Maximum Input51,000 BTU/h (14.94 kW)48,000 BTU/h (6.30 kW)
Vent Sizing5” Inner / 8” Outer5” Inner / 8” Outer
Approved Venting Systems
Flex Vent Systems:FPI AstroCap™ Flex Vent
Rigid Pipe Vent Systems:Simpson Dura-Vent® Direct Vent GS
B
A
Gas Fireplaces
DC
A
Unit DimensionsDescriptionP33
AFront Face Width48” (1219mm)
BRear Firebox Width34-1/2” (876mm)
CFront Face Height41” (1041mm)
DHeight w/ Standoff47” (1193mm)
EUnit Depth23-1/4” (324mm)
FFirebox Height40” (1016mm)
Framing Dimensions DescriptionP33
GFraming Width48-1/2” (1232mm)
H***Framing Height***47-1/2” (1207mm)***
IFraming Depth
JCorner Wall Length57-5/8 ” (1464mm)
KCorner Facing Wall Width81-1/2” (2070mm)
LFramed Chase Ceiling
MVent Centerline Height43” (1092mm)
NGas Connection Height2” (51mm)
OGas Connection Inset3-3/4” (95mm)
PGas Connection Width5” (127mm)
Important: Framing height requires consideration of the hearth
***
depth. Dimension H = H + the thickness of installed hearth.
29-3/4” (756mm) Vertical Rise
26-1/4” (667mm) No Vertical Rise
50” (1270mm) No Vertical Rise
E
N/A - Vertical Rise
F
Please refer to Page 11 (Exterior Vent Terminations)
for additional guidelines on vent locations.
61June 2007 Regency Product Specifi cations Book
P48 Gas Fireplace
Framing and Finishing
1) Determine the total thickness of facing material (e.g. drywall plus
ceramic tiles) to allow the fi nished surface to be fl ush with the front
of the unit. Total facing thickness can vary from 1/2” (13mm) to 1-¼”
(32mm) thick.
2) Frame in the enclosure for the unit with framing material.
Gas Fireplaces
3) For exterior walls, insulate the enclosure to the same degree as
the rest of the house, apply vapor barrier and drywall, as per local
installation codes. (Do not insulate the fi replace itself.)
4) The top of the unit must not be closer than 39” (990mm) to the
ceiling.
5) Combustible material may be brought up to the top and
sides of the unit and be covered with ceramic tiles, bricks,
rock or other suitable combustible finishing materials.
Note: The unit does not have to be completely enclosed in a
chase. The clearance on top of the unit is 0” to the standoffs
so combustible building materials can be laid directly on top
of the standoffs. You must maintain proper clearances from
the vent to combustible materials (See Below).
6) Use metal studs for framing where the minimum clearance from
the vent to combustible material cannot be maintained.
Clearance Requirements
Gas Fireplaces
Vent ClearancesClearance Dimension
Horizontal - Top2-1/2” (64mm)
Horizontal - Side1-1/2” (38mm)
Horizontal - Bottom1-1/2” (38mm)
Vertical1-1/4” (32mm)
Failure to maintain required clearances is a major cause of
chimney related fi res. Installation of this fi replace must comply
with these clearances.
Combustible Mantels
Because of the extreme heat this fi replace emits, the mantel
clearances are critical. Combustible mantel clearances from top of
the louvers are shown in the diagram below. Mantel may be installed
anywhere in the shaded area or higher.
WARNING
Mantel Clearances
12
64810
12" (305mm)
0
2
D
C
A
F
B
B
E
Clearance:DimensionMeasured From:
A: Mantel Height8” (203mm)Minimum (Additional on this page)
B: Sidewall6” (152mm)Side of installed front
C: Ceiling36” (914mm)Top of installed unit
D: Mantel Depth12” (305mm)Maximum (Additional on this page)
E: Alcove Width60” (1524mm)Sidewall to Sidewall (Minimum)
F: Alcove Depth36” (914mm)Front to back wall (Maximum)
Top of Hearth must not be higher than the base of the fi rebox.
Note: If desired a non-combustible mantel may be installed at a
lower height.
Note: Ensure the paint that is used on the mantel and the facing
is “heat resistant” or the paint may discolour.
Mantel Leg Clearances
Combustible mantel leg clearances as per diagram below:
Clearances are from the fi nished edge of the unit
Side Wall (Min 6”)
P48
Maximum
1-½” projection at 3”
minimum clearance.
Mantel leg
1-1/2"
3”
6”
Allowable mantel leg
projection.
Mantel leg
3”
62June 2007 Regency Product Specifi cations Book
Alternate Snorkel
Termination Cap
Part #1282 (14”)
Part #1281 (36”)
Gas Fireplaces
Regency Direct Vent System (Flex)
Horizontal Terminations Only
These venting systems, in combination with the P48 Direct Vent Gas
Fireplace, have been tested and listed as a direct vent heater system
by Warnock Hersey. The location of the termination cap must conform
to the requirements in the Vent Terminal Locations diagram.
FPI Direct Vent (Flex) System Termination Kits include all the parts
needed to install the P48 using a fl exible vent.
1) Liner sections should be continuous without any joints or seams.
2) Only Flex pipe purchased from Regency may be used for Flex
installations.
3) Horizontal sections must be supported every 3 feet.
2) 4” fl exible liner (Kit length)
3) spring spacers (3)
4) thimble (2)
5) AstroCap termination cap (1)
6) screws (12)
7) tube of Mill Pac (1)
8) plated screws (8)
9) S.S. screws #8 x 1-1/2” drill point, (4)
10) vinyl siding standoff
AstroCap XL
(Part# 946-623/P)
Vinyl Siding
Standoff
Wall Thimble
P48 Gas Fireplace
Snorkel Terminations
Gas Fireplaces
Snorkel Terminations:
For installations requiring a vertical rise on the exterior of the building, 14inch and 36-inch tall Snorkel Terminations are available. Follow the same
installation procedures as used for standard Horizontal Termination.
NEVER install the snorkel upside down.
Dura-Vent
Snorkel
Min. 12"*
(305mm)
Below Grade Snorkel Installation (Dura-Vent Only)
If the Snorkel Termination must be installed below grade, i.e. basement
application, proper drainage must be provided to prevent water from
entering the Snorkel Termination. Refer to Rigid Pipe Installation
instructions for details. Do not attempt to enclose the Snorkel within the
wall, or any other type of enclosure.
5” dia.
Flue pipe
8" dia.
Flue pipe
Spring Spacer
Alternate Horizontal
Termination Caps
If required by the external termination location the listed
alternate termination caps may be used. (Refer to Page 11)
Dura-Vent
Snorkel
Adequate
drainage
Gravel
Window
Well
(305mm)
Min. 12"*
63June 2007 Regency Product Specifi cations Book
Loading...
+ 4 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.