MODEL : Gas 210 ECO Pro 200
Rated Output kW (80/60°c) :
SBEM Seasonal Efficiency % : GCV(¹)
Rated Output kW (50/30°c) :
Min/Max Gas pressure mbar :
Min/Max Gas pressure mbar :
Gas Connection size BSP :
Noise levels dB(A) at 1 metre :
Resistance @ 11C t mbar :
Resistance @ 20C t mbar :
Nom Flow Rate @ 11 C t l/s :
High Limit Set Point C :
Nom Flow Rate @ 20 C t l/s :
Max operating pressure bar :
Min operating pressure bar :
Condensate Connection mm :
Mass flue gas flow rate kgs/hr :
Air inlet diameter mm I/D :
Maximum counter pressure PA :
On/Off, 0-10v dc
Open Therm
Manual o/ride
Modulating (20 - 100%)
Volt free common alarm
High limit protection
Safety interlock
Hours run indication
For multiple an single boiler control
For further options
Contact our sales team
Second return
Flue damper
1 ¼ “ Bsp (M)
For multiple boiler installation
Pressure sensor
Outside sensor
Flue Sensor
Gas Leak Detection
System pressure sensor
For simple weather compensation
Fits to boiler flue test point
Option connects to gas valve
TECHNICAL SPECIFICATION SHEET
This is a quick reference specification sheet full details can be found in the Gas 210 Pro Installation/Service guide via
www.remeha.co.uk/documents
General Details
Fully condensing floor standing boiler supplied c/w electronic temperature and safety controls.
Sectional cast aluminium heat exchanger. Powder coated, enamel steel casing forming sealed air box. Ultra low NOx,
on/off, high/low or fully modulating (18-100%), pre-mix burner, gas/air ratio control for maximum efficiency and minimum
emissions.) Intelligent "abc®" boiler control system c/w numerical display providing operating and service parameters.
Manufactured to ISO 9001. CE approved and supplied pre-assembled. NOx levels according to EN483 and EN 15420
(EN297 A3)
(¹) In accordance with the Non Domestic Building Services Compliance Guide 2013 Edition – For use in England
(²)(Approx) @ 45°c ΔT = Boiler temp – Ambient temp
(³) See installation and service guide
# Supplied as standard for conventional flue, option for room sealed available.
## For a continuous supply of heat the boiler requires a minimum flow of 30% of the designed flow.
Ours is a policy of continuous development, we therefore reserve the right to alter specifications without prior
notification. Remeha Commercial accept no liability for any loss or damage rising from any errors or omissions
that may be inadvertently contained in this specification sheet.