Regency P95-2 Installation Manual

WARNING: If the information in these instructions are not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.
FOR YOUR SAFETY Do not store or use gasoline or other flammable vapours and liquids in the vicinity of this or any other appliance.
FOR YOUR SAFETY What to do if you smell gas:
Do not try to light any appliance
Do not touch any electrical switch:
do not use any phone in your building.
Immediately call your gas supplier
from a neighbour's phone. Follow the gas supplier's instructions.
If you cannot reach your gas
supplier, call the fire department.
www.excalibur-fire.com
P95-2 Zero Clearance Direct Vent Gas Fireplace
Owners &
Installation Manual
MODELS: P95-NG2 Natural Gas P95-LP2 Propane
Tested by:
918-456
FPI FIREPLACE PRODUCTS INTERNATIONAL LTD. 6988 Venture St., Delta, BC Canada, V4G 1H4
Homeowner: Please keep these instructions for future reference.
Installer: Please complete the details on the back cover
and leave this manual with the homeowner.
09/28/05
To the New Owner:
Congratulations! You are the owner of a st ate-of-the-art Excalibur Gas Fireplace by FPI FIREPLACE PRODUCTS INTERNA TIONAL LTD. The P95-2 is a hand crafted appliance and has been designed to provide you with all the warmth and charm of a wood fireplace at the flick of a switch. The model P95-2 has been approved by Warnock Hersey for both safety and efficiency. As it also bears our own mark, it promises to provide you with economy , comfort and security for many trouble free years to follow. Please t ake a moment now to acquaint yourself with these instructions and the many features of your Excalibur Fireplace.
INFORMATION FOR MOBILE / MANUFACTURED HOMES AFTER FIRST SALE
This Excalibur product has been tested and listed by Warnock Hersey as a Direct Vent Wall Furnace to the following standards: VENTED GAS FIREPLACE HEATERS ANSI Z21.88b-2003/CSA 2.33b-2003 and GAS-FIRED APPLIANCES FOR USE AT HIGH ALTITUDES CAN/CGA 2.17-M91.
This Direct Vent System Appliance must be installed in accordance with the manufacturer's installation instructions and the Manufactured Home Construction and Safety Standard, Title 24 CFR, Part 3280, or the current Standard of Fire Safety Criteria for Manufactured Home Installations, Sites, and Communities ANSI/NFPA 501A, and with CAN/CSA Z240-MH Mobile Home Standard in Canada.
This appliance installation must comply with the manufacturer's installation instructions and local codes, if any. In the absence of local codes follow the current National Fuel Gas Code, ANSI Z223.1 and the current National Electrical Code ANSI/NFPA 70 in the U.S.A., and the current CAN/CGA B149 Gas Installation Code and the current Canadian Electrical Code CSA C22.1 in Canada.
This Excalibur Mobile/Manufactured Home Listed appli­ance comes factory equipped with a means to secure the unit.
This Excalibur Mobile/Manufactured Home listed appliance comes equipped with a dedicated #8 ground lug to which an 18 gauge copper wire from the steel chassis ground must be attached.
This appliance may only be installed in an aftermarket permanently located, manufactured (mobile) home, where not prohibited by local codes.
This appliance is only use with the type of gas indicated on the rating plate. This appliance is not convertible for use with other gases, unless a certified kit is used.
2
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace
TABLE OF CONTENTS
Safety Label
Safety Label............................................................... 4
Installation
Important Message .................................................... 5
Before You Start ........................................................ 5
General Safety Information ......................................... 5
Installation Checklist .................................................. 5
Locating Your Gas Stove............................................ 6
Manufactured Home Additional Requirements ............ 6
Optional HeatWave Duct System ............................... 6
Optional Heat Release Kit .......................................... 6
Clearances................................................................. 6
Combustible Mantel Clearances................................. 7
P95-2 Flat Surround and Tile Kit................................. 7
Unit Base Stand-Offs ................................................. 7
Framing and Finishing................................................ 7
Facing Requirements ................................................. 8
Hearth Requirements ................................................. 8
Optional Cover Plate Template ................................... 9
Unit Assembly Prior to Installation
Top Standoff Assembly........................................ 9
Side Nailing Strips ............................................... 9
Venting Introduction ................................................... 9
Venting: Direct Vent System (Flex)...........................10
Exterior Vent Termination Locations..........................11
Venting: Simpson Dura Vent Direct Vent GS ............12
Venting: Simpson Dura Vent Components List..........13
Venting Arrangements
Horizontal Terminations ......................................14
Horizontal Venting ..............................................15
Vertical Venting ..................................................16
Vertical Terminations..........................................17
Horizontal Installations ..............................................19
Vertical Terminations ................................................21
Venting - Installation Procedures for Direct Vent
System (Flex).....................................................21
System Data.............................................................22
High Elevation ...........................................................22
Gas Line Installation..................................................22
Pilot Adjustment .......................................................22
Gas Pipe Pressure Test ............................................22
SIT Valve Description ................................................22
Conversion to Propane ..............................................23
Optional Brick Panels ...............................................24
Log Set Installation ...................................................24
Glass Door Installation ..............................................26
Front Facade.............................................................26
Optional Screen Door ................................................26
Accent Kit Installation ...............................................27
Remote Control (optional)..........................................28
Remote Wall Switch (optional) ..................................28
Wall Thermostat (optional) ........................................28
Wiring Diagram .........................................................29
Operating Instructions
Operating Instructions ...............................................30
Lighting Procedure ....................................................30
Shutdown Procedure .................................................30
First Fire ...................................................................30
Aeration Adjustment..................................................30
Normal Operating Sounds of
Gas Appliances ..................................................31
Lighting Plate Instructions .........................................31
Maintenance
Maintenance Instructions ..........................................32
General Vent Maintenance........................................32
Gold-Plated or Brass Door or Facade........................32
Log Replacement ......................................................32
Thermopile/Thermocouple .........................................32
Glass Gasket............................................................32
Door Glass................................................................32
Fan Maintenance ......................................................33
Removing Valve.........................................................34
Installing Valve ..........................................................34
Parts List
Replacement/Spare Parts List...................................35
Warranty
Warranty ...................................................................43
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace 3
SAFETY LABEL
This is a copy of the label that accompanies each P95-2 Zero Clearance Direct Vent Gas Fireplace. We have printed a copy of the contents here for your review. The safety label is located on the front inside base of the unit, visible when the bottom louver is open.
NOTE: Excalibur units are constantly being improved. Check the label on the unit and if there is a difference, the label on the unit is the correct one.
For the State of Massachusetts, installation and repair must be done by a plumber or gasfitter licensed in the Commonwealth of Massachusetts.
For the State of Massachusetts, flexible connectors shall not exceed 36 inches in length.
For the State of Massachusetts, the appli­ances individual manual shut-off must be a t-handle type valve.
4
Copy of Safety Decal for P95-2
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
IMPORTANT:
SAVE THESE
INSTRUCTIONS
The P95-NG2 or P95-LP2 Direct Vent Fireplace must be installed in accordance with these in­structions. Carefully read all the instructions in this manual first. Consult the "authority having juris­diction" to determine the need for a permit prior to starting the installation. It is the responsibility of the installer to ensure this fireplace is installed in compliance with manufacturer's instructions and all applicable codes.
BEFORE YOU START
Safe installation and operation of this appliance requires common sense, however, we are required by the Canadian Safety Standards and ANSI Standards to make you aware of the following:
INSTALLATION AND REPAIR SHOULD BE DONE BY A QUALI­FIED SERVICE PERSON. THE AP­PLIANCE SHOULD BE INSPECTED BEFORE USE AND AT LEAST AN­NUALLY BY A PROFESSIONAL SERVICE PERSON. MORE FRE­QUENT CLEANING MAY BE RE­QUIRED DUE TO EXCESSIVE LINT FROM CARPETING, BEDDING MA­TERIAL, ETC. IT IS IMPERATIVE THAT CONTROL COMPART­MENTS, BURNERS AND CIRCULAT­ING AIR PASSAGEWAYS OF THE APPLIANCE BE KEPT CLEAN.
YOUNG CHILDREN SHOULD BE CAREFULLY SUPERVISED WHEN THEY ARE IN THE SAME ROOM AS THE APPLIANCE.
CLOTHING OR OTHER FLAMMA­BLE MATERIAL SHOULD NOT BE PLACED ON OR NEAR THE APPLI­ANCE.
GENERAL SAFETY
INFORMATION
1) The appliance installation must conform
with local codes or, in the absence of local codes, with the current Canadian or Na­tional Gas Codes, CAN1-B149 or ANSI Z223.1 Installation Codes.
2) The appliance when installed, must be electrically grounded in accordance with local codes, or in the absence of local codes with the current National Electrical Code, ANSI/NFPA 70 or CSA C22.1 Cana­dian Electrical Code.
3) See general construction and assembly instructions. The appliance and vent should be enclosed.
4) This appliance must be connected to the specified vent and termination cap to the outside of the building envelope. Never vent to another room or inside a building. Make sure that the vent is fitted as per Venting instructions.
5) Inspect the venting system annually for blockage and any signs of deterioration.
12)Installation and any repairs to this appliance should be done by a qualified service per­son. A professional service person should be called to inspect this appliance annually. Make it a practice to have all of your gas appliances checked annually.
13)Do not slam shut or strike the glass door.
14)Under no circumstances should any solid
fuels (wood, paper, cardboard, coal, etc.) be used in this appliance.
15)The appliance area must be kept clear and free of combustible materials, (gases and other flammable vapours and liquids).
Emissions from burning wood or gas could contain chemicals known to the State of California to cause cancer, birth defects or other reproductive harm.
INSTALLATION
CHECKLIST
1) Locate appliance
a) Room location, page 6 b) Clearances to Combustibles,
pages 6-7. c) Mantle Clearances, page 7 d) Framing & Finishing Requirements,
page 7. e) Facing and Hearth Requirements,
page 8. f ) Venting Requirements, pages 9-17.
2) Assemble Top Standoffs, page 9. (NOTE: must be done before installing unit into fireplace.)
3) Install vent, pages 17-21.
DUE TO HIGH TEMPERATURES, THE APPLIANCE SHOULD BE LO­CATED OUT OF TRAFFIC AND AWAY FROM FURNITURE AND DRAPERIES.
WARNING: FAILURE TO INSTALL THIS APPLIANCE CORRECTLY WILL VOID YOUR WARRANTY AND MAY CAUSE A SERIOUS HOUSE FIRE.
CHILDREN AND ADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATURES, ESPECIALLY THE FIREPLACE GLASS, AND SHOULD STAY AWAY TO AVOID BURNS OR CLOTHING
6) Venting terminals shall not be recessed into
a wall or siding.
7) Any safety glass removed for servicing must be replaced prior to operating the appliance.
8) To prevent injury, do not allow anyone who is unfamiliar with the operation to use the fireplace.
9) Wear gloves and safety glasses for pro­tection while doing required maintenance.
10)Be aware of electrical wiring locations in walls and ceilings when cutting holes for termination.
11)Under no circumstances should this appli­ance be modified. Parts that have to be removed for servicing should be replaced prior to operating this appliance.
4) Make gas and electrical connections. Test the pilot. Must be as per diagram. Page 22.
5) Install brick panels (optional), page 24.
6) Install log set where indicated on
pages 24-25.
7) Install Front Facade, page 26.
8) Install Optional Screen Door, page 26.
9) Install optional Wall Switch, Remote Con-
trol, or Wall Thermostat, page 28.
10)Final check.
Before leaving this unit with the customer, the installer must ensure that the appliance is firing correctly and operation fully explained to
customer.
IGNITION.
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace 5
INSTALLATION
This includes:
1) Clocking the appliance to ensure the cor-
rect firing rate (rate noted on label 45,000 Btu/h) after burning appliance for 15 min­utes.
2) If required, adjusting the primary air to ensure that the flame does not carbon. First allow the unit to burn for 15-20 min. to stabilize.
CAUTION: Any alteration to the product that causes sooting or carboning that results in damage is not the responsibil­ity of the manufacturer.
LOCATING YOUR
GAS STOVE
1) When selecting a location for your stove,
ensure that the clearances outlined on this page are met.
2) Provide adequate clearances for servic­ing.
3) The appliance must be installed on a flat, solid, continuous surface (e.g. wood, met­al, concrete). This may be the floor, or raised up on a platform to enhance its visual impact. If the appliance is going to be in­stalled on carpeting, combustible linoleum tile or other combustible material other than wood flooring, the appliance must be in­stalled on a metal or wood panel extending the full width and depth of the appliance.
4) The P95-2 Direct Vent Gas Fireplace can be installed in a recessed position or framed out into the room as in A, B, C, D. See Diagram 1.
7) We recommend that you plan your installa­tion on paper using exact measurements for clearances and floor protection before actually installing this appliance. Have a qualified inspector, dealer, or installer re­view your plans before installation.
Note: For vent terminations see page
10.
MANUFACTURED
MOBILE HOME
ADDITIONAL
REQUIREMENTS
1) Ensure that structural members are not cut
or weakened during installation.
2) Ensure proper grounding using the #8 ground lug provided. See page 29.
OPTIONAL
DUCT SYSTEM
KIT #946-556
The HeatWave Air Duct Kit increases the effectiveness of your fireplace by dispersing warm air from the fireplace to remote locations in the same room or other rooms in your home.
Up to two kits may be installed on the fireplace. Please Note: Only 1 HeatWave kit may be operated at one time. This includes the internal blower option as well.
CLEARANCES
The clearances listed below are Minimum dis­tances unless otherwise stated:
A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fire­place and vent system be installed only in accordance with these instructions.
Clearance to Combustibles from:
Back 0" (0mm) Side 0" (0mm) Floor 0" (0mm)
NOTE: The minimum floor clearance must be maintained from the top surface of the carpeting, tile, etc.
Side Wall Clearance 6-1/2"(165mm)
Horizontal Vent Clearances
Top 3" Side 2" Bottom 2"
A) Flat on Wall B) Flat on Wall Corner C) Recessed into
Wall/Alcove
D) Corner
Diagram 1
5) This appliance is Listed for bedroom instal­lations when used with a Listed Millivolt Thermostat. Some areas may have further requirements, check local codes before installation.
6) The P95-2 Direct Vent Gas Fireplace is approved for alcove installations, which meet the clearances listed on this page.
6
OPTIONAL
HEAT RELEASE
KIT #946-570
The Heat Release Kit expels warm air from the fireplace to the outside of the building, allowing the fireplace to be operated with less heat entering the room. The kit may be used on either the left or right side.
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace
Vertical Vent Clearances 1-1/4" (32mm)
* see mantle clearance instructions (page 7).
WARNING:
Fire hazard is an extreme risk
if these clearances are not
adhered to.
Clearances for HeatWave and
Heat Release Kit
Heat Release Kit
The HeatWave Duct Kit and the Heat Release Kit have different clearance and framing requirements, check the HeatWave and Heat Release manual for details.
INSTALLATION
COMBUSTIBLE MANTELS
Because of the extreme heat this fire­place emits, the mantel clearances are critical. Combustible mantel clearances from
top of unit are shown in Diagram below.
Note: A non-combustible mantel may
be installed at a lower height if the framing is made of metal studs covered with a non-combustible board.
These drawings are to scale at 1:6 (one inch = 6 inches) Mantel can be installed anywhere in shaded area or higher using the above scale.
Note: Ensure the paint that is used on
the mantel and the facing is "heat resistant" or the paint may discol­our.
P95-2 Flat Wall Surround and Tile Kit
The P95-2 Flat Wall Surround, Hearth Pad and Tile Kit cannot be modified in any way. It must be installed as manufactured.
FRAMING AND
FINISHING
1) Determine the total thickness of facing ma-
terial (e.g. drywall plus ceramic tiles) to allow the finished surface to be flush with the front of the unit. Total facing thickness can vary from 1/2" (13mm) to 1" (32mm) thick.
Install Top Standoffs & Side Nailing Strips before unit is slipped into position. See page 9 for assembly details.
2) Frame in the enclosure for the unit with
framing material. The framed opening is 50-1/8" high x 53-3/8" wide x 21-1/4" deep (1276mm high x 1346mm wide x 533mm deep).
Framing Dimensions
A B C
P95-2 Flat Wall Surround and Tile Kit Specifications
53-3/8" 50-1/8" 21-1/4"
1346mm 1276mm 533mm
UNIT BASE STAND-OFFS
To accommodate varying thicknesses and fin­ishes of hearth materials, we have increased the overall height of the appliance by a further 1 1/8”. This increase is added with the inclusion of two stand-offs at the bottom of the unit, below the outer box, taking the overall height of the framing dimensions from 49” up to 50 1/8”.
In the event that you should choose to use thinner materials to finish the hearth, you can omit the stand-offs provided for raising the unit. However, we recommend that you leave the framing dimensions as they are in the manual and alter only the facing requirement by reduc­ing it by the same distance that you have lowered the unit.
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace 7
Insert the 2 unit base stand-offs underneath the unit as shown in the diagram below. Space the stand-offs centrally, approximately 2 or 2­1/2 feet apart. Ensure that the unit is not unsta­ble.
3) For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate
the fireplace itself.)
INSTALLATION
Fireplace
Stand
No hearth is required when
the unit is raised 3" (76mm) off of the floor surface
Flooring
53-3/4”
48-3/4”
Header
C
L
21-1/8” (533mm)
2-1/4”
4"
2"
Gas connection
on this side
Non-combustible
Material
Combustible
Material
11” dia. hole through wall
for Flex
or for DuraVent
4"
2-7/8”
4) Note: The unit does not have to be com­pletely enclosed in a chase. The clearance on top of the unit is 0" to the standoffs so combustible building materials can be laid directly on top of the standoffs. You must maintain clearance from the vent to com­bustible materials for both rigid and flex, see Vent Clearances, page 6.
Note: 53-3/4" is the minimum height for both flex termination
or Simpson Dura-Vent venting.
The HeatWave Duct Kit has different clearance and framing requirements, check the HeatWave manual for details.
FACING REQUIREMENT
This fireplace requires a non-combustible ma­terial extending from the framing header and sides.
Facing Over 1" (25mm) Thick
If the facing material is over 1" (25mm) thick (example: brick or river rock), install the facing around the perimeter of the face. You may wish to make a face template as shown on the diagram.
FPI offers a cover plate template. See next page.
NOTE: If using a brick hearth, the fireplace will need to be raised to ac­commodate the brick thickness. Example: If the brick is 2" thick, the unit must be raised 1".
HEARTH REQUIREMENTS
Floor Mounted Fireplaces
The flanges on the front face of the fireplace are for a facing thickness of 1" (25mm).
8
Please note that all verti­cal measurements are taken from the base of the unit excluding risers or bottom stand-offs.
Raised Fireplaces
You must take into account the depth of the floor cover­ing (carpet, tile, li­noleum, etc.) when determining the height of the fire­place stand.
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
OPTIONAL COVER PLATE TEMPLATE
1) Ensure top clip screws are at top of oblong
holes before installation.
Oblong Screw
Holes
2) Position bottom of cover plate over pins located at the bottom of the firebox.
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The 2 Top Standoffs must be correctly posi­tioned and attached to the top before unit is slipped into position.
Top Standoff Assembly
The top standoffs are shipped in a flat position and must be folded into shape and attached.
1) Remove the standoffs from the fireplace top.
2) Take each standoff and bend into the cor­rect shape. Bend up at the bend lines until the screw holes in the standoff and the pre­punched screw holes on the fireplace top line up.
3) Attach the standoff securely to the top with 2 screws per standoff (on opposite cor­ners).
Side Nailing Strips
The side nailing strips come attached to the unit. There are 2 plates, one on the top and bottom that can be folded out as required.
Plates can
be folded out.
Pins
3) Bring cover plate towards the unit and hook top clip over and behind the glass frame.
The top clip may need to be adjusted. Loosen the 2 screws that secure the top clip to let the cover plate settle over and behind the glass frame. Once settled tight­en screws.
Top Clip
Back View of
Cover Plate
Pin Holes
TO REMOVE:
1) Remove 2 screws that secure top clip.
Ensure to hold cover plate as it will fall forward.
VENTING
INTRODUCTION
The P95-2 uses the "balanced flue" technology Coaxial system. The inner liner vents products of combustion to the outside while the outer liner draws outside combustion air into the combustion chamber thereby eliminating the need to use heated room air for combustion and losing warm room air up the chimney.
Not e: These flue pipes must not be connected to any other appliance.
The gas appliance and vent system must be vented directly to the outside of the building, and never be attached to a chimney serving a separate solid fuel or gas burning appliance. Each direct vent gas appliance must use it's own separate vent system. Common vent systems are prohibited.
2) Pull out top clip that is still hooked onto glass.
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace 9
INSTALLATION
VENTING
FPI Direct Vent System (Flex) Horizontal Terminations Only
These venting systems, in combination with the P95-2 Direct Vent Gas Fireplace, have been tested and listed as a direct vent heater system by Warnock Hersey. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram on page 11.
FPI Direct Vent (Flex) System Termination Kit (Part # 946-615) includes all the parts needed to install the P95-2 with a maxi­mum run of 4 feet.
1) 8" dia. flexible liner (4 ft. length)
2) 5" dia. flexible liner (4 ft. length)
3) spring spacers (4)
4) thimble (2)
5) AstroCap XL termination cap (1)
6) screws (12)
7) tube of Mill Pac (1)
8) plated screws (8)
9) screws #8 x 1-1/2" Drill Point, Stainless
Steel (4)
10)vinyl siding standoff
If longer runs are needed, the FPI Direct Vent system (Flex) kit is (Part # 946-616) which includes all the parts needed to install the P95-2 with a maximum 10' run.
1) 8" dia. flexible liner (10 ft. length)
2) 5" dia. flexible liner (10 ft. length)
3) spring spacers (7)
4) thimble (2)
5) AstroCap XL termination cap (1)
6) screws (12)
7) tube of Mill Pac (1)
8) plated screws (8)
9) screws #8 x 1-1/2" Drill Point, Stainless
Steel (4)
10)vinyl siding standoff
10
Notes:
1) Liner sections should be continuous without any joints or seams.
2) Only Flex pipe purchased from FPI may be used for Flex installations.
3) Horizontal vent must be supported every 3 feet.
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
.
B
B
B
B
A
C
V
V
V
V
V
V
V
A
A
V
Fixed
Fixed
Openable
Closed
Closed
Openable
N
L
B
E
B
M
D
F
K
H
j
Vertical
Termination
V
Vent terminal
Area where terminal is not permited
A
Air supply outlet
24"
V
A
G
Inside
corner detail
V
24"
18"
Vertical
Termination
EXTERIOR VENT TERMINATION LOCATIONS
the centerline of the regulator.
any other appliance *(12"/30cm)
*(min. 84"/2.1m)
H = Not to be installed above a meter/regulator assembly within (3'/90cm) horizontally from
J= Clearance to service regulator vent outlet *(min 36"/90cm)
K= Clearance to non-mechanical air supply inlet to building or the combustion air inlet to
L= Clearance to a mechanical air supply inlet *(min. 72"/1.8m)
M= Clearance above paved sidewalk or a paved driveway located on public property
N= Clearance under veranda, porch, deck, or balcony *(min. 12"/30cm)
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace 11
distance of (24"/60cm) from the centerline of the terminal (min. 18"/46cm) check with
local code.
Vent Termination Cap (14"/36cm)
Vent Termination Cap (12"/30cm)
A= Clearance above grade, veranda, porch, deck, or balcony *(min. 12"/30cm)
B= Clearance to window or door that may be opened *(12"/30cm)
C= Clearance to permanently closed window *(min. 12"/30cm)
D= Vertical clearance to ventilated soffit located above the terminal within a horizontal
E= Clearance to unventilated soffit (min. 18"/45cm)
F= Clearance to outside corner: with AstroCap Termination Cap (min 6"/15cm), with Dura-
G= Clearance to inside corner: with AstroCap Termination Cap (min 6"/15cm), with Dura-
Note:
- A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.
- Only permitted if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.
- If the vent termination is accessible, a certified guard shall be installed.
* As specified in CGA B149 Installation Code. Note: Local codes or regulations may require different clearances.
INSTALLATION
SIMPSON DURA-VENT VENTING
The Simpson Dura-Vent Direct Vent System offers a complete line of component parts for installation of both horizontal and vertical installations. Many items are offered in decorative black, as well as galvanized finish. We recommend using the galvanized finish for installation with the P95-2.
The minimum components required for a basic horizontal termination are:
1 Horizontal Termination Cap 190o Elbow 1 Flue Adaptor 1 Wall Thimble 1 Length of pipe to suit wall thickness
(see chart)
Wall thickness is measured from the back standoffs to the inside mounting surface of termination cap. For siding other than vinyl furring strips may be used, instead of the vinyl siding standoff, to create a level surface to mount the vent terminal. The Terminal must not be recessed into siding. Measure the wall thickness including furring strips.
If a Vinyl Siding Standoff is required (it must be used with vinyl siding), measure to outside surface of wall without siding and add 2 inches.
Wall Thickness Vent Length
(inches) Required (inches)
3-1/4" - 6-3/4" 11" - 14-5/8" Adj. Pipe 7-3/4" - 16-1/4" 17" - 24" Adj. Pipe 7-1/4" - 8-3/4" 6" + 12"
Horizontal and Vertical Terminations for 5" x 8" Venting
(inches) Required (inches)
Flat Wall Installation
Wall Thickness Vent Length
4" - 5-1/2" 6" 7" - 8-1/2" 9"
10" - 11-1/2" 12"
9" - 14-1/2" 11" - 14-5/8" Adj. Pipe
15" - 23-1/2" 17" - 24" Adj. Pipe
Corner Installation
9" + 9"
4-1/4" - 5-3/4" 6" + 9"
12
Simpson
Dura-Vent
Direct Vent GS
Alternate Horizontal
Termination Cap
The FPI AstroCap XL FPI venting systems as well as Simpson Dura-Vent® and Direct Vent GS.
The FPI AstroCap XLTM is a proprietary trademark of FPI Fireplace Products International Ltd.
Dura-Vent® and Direct Vent GS are registered and/or proprietary trademarks of Simpson Dura-Vent Co. Inc.
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace
TM
is certified for installations using
SIMPSON DURA-VENT VENTING COMPONENTS LIST
All Simpson Dura-Vent components are available directly from FPI.
5" x 8" Description 5" x 8" Description
INSTALLATION
1208 6" Pipe Length 1208B 6" Pipe Length, Black 1207 9" Pipe Length 1207B 9" Pipe Length, Black 1206 12" Pipe Length 1206B 12" Pipe Length, Black 1204 24" Pipe Length 1204B 24" Pipe Length, Black 1203 36" Pipe Length 1203B 36" Pipe Length, Black 1202 48" Pipe Length 1202B 48" Pipe Length, Black 1211 11" to 14-5/8" Pipe, Adjustable 1211B 11" to 14-5/8" Pipe, Adjustable, Black 1217 17" to 24" Pipe, Adjustable 1217B 17" to 24" Pipe, Adjustable, Black 1245 45 1245B 45 1245G 45 1245BG 45 1290 90 1290B 90 1290G 90 1290BG 90
o
Elbow
o
Elbow, Black
o
Elbow, Swivel
o
Elbow, Black, Swivel
o
Elbow
o
Elbow, Black
o
Elbow, Swivel
o
Elbow, Black, Swivel
1240 Round Ceiling Support/Wall Thimble Cover 1241 Cathedral Ceiling Support Box Brass Trim for Wall Thimble/
Ceiling Support 1247 Wall Thimble (only required in Canada) 1243 Flashing, 0/12 to 6/12 Roof Pitch 1243S Flashing, 7/12 to12/12 Roof Pitch 1242 Wall Firestop 1253 Storm Collar 1263 Ceiling Firestop 1288 Wall Strap 1281 Snorkel Termination (36") 1282 Snorkel Termination (14") 1284 Horizontal Square Termination 1285 Horizontal Square Termination, High Wind 1291 Vertical Termination, High Wind N/A Extended Vertical Termination 1250 Vinyl Siding Standoff
Parts not supplied by Dura-Vent
770-994 Dura-Vent Flue Adaptor
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace 13
INSTALLATION
VENTING ARRANGEMENTS - HORIZONTAL TERMINATIONS
SIMPSON DURA-VENT DIRECT VENT GS SYSTEM and
FPI DIRECT VENT SYSTEM (FLEX)
(Propane & Natural Gas)
The diagram shows all allowable combinations of vertical runs with horizontal terminations, using one 90o elbow (two 45o elbows equal one 90 elbow).
Simpson Dura-Vent 5" inner diameter 8" outer diameter
Note: Must use optional flue adapter (Part # 770-994)
when using Simpson Dura-Vent pipe.
Regency Flex Vent 5" inner diameter 8" outer diameter
Note: FPI Direct Vent System (Flex) is only approved
for horizontal terminations.
o
Maintain clearances to combustibles as listed on pages 6 to 8.
Horizontal vent must be supported every 3 feet.
Firestops are required at each floor level and whenever passing through a wall.
14
Excalibur P95-2 Zero Clearance Direct Vent Gas Fireplace
A vent guard should be used whenever the termination is lower than the specified minimum or as per local codes.
Please note that all vertical measurements are taken from the base of the unit excluding risers or bottom stand-offs.
Loading...
+ 30 hidden pages