41 Position of adjusting screw B
AD-0000072-01
B B
B
7 Commissioning
46 123157 - v.07 - 10082015
Page 47
8 Operation
8.1 Use of the control panel
1
Display
2
Escape or key
3
CH temperature or key
4
DHW temperature or key
5
Enter or Cancel key lockout
6
Chimney-sweeping keys
Press the 2 and 3 keys simultaneously.
7
Menu keys
Press the 4 and 5 keys simultaneously.
8
On/off switch
The display has several positions and symbols and provides information about the operating status of the boiler and any faults. A maintenance message may also appear on the display. Numbers, dots and/or letters may be shown. The symbols above the function keys indicate the current function.
The display content can be changed using parameter . The brightness of the display lighting can be changed using parameter
. Key lockout is activated by setting parameter to . If no key is press ed for 3 minutes, the display lighting switches off and only the current wa ter pressure, the key and the symbol are displayed. Press the
key for approximately 2 seconds to reactivate the display and the oth
er keys. The symbol disappears from the display.
8.2 Shutdown
If the central heating is not due to be used for a long period of time, it is recommended that the boiler be disconnected from the power supply.
1. Switch off the boiler's electrical connection.
2. Shut off the gas supply.
3. Keep the area frost-free.
8.3 Frost protection
Caution
Tap the boiler and central heating system if you are not going to use your home or the building for a long time and there is a chance of frost. The frost protection does not work if the boiler is out of opera tion. The built-in boiler protection is only activated for the boiler and not for the system and radiators. Open the valves of all the radiators connected to the system.
Set the temperature control low, for example to 10°C.
If there is no heat demand, the boiler will only switch on to protect itself against frost.
If the temperature of the central heating water in the boiler drops too low, the built-in boiler protection system is activated. This system works as fol lows:
At a water temperature lower than 7°C, the heating pump starts. If the water temperature is lower than 4°C, the boiler switches on. If the water temperature is higher than 10℃ the boiler switches off and
the circulation pump continues to run for a short time. To prevent the system and radiators freezing in frost-sensitive areas (e.g. a garage), a frost thermostat or outside sensor can be connected to the boiler.
Fig.42
Control panel
AD-0000065-01
1
2 3 4 5 8
6 7
8 Operation
123157 - v.07 - 10082015 47
Page 48
9 Settings
9.1 Parameter descriptions
Tab.29 Factory setting
Parame ter
Description Adjustment range 30 45 65 90 115
Flow temperature: T
SET
20 to 90ºC 80 80 80 80 80
DHW temperature: T
SET
40 to 65ºC 55 55 55 55 55
Boiler control/DHW
0 = CH off/DHW off 1 = CH on/DHW on 2 = CH on/DHW off 3 = CH off/DHW on
1 1 1 1 1
ECO setting
0 = Comfort 1 = ECO setting 2 = Controller dependent
2 2 2 2 2
Anticipation resistance
0 = No anticipation resistance for the ON/OFF thermostat 1 = Anticipation resistance for the ON/OFF thermostat
0 0 0 0 0
Display screen
0 = Simple 1 = Extended 2 = Automatic switching to simple after three minutes 3 = Automatic switching to simple after three minutes; key lock is active
2 2 2 2 2
Post-circulation of the pump
1 to 98 minutes 99 minutes = continuous
3 3 3 3 3
Brightness of display lighting
0 = Dimmed 1 = Bright
1 1 1 1 1
Maximum fan speed (central heating) G20 (H gas) x100 rpm 41 56 58 62 70
Maximum fan speed (DHW) G20 (H gas) x100 rpm 41 56 58 62 70
Minimum fan speed (CH + DHW) G20 (H gas) x100 rpm 15 15 16 17 18
Minimum fan speed (offset) 50 50 0 0 0
Start speed 25 25 25 25 25
Minimum water pressure 0–3 bar (x 0.1 bar) 8 8 8 8 8
Maximum flow temperature of system 0 to 90°C 90 90 90 90 90
Reserve - - - - -
Heat curve set point (Maximum outside temperature)
0 to 30ºC
(1)
20 20 20 20 20
Heat curve set point (Flow temperature)
0 to 90ºC
(1)
20 20 20 20 20
Heat curve set point (Minimum outside temperature)
-30 to 0ºC
(1)
-15 -15 -15 -15 -15
Setting the pump speed (Minimum pump speed for central heating operation)
2–10 (x 10%) 4 4 4 4 4
Setting the pump speed (Maximum pump speed for central heating operation)
2–10 (x 10%) 10 10 10 10 10
Frost protection temperature -30 to 0ºC -10 -10 -10 -10 -10
9 Settings
48 123157 - v.07 - 10082015
Page 49
Parame ter
Description Adjustment range 30 45 65 90 115
Legionella protection
0 = Off 1 = On
(2)
2 = Controller dependent
1 1 1 1 1
Set point increase for calorifier 0 to 20ºC 20 20 20 20 20
Switch on temperature for DHW calo rifier sensor
2 to 15ºC 5 5 5 5 5
Control of three-way valve
0 = Normal 1 = Reverse
0 0 0 0 0
Boiler type
0 = Solo 1 = Open vented 2 = Solo (progressive calorifi er control)
0 0 0 0 0
Blocking input function
0 = Heating activated 1 = Blocking frost protection 2 = Blocking with frost protec tion 3 = Lockout with frost protec tion
(3)
1 1 1 1 1
Release function
0 = DHW on 1 = Release input
1 1 1 1 1
Release waiting time 0 to 255 seconds 0 0 0 0 0
Gas valve switching time 0 to 255 seconds 0 0 0 0 0
Fault relay function
0 = Operation signal 1 = Alarm signal
1 1 1 1 1
GpS connected
0 = Not connected 1 = Connected
0 0 0 0 0
HRU connected
0 = Not connected 1 = Connected
0 0 0 0 0
Mains detection phase
0 = Off 1 = On
0 0 0 0 0
Service message Do not change 1 1 1 1 1
Service operating hours Do not change 175 175 175 175 175
Service burning hours Do not change 30 30 30 30 30
Modulating startpoint 1 to 30°C 25 25 25 25
20
(4)
DHW stabilisation time 10 to 100 seconds 100 100 100 100 100
Detection of connected SCUs
0 = No detection 1 = Detection
0 0 0 0 0
+ Factory setting
To restore the factory settings or when replacing the control unit, enter the values dF and dU from the type plate for pa rameters and .
X Y
X Y
X Y
X Y
X Y
(1) Only with outside sensor (2) After switching on, the boiler operates once a week at 65°C for the DHW (3) Pump only (4) If the boiler is being installed in a cascade system, set parameter to 25
Tab.30 Adjustment for gas type G31 (propane)
Parame ter
Description 30 45 65 90 115
Maximum fan speed (central heating) 38 51 54 60 67
Maximum fan speed (DHW) 38 51 54 60 67
Minimum fan speed (CH + DHW) 15 15 16 20 18
9 Settings
123157 - v.07 - 10082015 49
Page 50
Parame ter
Description 30 45 65 90 115
Minimum fan speed (offset) 50 50 0 0 0
Start speed 30 30 25 25 35
Tab.31 Adjustment for flue gas overpressure cascade
Parame ter
Description 30 45 65 90 115
Minimum fan speed (CH + DHW) 18 18 18
19
(1)
19
Minimum fan speed (offset) 0 0 0 0 0
Start speed 25 25 25 25 25
(1) Use the parameter setting for the gas type if the boiler has been adjusted for G31 (propane).
9.2
Changing the parameters
The boiler’s control unit is set for the most common central heating sys tems. These settings will ensure that virtually every central heating system operates effectively. The user or the installer can optimise the parameters as required.
For operation in open-vented systems, several parameter settings must be adjusted. Set the various parameters according to the values given in the table below.
Caution Modification of the factory settings may impair boiler operation.
9.2.1 Changing the user-level parameters
The parameters at user level (see parameter table) can be changed by the user as required.
1. Press the two keys at the same time and then the key until the symbol flashes in the menu bar.
2. Select the user menu using the key.
: appears with flashing .
3. Press the key again. The set value °C (for example) appears and flashes.
4. Change the value by pressing the or keys. In this example, use the key to change the value to °C.
5. Confirm the value with the key.
: appears with flashing .
6. Press the key twice to leave this menu and return to the opera tion display.
Note The other parameters at user level are changed in the same way as . After step 2, use the key to go to the required parame ter.
Fig.43 Changing the user parameters
AD-0000075-01
1x
2x
9 Settings
50 123157 - v.07 - 10082015
Page 51
9.2.2 Changing the parameters at installer level
Parameters to may only be modified by a recognised installer. To prevent unwanted modifications to settings, some parameters can only be changed after the special access code is entered.
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Select the installer menu using the key.
appears on the display.
3. Use the or keys to set the installer code .
4. To confirm, press the key.
: appears with a flashing .
5. Press the key again. The value °C (for example) appears and flashes.
6. Change the value by pressing the or keys. In this example, press the key to set the value to °C.
7. Press the key to confirm the value.
: appears with a flashing .
8. Set any other parameters by selecting them using the or keys.
9. Press the key twice to leave this menu and return to the opera tion display.
Note The boiler also returns to operating status if no keys are pressed for 3 minutes.
9.2.3 Setting the maximum load for CH operation
M Maximum heat input
F Factory setting
Q Load (Hi) (kW)
R Fan speed (rpm)
M Maximum heat input
F Factory setting
Q Load (Hi) (kW)
R Fan speed (rpm)
M Maximum heat input
F Factory setting
Q Load (Hi) (kW)
R Fan speed (rpm)
Fig.44 Inputting the access code
AD-0000076-01
3x
2x
Fig.45 Load Quinta Pro 30
AD-3000035-01
1500 2500 3500 4500 5500 6500 7500
0
20
R
Q
40
30
F
M
4100
Fig.46 Load Quinta Pro 45
AD-3000034-01
60
1500 2500 3500 4500 5500 6500 7500
0
20
R
Q
41
5600
F
M
Fig.47 Load Quinta Pro 65
AD-3000033-01
80
1500 2500 3500 4500 5500 6500 7500
0
20
40
R
Q
62
F
M
5800
9 Settings
123157 - v.07 - 10082015 51
Page 52
M Maximum heat input
F Factory setting
Q Load (Hi) (kW)
R Fan speed (rpm)
M Maximum heat input
F Factory setting
Q Load (Hi) (kW)
R Fan speed (rpm)
See the graphs for the relationship between load and speed for natural gas. The speed can be changed using parameter . Proceed as fol lows:
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Select the installer menu using the key.
appears on the display.
3. Use the or keys to set the installer code .
4. To confirm, press the key.
: appears with a flashing .
5. Press the key to go to parameter : .
6. To confirm, press the key.
7. Press the key to increase the speed, for example from to (see graphs for the corresponding output).
8. To confirm, press the key.
9. Press the key twice to leave this menu and return to the opera tion display.
Fig.48 Load Quinta Pro 90
AD-3000032-01
80
1500 2500 3500 4500 5500 6500 7500
0
20
40
60
100
R
Q
86
6200
F
M
Fig.49 Load Quinta Pro 115
AD-3000031-01
1500 2500 3500 4500 5500 6500 7500
0
20
40
60
80
100
120
R
Q
110
7000
F
M
Fig.50 Modifying
AD-0000077-01
3x
...x
...x
2x
9 Settings
52 123157 - v.07 - 10082015
Page 53
9.2.4 Return to the factory settings
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Select the installer menu using the key.
appears on the display.
3. Use the or keys to set the installer code .
4. To confirm, press the key.
: appears with a flashing .
5. Press the key several times until : appears on the display with a flashing .
6. To confirm, press the key.
appears with a flashing . This is the current value of X for dF.
Check this against the value of X on the type plate.
7. Enter the value of X shown on the type plate using the or keys.
8. To confirm, press the key.
: appears with a flashing . This is the current value of Y for
dU. Check this against the value of Y on the type plate.
9. Enter the value of Y shown on the type plate using the or keys.
10. To confirm, press the key. The factory settings are reset.
11. The display returns to the current operating mode.
9.2.5
Carrying out an auto-detect
After removing a PCB, an auto-detect must be carried out. Proceed as fol lows:
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Select the installer menu using the key.
appears on the display.
3. Use the or keys to set the installer code .
4. To confirm, press the key.
: appears with a flashing .
5. Press the key several times until appears on the display with a flashing .
6. To confirm, press the key. Auto-detect is carried out.
7. The display returns to the current operating mode.
Fig.51 Resetting factory settings
AD-0000078-01
3x
...x
Fig.52 Carrying out an auto-detect
AD-0000079-01
3x
...x
9 Settings
123157 - v.07 - 10082015 53
Page 54
9.2.6 Setting the manual mode
In some cases, it may be necessary to set the boiler to manual mode, for example when the controller has not yet been connected. The boiler can be set to automatic or manual mode via the symbol. Proceed as follows:
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Press the key; the display will show: either the text with the current water pressure (only if a water pressure sensor is connected). or the minimum flow temperature value.
3. Press the or keys to temporarily increase this value in manual mode.
4. To confirm, press the key. The boiler is now set to manual mode.
5. Press the key twice to leave this menu and return to the opera tion display.
9.3 Displaying the measured values
The control unit continually registers various values from the boiler and the connected sensors. These values can be read on the control panel of the boiler.
9.3.1
Reading the various current values
The following current values can be read in the information menu :
= Status. = Sub-status. = Flow temperature (°C). = Return temperature (°C). = Calorifier temperature (°C). = Outside temperature (°C) (only with outside sensor). = Solar boiler temperature (°C). = Internal set point (°C). = Ionisation current (μA). = Fan speed (rpm). = Water pressure (bar (MPa)). = Supplied relative heat output (%).
The current values can be read as follows:
Fig.53 Setting manual mode
AD-0000080-01
2x
2x
bar
9 Settings
54 123157 - v.07 - 10082015
Page 55
1. Press the two keys at the same time. The symbol flashes.
2. Confirm by pressing the key. The screen alternates between the parameter and the current status, e.g. .
3. Press the key. The screen alternates between the parameter and the current sub-status, e.g. .
4. Press the key. The screen alternates between the parameter and the current flow temperature, e.g. °C.
5. Press the key successively to scroll through the various parame ters , , , .
6. Press the key. The screen alternates between the parameter and the internal setpoint, e.g. °C.
7. Press the key. The screen alternates between the parameter and the current ionisation current, e.g. µA.
8. Press the key. The screen alternates between the parameter and the current fan speed, e.g. rpm.
9. Press the key. The screen alternates between the parameter and the current water pressure, e.g. bar. If no water pressure sensor is connec ted, [-.-]appears on the display.
10. Press the key. The screen alternates between the parameter and the current modulation percentage, e.g. %.
11. Press the key. The readout cycle starts again with the parameter .
12. Press the key twice to exit this menu and return to the operation display.
9.3.2 Reading out the hour counter and percentage of successful starts
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Press the key. The display alternates between and the number of boiler oper ating hours, for example .
3. Press the key; the display shows . The display alternates between and the number of burning hours for CH operation, for example .
4. Press the key; the display shows . The display alternates between and the percentage of success ful starts, for example %.
5. Press the key twice to leave this menu and return to the opera tion display.
Fig.54 Reading current values
AD-0000073-01
4x
2x
Fig.55 Reading out the hour counter
AD-0000074-01
5x
2x
9 Settings
123157 - v.07 - 10082015 55
Page 56
9.3.3 Status and sub-status
The information menu gives the following status and sub-status num bers:
Tab.32 Status and sub-status numbers
Status Sub-status
Stand-by mode Stand-by mode
Boiler start (heat demand) Anti-swing
Control three-way valve
Start pump
Wait for the correct temperature before burner start
Burner start Open flue gas damper/external gas valve
Increase fan speed
Pre-ventilation
Wait for release signal
Burner on
Pre-ignition
Main ignition
Flame detection
Intermediate ventilation
Burning on CH operation Temperature control
Limited temperature control (ΔT protection)
Capacity control
Temperature gradient protection level 1 (modulate down)
Temperature gradient protection level 2 (low load)
Temperature gradient protection level 3 (blocking)
Modulate up for flame control
Temperature stabilisation time
Cold start
DHW mode active Temperature control
Limited temperature control (ΔT protection)
Capacity control
Temperature gradient protection level 1 (modulate down)
Temperature gradient protection level 2 (low load)
Temperature gradient protection level 3 (blocking)
Modulate up for flame control
Temperature stabilisation time
Cold start
Burner stop Burner off
Post ventilation
Close flue gas damper/external gas valve
Recirculation protection
Stop fan
Boiler stop (end of heat demand) Pump post circulation
Pump off
Control three-way valve
Start anti-swing
9 Settings
56 123157 - v.07 - 10082015
Page 57
Status Sub-status
Control stop Wait for burner start
Anti-swing
Blocking Blocking code
Bleed Stand-by mode
Control three-way valve
Start pump
Pump off
Control three-way valve
9 Settings
123157 - v.07 - 10082015 57
Page 58
10 Maintenance
10.1 General
The boiler does not require a lot of maintenance. Nevertheless, the boiler must be inspected and maintained periodically. To determine the best time for servicing, the boiler is equipped with an automatic service message. The control unit determines when this service message appears. Depend ing on boiler use, the first service message appears no later than 3 years after installation of the boiler.
Caution
Maintenance operations must be completed by a qualified in staller. During inspection or maintenance work, always replace all gas kets of the disassembled parts. Replace defective or worn parts with original spare parts. An annual inspection is mandatory.
10.2
Service message
The boiler display will clearly indicate that a service is required at the ap propriate time. Use the automatic service message for preventive mainte nance to keep faults to a minimum. The service messages show which service kit must be used. These service kits contain all parts and gaskets that are required for the relevant service. These service kits (A, B or C), put together by Remeha, are available from your spare parts supplier.
Note
A service message must be followed up within 2 months. There fore, call your installer as soon as possible. If the iSense modulating thermostat is connected to the boiler, this service message can also be forwarded to the iSense. Con sult the thermostat manual.
Caution Reset the service message following every service.
10.2.1 Resetting the service messages
A service message on the boiler display must be reset by a qualified in staller after the maintenance service has been carried out using the rele vant service kit. Proceed as follows:
1. When the maintenance message is displayed, press the key once.
appears on the display.
2. Use the or keys to set the installer code .
3. Confirm by pressing the key. The maintenance message is reset. The display returns to the cur rent operating mode.
Fig.56 Setting the installer code
AD-0000081-01
1x
10 Maintenance
58 123157 - v.07 - 10082015
Page 59
10.2.2 Starting a new service interval
For an interim service it is advisable to read out in the boiler service menu what maintenance service should be carried out. Use the indicated Remeha service kits (A, B or C). This service message must be prevented by carrying out a reset. Start the next service interval. Proceed as follows:
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Press the key. The display alternates between and the number of boiler oper ating hours, for example .
3. Press key several times until flashes on the menu bar.
4. Press the key. The display shows .
5. Use the or keys to set the installer code .
6. Confirm by pressing the key.
7. Press the key several times until appears on the display with a flashing (for example). In this example, the next service message is .
8. Press the key again.
appears on the display.
9. Press the key.
appears with a flashing .
10. Press the key to adjust the setting to .
11. Confirm by pressing the key. The new service interval begins.
12. Press the key 3 times to leave this menu and return to the op eration display.
10.3 Standard inspection and maintenance operations
Warning Always wear safety goggles and a dust mask during cleaning work (involving compressed air).
For a service, always perform the following standard inspection and main tenance operations.
Caution
Check whether all gaskets have been positioned properly (abso lutely flat in the appropriate groove means they are gas tight). During the inspection and maintenance operations, water (drops, splashes) must never come into contact with the electri cal parts.
10.3.1
Checking the water pressure
1. Check the water pressure. The water pressure must be at least 0.8 bar. If the water pressure is too low, the symbol will appear.
Note For open vented systems, the water pressure must be at least 0.3 bar (Q30/Q45/Q65/Q90) or 0.5 bar (Q115).
2. If necessary: top up the central heating system.
Fig.57 Starting a new service interval
AD-0000082-01
3x
5x
...x
...x
10 Maintenance
123157 - v.07 - 10082015 59
Page 60
10.3.2 Checking the ionisation current
1. Check the ionisation current at full load and at low load. The value is stable after 1 minute.
2. Clean or replace the ionisation/ignition electrode if the value is lower than 4 µA.
For more information, see Replacing the ionisation/ignition electrode, page 64
10.3.3
Checking the flue gas outlet/air supply connections
1. Check the flue gas outlet and air supply connections for condition and tightness.
10.3.4
Checking the combustion
Combustion is checked by measuring the O2/CO2 percentage in the flue gas outlet duct.
Fig.58 Checking flue gas outlet/air supply
connections
AD-0000084-01
10 Maintenance
60 123157 - v.07 - 10082015
Page 61
For more information, see Checking and setting the gas/air ratio, page 44
10.3.5
Checking the automatic air vent
1. Switch off the boiler's electrical connection.
2. Close the gas tap under the boiler.
3. Close the main gas tap.
4. Unscrew the two screws located under the front housing by a quar ter turn and remove the front housing.
5. Tilt the instrument box forwards by opening the clips on the sides.
6. Check whether water is visible in the hose of the automatic air vent.
7. In the event of a leak, replace the air vent.
Fig.59 Checking the automatic air vent
AD-3000076-01
6
5
5
5
4
90º
4
1
Gas/Gaz
2 3
10 Maintenance
123157 - v.07 - 10082015 61
Page 62
10.3.6 Cleaning the siphon
Danger The siphon must always be sufficiently filled with water. This pre vents flue gases from entering the room.
1. Dismantle the siphon and clean it.
2. Fill the siphon up with water.
3. Fit the siphon.
Fig.60 Cleaning the siphon
AD-0000086-01
1
3
2
10 Maintenance
62 123157 - v.07 - 10082015
Page 63
10.3.7 Checking the burner and cleaning the heat exchanger
1. Remove the air inlet flue on the venturi.
2. Loosen the gland on the gas valve unit.
3. Remove the plugs from the fan.
4. Remove the plugs from the gas valve unit.
5. Remove the ignition electrode plug from the ignition transformer.
6. Remove the front plate from the heat exchanger.
7. Carefully lift the front plate, including the burner and fan, away from the heat exchanger.
8. Use a vacuum cleaner fitted with a special endpiece (accessory) to clean the top part of the heat exchanger (combustion chamber).
9. Thoroughly clean with the vacuum cleaner again without the top cleaning brush on the endpiece.
10. Check (e.g. using a mirror) whether any visible contamination has been left behind. If it has, remove it with the vacuum cleaner.
11. Clean the lower section of the heat exchanger with the special cleaning blade (accessory).
12. Burner maintenance is almost never required; it is self-cleaning:
If necessary, carefully clean the cylinder-shaped burner with com pressed air. Check that the burner cover of the dismantled burner is free from cracks and/or damage. If not, replace the burner.
13. Reassemble the unit in the reverse order.
Caution
Remember to reconnect the fan plug. Check that the gasket is correctly positioned between the mixing elbow and the heat exchanger (the gasket must lie absolutely flat in the appropriate groove to ensure that no gas can leak).
14. Open the gas supply and switch the power supply to the boiler back on.
Fig.61 Checking the burner and cleaning
the heat exchanger
AD-0000087-01
1
3
4
11
8 9
2
5
6
7
10
12
10 Maintenance
123157 - v.07 - 10082015 63
Page 64
10.4 Specific maintenance work
Perform the specific maintenance work if this proves to be necessary fol lowing the standard inspection and maintenance work. To conduct the specific maintenance work:
10.4.1 Replacing the ionisation/ignition electrode
The ionisation/ignition electrode must be replaced if:
The ionisation current is < 4 µA. The electrode is damaged or worn. The electrode is included in the service kit.
1. Remove the plug of the electrode from the ignition transformer.
Note The ignition cable is fixed to the electrode and therefore may not be removed.
2. Remove the two screws.
3. Remove the entire component.
4. Fit the new ionisation/ignition electrode.
5. Reassemble the unit in the reverse order.
Fig.62 Replacing the ionisation/ignition elec
trode
AD-0000088-01
4
1
2
3
10 Maintenance
64 123157 - v.07 - 10082015
Page 65
10.4.2 Checking the non-return valve
1. Remove the air inlet flue on the venturi.
2. Loosen the gland on the gas valve unit.
3. Remove the plug from the fan.
4. Remove the plug from the gas valve unit.
5. Dismantle the fan.
6. Remove the fan together with the mixing elbow unit.
7. Inspect the non-return valve and replace it in the event of a defect or damage, or if the maintenance kit contains a non-return valve.
8. Reassemble in the reverse order.
10.4.3 Reassembling the boiler
1. Fit all removed parts in the reverse order.
Caution During inspection and maintenance operations, always replace all gaskets on the parts removed.
2. Fill the siphon with water.
3. Put the siphon back in place.
4. Carefully open the water tap.
5. Fill the installation with water.
6. Vent the installation.
7. Top up with more water if necessary.
8. Check the tightness of the gas and water connections.
9. Put the boiler back into operation.
Fig.63 Checking the non-return valve
AD-3000342-01
1
3
4
2x
5
7
6
8
2
10 Maintenance
123157 - v.07 - 10082015 65
Page 66
11 Troubleshooting
11.1 Error codes
The boiler is fitted with an electronic regulation and control unit. The heart of the control is a microprocessor, the
Comfort Master©, which both pro tects and controls the boiler. In the event of an error, a corresponding code is displayed.
The meaning of the error codes can be found in the error table.
Note Note the error code displayed. The error code is needed to find the cause of the error quickly and correctly and for any support from Remeha.
11.1.1 Blocking
A (temporary) blocking mode is a boiler status, resulting from an abnormal state. The display shows a blocking code (for example ). The con trol unit makes a number of attempts to start the boiler again. The blocking codes can be read out as follows:
1. Press the two keys at the same time.
2. Confirm by pressing key . The display alternates between and the blocking code .
3. Press the key.
appears on the display.
Note The boiler automatically returns to operation once the cause of the blocking has been removed.
Tab.33 Blocking codes
Blocking code Description Possible cause Check/solution
Parameter error
Parameter error on the PSU PCB
Reset and Restore parameters with Recom
Maximum flow temperature exceeded
No flow or insufficient flow
Check the flow (direction, pump, valves) Reasons for the heat demand
Maximum increase of the flow temperature has been excee ded
No flow or insufficient flow Sensor error
Check the flow (direction, pump, valves) Check the water pressure Check that the sensors are operating cor rectly Check that the sensor has been fitted prop erly Check the cleanliness of the heat exchang er
Maximum difference between the flow and return tempera ture exceeded
No flow or insufficient flow Sensor error
Check the flow (direction, pump, valves) Check the water pressure Check that the sensors are operating cor rectly Check that the sensor has been fitted prop erly Check the cleanliness of the heat exchang er
No release signal
External cause Parameter error Bad connection
Remove external cause Check parameters Check the wiring
Phase and neutral of mains supply mixed up
Mains supply incorrectly wired Floating network or 2-phase network
Invert phase and neutral Set parameter to
Fig.64 Blocking code
AD-0000089-01
11 Troubleshooting
66 123157 - v.07 - 10082015
Page 67
Blocking code Description Possible cause Check/solution
Blocking input is active
External cause Parameter error Bad connection
Remove external cause Check parameters Check the wiring
Blocking input active or frost protection active
External cause Parameter error Bad connection
Remove external cause Check parameters Check the wiring
Communication error with the SCU PCB
Poor connection with BUS SCU PCB not present in boiler
Check the wiring Carry out automatic detection
Water pressure too low Water pressure too low
Check the water pressure Fill the boiler and the installation with water
Gas pressure too low
No flow or insufficient flow Incorrect setting on gas pressure switch (Gps) on SCU PCB
Check that the gas valve is fully opened Check the gas supply pressure Check whether the Gps has been correctly fitted Replace the Gps switch if necessary
(1)
Configuration error or SU PCB not recognised
Incorrect SU PCB for this boil er
Replace SU PCB
(1)
Configuration error or default parameter table incorrect
Parameter error in the PCU PCB
Replace PCU PCB
(1)
Configuration error or PSU PCB not recognised
Incorrect PCU PCB for this boiler
Replace PCU PCB
(1)
Configuration error or param eters and unknown
- Reset and
(1)
Configuration procedure ac tive
Active for a short time after switching on the boiler
No action
Communication error with the SU PCB
Bad connection
Check whether the PCU PCB has been cor rectly fitted in the connector on the SU PCB
No flame during operation No ionisation current
Vent the gas supply to remove air Check that the gas valve is fully opened Check the gas supply pressure Check the operation and setting of the gas valve unit Check that the air supply inlet and flue gas outlet are not blocked Check that there is no recirculation of flue gases
Internal error in SU PCB - Replace SU PCB
(1) These blocks are not stored in the error memory
11.1.2 Lock out
If the blocking conditions still exist after various start attempts, the boiler goes into lockout (also called error). The boiler will also lock out if an error is signalled anywhere in the boiler. An error code will appear on the dis play. The error code is displayed as follows:
In a red flashing display:
the symbol the symbol the error code, for example
The meaning of the error codes can be found in the error table. Note the error code.
Note The error code is needed to find the cause of the error quickly and correctly and for any support from Remeha.
11 Troubleshooting
123157 - v.07 - 10082015 67
Page 68
Press the key for two seconds. If the error code continues to display, search for the cause in the error table and apply the solution.
Note If the display does not show but rather , the boiler must be switched off and then switched on again 10 seconds later before the error can be reset.
Tab.34 Error codes
Error code Description
Parameter storage unit PSU not found:
Bad connection: check the wiring
Safety parameters not OK:
Bad connection: check the wiring Faulty PSU: replace PSU
Flow temperature sensor short circuited:
Bad connection: check the wiring Sensor not connected or incorrectly connected:
Check that the sensor has been fitted properly Check that the sensors are operating correctly
Faulty sensor: replace the sensor if necessary
Flow temperature sensor open:
Bad connection: check the wiring Sensor not connected or incorrectly connected:
Check that the sensor has been fitted properly Check that the sensors are operating correctly
Faulty sensor: replace the sensor if necessary
Temperature of heat exchanger too low:
Bad connection: check the wiring Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly Faulty sensor: replace the sensor if necessary No circulation:
Vent the air from the CH system
Check the circulation (direction, pump, valves)
Check the water pressure
Check the cleanliness of the heat exchanger
If present: check the boiler type parameter setting
Temperature of heat exchanger too high:
Bad connection: check the wiring Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly Faulty sensor: replace the sensor if necessary No circulation:
Vent the air from the CH system
Check the circulation (direction, pump, valves)
Check the water pressure
Check the cleanliness of the heat exchanger
If present: check the boiler type parameter setting
Return temperature sensor short-circuited:
Bad connection: check the wiring Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly Faulty sensor: replace the sensor if necessary
11 Troubleshooting
68 123157 - v.07 - 10082015
Page 69
Error code Description
Open circuit in return temperature sensor:
Bad connection: check the wiring Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly Faulty sensor: replace the sensor if necessary
Return temperature too low:
Bad connection: check the wiring Faulty sensor: replace the sensor if necessary Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly No circulation:
Vent the air from the CH system
Check the circulation (direction, pump, valves)
Check the water pressure
Check the cleanliness of the heat exchanger
If present: check the boiler type parameter setting
Return temperature too high:
Bad connection: check the wiring Faulty sensor: replace the sensor if necessary Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly No circulation:
Vent the air from the CH system
Check the circulation (direction, pump, valves)
Check the water pressure
Check the cleanliness of the heat exchanger
If present: check the boiler type parameter setting
Difference between the flow and return temperatures too great:
No circulation:
Vent the air from the CH system
Check the circulation (direction, pump, valves)
Check the water pressure
Check the cleanliness of the heat exchanger
Check that the heating pump is operating correctly
If present: check the boiler type parameter setting Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly Faulty sensor: replace the sensor if necessary
Temperature of heat exchanger above normal range (STB high-limit thermostat):
Bad connection: check the wiring
Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly
Check that the sensor has been fitted properly Faulty sensor: replace the sensor if necessary No circulation:
Vent the air from the CH system
Check the circulation (direction, pump, valves)
Check the water pressure
Check the cleanliness of the heat exchanger
If present: check the boiler type parameter setting
If present: Air pressure differential switch has been triggered:
Air supply or flue gas outlet blocked: check air supply and flue gas outlet for blockage
11 Troubleshooting
123157 - v.07 - 10082015 69
Page 70
Error code Description
Five failed burner starts:
No ignition spark:
Check cabling of ignition transformer Check the ionisation/ignition electrode Check breakdown to earth Check the condition of the burner cover Check the earthing Defective control SU PCB
Ignition spark but no flame:
Vent the gas supply to remove air Check that the gas valve is fully opened Check the gas supply pressure Check the operation and setting of the gas valve unit Check that the air supply inlet and flue gas outlet are not blocked Check the wiring on the gas valve unit Defective control SU PCB
Flame present, but ionisation has failed or is inadequate:
Check that the gas valve is fully opened Check the gas supply pressure Check the ionisation/ignition electrode Check the earthing Check the wiring on the ionisation/ignition electrode
If VPS switch is present: 5 failed gas leakage checks:
Gas pressure non-existent or too low:
check whether the gas tap is properly open check the gas supply pressure
Wiring fault: check the wiring Incorrect setting of the VPS switch: check whether the VPS switch is set properly VPS pressure switch not installed or poorly installed: check that the VPS switch is properly installed Faulty VPS switch: replace VPS switch if necessary Faulty gas valve: check the gas valve and replace it if necessary
False flame signal:
Ionisation current measured but no flame should be present: check the ionisation and ignition electrode Ignition transformer faulty: replace the ignition transformer if necessary Faulty gas valve: check the gas valve and replace it if necessary The burner remains very hot: O2/CO2 too high: adjust O2/CO2 a
Gas valve error in SU PCB:
Bad connection: check the wiring Defective SU PCB: check the SU PCB and replace if necessary
Fan operation error:
Bad connection: check the wiring Fan defective:
Check for adequate draw on the chimney connection Replace the fan if necessary
Flow and return reversed:
Bad connection Sensor not connected or incorrectly connected:
Check that the sensors are operating correctly Check that the sensor has been fitted properly
Sensor failure: Replace the sensor if necessary Water circulation in wrong direction: check the circulation (direction, pump, valves)
5x flame loss:
No ionisation current:
Vent the gas supply to remove air Check that the gas valve is fully opened Check the gas supply pressure Check the operation and setting of the gas valve unit Check that the air supply inlet and flue gas outlet are not blocked Check that there is no recirculation of flue gases
11 Troubleshooting
70 123157 - v.07 - 10082015
Page 71
Error code Description
Error in communication with SU PCB:
Bad connection: check whether the SU PCB has been correctly fitted in the connector on the PCU PCB
Communication error with the SCU PCB:
Bad connection: check the wiring Faulty SCU PCB: replace SCU PCB
Blocking input in locked-out mode:
Bad connection: check the wiring External cause: remove external cause Wrong parameter set: check the parameters
If present: Heat recovery unit test fault:
Bad connection: check the wiring External cause: remove external cause Wrong parameter set: check the parameters
11.2
Error memory
The boiler control unit has an error memory. It stores the last 16 errors that have occurred.
In addition to the error codes, the following data is also saved:
Number of times that the error occurred: ( ). Boiler operating mode ( ). The flow temperature ( ) and the return temperature ( ) when the error occurred.
To view the error memory, you must first enter the access code .
11 Troubleshooting
123157 - v.07 - 10082015 71
Page 72
11.2.1 Reading out the error memory
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Select the installer menu using the key.
appears on the display.
3. Use the or keys to set the installer code .
4. To confirm, press the key.
appears on the display.
5. The error list or blocking list can be displayed by pressing the or
key.
6. Confirm by pressing the key.
appears with a flashing = last error that occurred, e.g.
.
7. Use the or keys to scroll through the errors or blocks.
8. Press the key to display the details of the errors or blocks.
9. Press the or key to view the following data:
= Number of times that the error occurred. = Number of operating hours. = Status. = Sub-status. = Flow temperature (°C). = Return temperature (°C). = Calorifier temperature (°C). = Outside temperature (°C). Only if an outside temperature
sensor is connected (accessory)
= Solar boiler temperature (°C). = Internal set point (°C). = Ionisation current (μA). = Fan speed (rpm). = Water pressure (bar). = Supplied relative heat output (%).
10. Press the key to interrupt the display cycle. appears with a flashing = last error that occurred.
11. Use the or keys to scroll through the errors or blocks.
12. Press the key to show the error list or blocking list.
13. Press the key twice to exit the error menu.
Fig.65 Reading out an error
AD-0000090-01
4x
2x
11 Troubleshooting
72 123157 - v.07 - 10082015
Page 73
11.2.2 Clearing error memory
1. Press the two keys at the same time and then press the key until the symbol flashes in the menu bar.
2. Select the installer menu using the key.
appears on the display.
3. Use the or keys to set the installer code .
4. To confirm, press the key.
appears on the display.
5. The error list or blocking list can be displayed by pressing the or
key.
6. Confirm by pressing the key.
appears with a flashing .
7. Press the key several times until appears on the dis play.
8. Press the key.
appears with a flashing .
9. Press the key to adjust the setting to .
10. Press the key to delete the errors from the error memory.
11. Press the key three times to exit the error memory.
Fig.66 Clearing error memory
AD-0000091-01
3x
4x
11 Troubleshooting
123157 - v.07 - 10082015 73
Page 74
12 Disposal
12.1 Removal/recycling
Note Removal and disposal of the boiler must be carried out by a quali fied person in accordance with local and national regulations.
To remove the boiler, proceed as follows:
1. Switch off the boiler's electrical connection.
2. Shut off the gas supply.
3. Shut off the water supply.
4. Drain the installation.
5. Remove the siphon.
6. Remove the air supply/flue gas outlet pipes.
7. Disconnect all pipes on the boiler.
8. Remove the boiler.
12 Disposal
74 123157 - v.07 - 10082015
Page 75
13 Spare parts
13.1 General
Only replace defective or worn boiler parts with original parts or recom mended parts.
Send the part to be replaced to the Remeha Quality Control department if the relevant part is covered by the guarantee (see the General Terms of Sale and Delivery).
13 Spare parts
123157 - v.07 - 10082015 75
Page 76
13.2 Parts
Fig.67 Quinta Pro 30 – 45
AD-0800023-03
EV 90552-1-4
2031B
2031B2031A
3007
2001
2021
2006
2001
2003
2022
2047
2023
2024
2019
2020
2007
1003
2026
2030
2014 4007
3006
3014
2013 4008
2014 4007
2010
2015
2004
4023
4025
4020
4023
4024
4021
2005
4022
2013 4008
1001
3004
2044
2009
3013
2029
2008
1002
3011
3010
3001
2047
3005
2028
2031A 2032
2027 4006
2033
2017
2012
2011 4005
1005
3012
3003
3008 3009
3002
2002
4018
4019
4002
4015
4012
4011
4004
4015
4001
4003
4016
4014
4013
4010
4017
4009
2040
2039
2038
2037
2042
2041
2045
2046
2016
2017
2025
13 Spare parts
76 123157 - v.07 - 10082015
Page 77
Fig.68 Quinta Pro 65
AD-0800028-03
EV 90553-1-4
1003
2026
2014 4007
4011
3006
3014
2006
2010
2001
1001
3004
2009
3013
2029
2030
2008
2003
1002
3011
3010
3001
2047
3005
2028
2031A 2032
2027 4006
2033
2012
2011 4005
1005
3012
2024
3003
3008 3009
3002
2002
2007
4018
4019
4002
4015
4012
4004
4015
4001
4003
4016
4014
4013
4010
4017
4009
2040
2039
2038
2037
2042
2041
2045
2046
2021
2047
2019
2015
2004
2020
4023
4023
4024
4021
2005
4022
2044
2013 4008
2014 4007
4025
4020
2017
2017
2016
2025
2031B
2031B2031A
3007
13 Spare parts
123157 - v.07 - 10082015 77
Page 78
Fig.69 Quinta Pro 90
AD-0800033-03
EV 90554-1-4
1003
1004
3013
2030
2014 4007
2025
3006
3014
2006
2001
2013 4008
2014 4007
1001
2009
2008
2003
1002
3016
3011
3015
3010
3001
2047
2029
3005
2028
2026
2031A
2032
2027 4006
2033
2012 2011
4005
1005
3012
2024
3003
3008 3009
3002
2002
2007
2024
2021
2047
2023
2019
20202020
2049
2048
2010
2015
2004
2005
4023
4023
4024
4022
4021
4011
4024
4020
4018
4019
4002
4015
4012
4004
4015
4001
4003
4016
4014
4013
4010
4017
4009
2040
2039
2038
2037
2043
2042
2041
2045
2046
2017
2017
2016
2031B
2031B2031A
3007
13 Spare parts
78 123157 - v.07 - 10082015
Page 79
Fig.70 Quinta Pro 115
AD-0800038-03
EV 90555-1-4
1003
1004
2030
2014 4007
2025
2006
2001
2013 4008
2014 4007
1001
2009
2008
2003
1002
2047
2029
2028
2026
2031A
2032
2027 4006
2033
2012 2011
4005
1005
2024
2002
2007
2024
2021
2047
2023
2019
20202020
2049
2048
2010
2015
2004
2005
4023
4023
4024
4022
4021
3013
3012
3014
3008
3017
3002
3011
3010
3015
3001
3005
3003
3006
3009
3002
4024
4020
4011
4018
4019
4002
4015
4012
4004
4015
4001
4003
4016
4014
4013
4010
4017
4009
2040
2039
2038
2037
2043
2042
2041
2045
2046
2017
2017
2016
2031B
2031B2031A
3007
13 Spare parts
123157 - v.07 - 10082015 79
Page 80
14 Appendix
14.1 ErP information
14.1.1 Product card
Tab.35 Product card
Remeha - Quinta Pro 30 45 65 90 115
Seasonal space heating energy efficiency class
AAA
- -
Rated heat output
(Prated or Psup)
kW 30 41 62 84 107
Seasonal space heating energy efficiency % 94 95 94 - -
Annual energy consumption GJ 91 124 187 - -
Sound power level LWA indoors dB 46 53 53 60 59
See For specific precautions about assembling, installing and main taining: Safety, page 6
14 Appendix
80 123157 - v.07 - 10082015
Page 81
14.1.2 Package sheet
Fig.71 Package sheet for boilers indicating the space heating energy efficiency of the package
AD-3000743-01
%
1
‘I’
2
%+
3
%( - ‘I’ ) x 0.1 = ±
4
%(‘III’ x + ‘IV’ x ) x 0.9 x ( /100) x = +
(1)
A* = 0.95, A = 0.91, B = 0.86, C = 0.83, D - G = 0.81
5
%( - ‘I’ ) x ‘II’ = +
6
%0.5 x 0.5 x = -
54
<30%
G F E D C B A A
+
A
++
A
+++
%+ (50 x ‘II’) =
7
7
%
from fi che of solar device
Solar contribution AND Supplementary heat pump
Solar contribution
The energy effi ciency of the package of products provided for in this fi che may not correspond to its actual energy effi ciency once installed in a building, as this effi ciency is infl uenced by further factors such as heat loss in the distribution system and the dimensioning of the products in relation to building size and characteristics.
Boiler and supplementary heat pump installed with low temperature heat emitters at 35°C ?
Seasonal space heating energy effi ciency class of package
Seasonal space heating energy effi ciency of package
OR
Seasonal space heating energy effi ciency (in %)
Supplementary heat pump
Tank rating
Collector effi ciency (in %)
Tank volume (in m³) Collector size (in m²)
Seasonal space heating energy effi ciency (in %)
Supplementary boiler
Class I = 1%, Class II = 2%, Class III = 1.5%, Class IV = 2%, Class V = 3%, Class VI = 4%, Class VII = 3.5%, Class VIII = 5%
Temperature control
Seasonal space heating energy effi ciency of boiler
(1) If tank rating is above A, use 0.95
select smaller value
from fi che of heat pump
from fi che of heat pump
from fi che of boiler
from fi che of temperature control
I The value of the seasonal space heating energy efficiency of the
preferential space heater, expressed in %.
II The factor for weighting the heat output of preferential and supple
mentary heaters of a package as set out in the following table.
14 Appendix
123157 - v.07 - 10082015 81
Page 82
III The value of the mathematical expression: 294/(11 · Prated),
whereby ‘Prated’ is related to the preferential space heater.
IV The value of the mathematical expression 115/(11 · Prated),
whereby ‘Prated’ is related to the preferential space heater.
Tab.36 Weighting of boilers
Psup / (Prated + Psup)
(1)(2)
II, package without hot water storage tank II, package with hot water storage tank
0 0 0
0.1 0.3 0.37
0.2 0.55 0.70
0.3 0.75 0.85
0.4 0.85 0.94
0.5 0.95 0.98
0.6 0.98 1.00
≥ 0.7 1.00 1.00
(1) The intermediate values are calculated by linear interpolation between the two adjacent values. (2) Prated is related to the preferential space heater or combination heater.
14.2
EC declaration of conformity
The unit complies with the standard type described in the EC declaration of conformity. It has been manufactured and commissioned in accordance with European directives.
The original declaration of conformity is available from the manufacturer.
14.3 Optional electrical connections
14.3.1 Housing for PCBs
The following PCBs can be purchased as an accessory:
SCU-S03 SCU-X02 SCU-X03
c-Mix The PCBs are positioned in the PCB housing. See the instructions provi ded with the PCB.
1. Unclip the housing cover.
2. Remove the cover.
Fig.72 Open housing for PCBs
AD-3000341-01
2
x3
1
14 Appendix
82 123157 - v.07 - 10082015
Page 83
14.3.2 Connection options for the PCB (SCU-S03)
If the boiler is fitted with the PCB (SCU-S03), then this PCB is automatical ly recognised by the boiler's automatic control unit.
Note On removing this PCB, the boiler will show error code . To prevent this error, an auto-detect must be carried out after remov ing this PCB. For information on carrying out an auto-detect, see: Carrying out an auto-detect, page 53
Connecting the minimum gas pressure switch (Gps)
The minimum gas pressure switch blocks the boiler if the gas inlet pres sure becomes too low.
1. Connect the minimum gas pressure switch to the Gps terminals of the connector.
The presence of the gas pressure switch must be set using parameter
.
Connecting a heat recovery unit (Hru)
1. Connect the wires from the heat recovery unit to the Hru terminals of the connector.
The presence of the heat recovery unit must be set using parameter
.
14.3.3 Connection options for the PCB (SCU-X02)
It is possible to connect a 230 VAC three-way valve or a 24 VAC three­way valve to the SCU-X02 PCB.
Note The starting position of the three-way valve can be modified using a jumper at Jp1.
Control of external three-way valve (3wV) 230 VAC
The external three-way valve (230 VAC) can be used when connecting an indirectly heated calorifier.
1. Connect the three-way valve to the X3 terminals of the connector:
N = neutral C = central heating D = domestic hot water
Control of external three-way valve (3wV) 24 VAC
The external three-way valve (24 VAC) can be used when connecting an indirectly heated calorifier. The neutral position of the three-way valve can be set using parameter .
Fig.73
SCU-S03 PCB
AD-0000058-01
SCU-S03
X2
X2a
X1
Tsol Gps
Tsol Gps
Hru Hru
Fig.74 SCU-X02 PCB
AD-0000060-01
SCU-X02
2C1
Jp1
X2
X2a
X4
3wV
LN C LNC
X3
X1
3wV
N C
3wV
N C D
D
F 2AT
14 Appendix
123157 - v.07 - 10082015 83
Page 84
1. Connect the three-way valve to the X4 terminals of the connector:
N = neutral L = live (24 VAC) C = common (CH or DHW)
14.3.4 Connection options for the PCB (SCU-X03)
The SCU-X03 PCB can control a modulating central heating pump. De pending on the make and type of pump, the pump can be controlled by a 0–10 V, 4–20 mA or a PWM signal. The speed of the pump is modulated based on the signal received from the boiler.
Note For correct connection of the pump, see the documentation sup plied with the pump.
Connecting on/off contact
1. Connect the on/off contact of the CH pump to the connector X1.
Caution Do not use the on/off contact to interrupt the power supply to the pump.
Connecting a central heating pump
1. Connect the CH pump controller to the connector X2.
Select the type of signal that will be received from the boiler using the rota ry knob SW1 on the PCB. See table below
No. Description
0 Pump modulation signal
1 Required heat output of boiler
2 Current heat output of boiler
3 –
4 –
5 –
6 –
7 –
8 –
9 –
Caution
If possible, use the pump modulation signal. This provides the most accurate pump control. In positions 3 to 9 the control PCB receives no signal from the boiler and the boiler responds as in position 0. If the automatic burner unit does not support pump modulation, the pump will behave as an on/off pump.
Select the type of signal that controls the pump using the rotary knob SW2 on the PCB. See table below.
No. Description
0 0–10 V (Wilo pump)
Fig.75 SCU-X03 PCB
AD-0000061-01
X4
X3
SCU-X03
X2
SW2SW1
X1
Ctrl
0 +
0 +
14 Appendix
84 123157 - v.07 - 10082015
Page 85
No. Description
1 0–10 V (Grundfoss pump)
2 PWM
3 4–20 mA
4 –
5 –
6 –
7 –
8 –
9 –
Caution In positions 4 to 9 the control PCB sends no signal to the pump and the pump will not start up.
14.3.5 Connection options for the PCB (c-Mix)
The c-Mix PCB can control two central heating groups or one central heat ing group and one calorifier. These groups can be controlled entirely inde pendently of one another. It is also possible to use the c-Mix PCB in com bination with one or more boilers in a cascade system.
The connection options for the c-Mix PCB are described in the manual supplied.
14 Appendix
123157 - v.07 - 10082015 85
Page 86
14 Appendix
86 123157 - v.07 - 10082015
Page 87
© Copyright
All technical and technological information contained in these technical instructions, as well as any drawings and technical de scriptions supplied, remain our property and shall not be multiplied without our prior consent in writing. Subject to alterations.
Page 88
Remeha Commercial UK Innovations House 3 Oaklands Business Centre Oaklands Park RG41 2FD Wokingham Tel: +44 (0)118 978 3434 Fax: +44 (0)118 978 6977 Internet: www.remeha.co.uk E-mail: [email protected]
123157 - v.07 - 10082015
123157
Loading...