Quadra-Fire GARN-DMBK-IPI-B, GARN-DCSB-IPI-B, GARN-MBK-IPI-B, GARN-DPMH-IPI-B Installation Manual

Page 1
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/151
Installation Manual
Installation and Appliance Setup
INSTALLER: Leave this manual with party responsible for use and operation. OWNER: Retain this manual for future reference.
This appliance may be installed as an OEM installation in manufactured home (USA only) or mobile home and must be installed in accordance with the manufacturer’s instructions and the manufactured home construction and safety standard, Title 24 CFR, Part 3280 or Standard
for Installation in Mobile Homes, CAN/CSA Z240MH, in Canada.
This appliance is only for use with the type(s) of gas indicated on the rating plate.
In the Commonwealth of Massachusetts installation must
be performed by a licensed plumber or gas tter.
See Table of Contents for location of additional
Commonwealth of Massachusetts requirements.
- DO NOT store or use gasoline or other ammable vapors and liquids in the vicinity of this or any other
appliance.
- What to do if you smell gas
DO NOT try to light any appliance.
DO NOT touch any electrical switch; do not use any
phone in your building.
• Leave the building immediately.
• Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions.
• If you cannot reach your gas supplier, call the re
department.
- Installation and service must be performed by a qualied installer, service agency, or the gas supplier.
Models:
GARN-MBK-IPI-B
GARN-DPMH-IPI-B
GARN-DMBK-IPI-B
GARN-DCSB-IPI-B
NOTICE: DO NOT discard this manual!
R
WARNING: If the information in these instructions
is not followed exactly, a re or explosion may result
causing property damage, personal injury, or death.
!
HOT GLASS WILL CAUSE BURNS.
DO NOT TOUCH GLASS UNTIL COOLED.
NEVER ALLOW CHILDREN TO TOUCH GLASS.
A barrier designed to reduce the risk of burns from the hot viewing glass is provided with this appliance and shall be installed for the protection of the children and other at-risk
individuals.
!
DANGER
Solitaire Cabinet
Page 2
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/152
Safety Alert Key:
 DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.  WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.  CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.  NOTICE: Used to address practices not related to personal injury.
Table of Contents
Installation Standard Work Checklist ....................3
1 Product Specic and Important Safety Information
A. Appliance Certication ............................4
B. Glass Specications ..............................4
C. BTU Specications ...............................4
D. High Altitude Installations ..........................4
E. Non-Combustible Materials Specication. . . . . . . . . . . . . . 4
F. Combustible Materials Specication .................4
G. Electrical Codes .................................4
H. Requirements for the Commonwealth of Massachusetts . . 5
2 Getting Started
A. Design and Installation Considerations ............... 6
B. Tools and Supplies Needed ........................6
C. Inspect Appliance and Components .................. 6
3 Framing and Clearances
A. Appliance Dimension Diagram ...................... 7
B. Clearances to Combustibles .......................8
C. Hearth Extension/Floor Protection ...................8
4 Termination Location and Vent Information
A. Vent Termination Minimum Clearances ............... 9
B. Chimney Diagram. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
C. Approved Pipe ................................. 11
D. Use of Elbows .................................12
E. Measuring Standards ............................12
F. Venting Guidelines for Horizontal Runs ..............13
G. Vent Diagrams ................................. 13
5 Vent Clearances and Framing
A. Pipe Clearances to Combustibles .................. 25
B. Wall Penetration Framing/Firestops .................25
C. Ceiling Firestop/Floor Penetration Framing ...........26
D. Install Attic Insulation Shield ....................... 26
6 Appliance Preparation
A. Leveling the Appliance ...........................27
7 Venting and Chimneys
A. Assemble Vent Sections. . . . . . . . . . . . . . . . . . . . . . . . . . 28
B. Assemble Slip Sections ..........................29
C. Secure the Vent Sections .........................30
D. Disassemble Vent Sections .......................30
E. Vertical Termination Requirements .................. 32
F. Horizontal Termination Requirements ...............34
8 Electrical Information
A. General Information .............................36
B. Wiring Requirements ............................37
9 Gas Information
A. Fuel Conversion ................................42
B. Gas Pressure .................................. 42
C. Gas Connection ................................42
D. High Altitude Installations ......................... 42
E. Air Shutter Setting .............................. 43
10 Appliance Setup
A. Remove Fixed Glass Assembly .................... 44
B. Remove the Shipping Materials .................... 44
C. Clean the Appliance ............................. 44
D. Install the Log Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . 45
E. Install Fixed Glass Assembly ...................... 46
F. Adjust Flue Restrictor ............................46
11 Reference Materials
A. Vent Components Diagrams ......................47
B. Accessories ................................... 53
= Contains updated information.
Table of Contents
Page 3
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/153
Installation Standard Work Checklist
Customer: Lot/Address:
Model (circle one): GARN-MBK-IPI-B GARN-DPMH-IPI-B GARN-DMBK-IPI-B GARN-DCSB-IPI-B
Date Installed: Location of Stove: Installer: Dealer/Distributor Phone #
Serial #:
Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed _____________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________
Comments Communicated to party responsible ____________________ by ______________________on ___________ (Builder / Gen. Contractor/) (Installer) (Date)
Appliance Install YES IF NO, WHY?
Veried combustible or non-combustible clearances to walls. (Pg. 8) ___________________________ Stove is installed level. (Pg. 26) ___________________________
Venting/Chimney Section 7 (Pg 27-34)
Venting conguration complies with allowable vent requirements. ___________________________ Venting installed, locked and secured in place with proper clearance. ___________________________ Interior/Exterior restops installed and sealed. ___________________________
Attic insulation shield installed. ___________________________
Exterior wall/Roof ashing installed and sealed. ___________________________ Terminations/Roof ashing installed and sealed. ___________________________
Electrical Section 8 (Pg 35-39)
Unswitched power (110-120 VAC) provided for the appliance. ___________________________ Switch wires properly installed. ___________________________
Gas Section 9 (Pg 40-41)
Appliance conguration matches fuel type. ___________________________
Was a conversion performed? ___________________________
Leak check performed and inlet/outlet pressure veried. ___________________________ Set air shutter for optimal ame appearance. ___________________________
Appliance Setup Section 10 (Pg 42-44)
All packaging and protective materials are from removed inside/under/on
the appliance). ___________________________
Logs and embers installed correctly. ___________________________
Glass assembly installed and secured. ___________________________ Accessories installed properly. ___________________________
Manual bag and all of its contents are removed from inside/under the appliance and given to party responsible for use and operation. ___________________________ Started appliance and veried no gas leaks exist. ___________________________
2345-985_R1 4/15
= Contains updated information.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your le.
• That this checklist remain visible at all times on the appliance until the installation is complete.
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this
installation manual.
WARNING! Risk of Fire or Explosion! Failure to install appliance according to these instructions can
lead to a re or explosion.
ATTENTION INSTALLER:
Follow this Standard Work Checklist
Page 4
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/154
B. Glass Specications
This appliance is equipped with 5 mm ceramic glass. Replace glass only with 5 mm ceramic glass. Please contact your dealer for replacement glass.
C. BTU Specications
This product is listed to ANSI standards for “Vented Gas Fireplace Heaters” and applicable sections of “Gas Burning Heating Appliances for Manufactured Homes and Recreational Vehicles”, and “Gas Fired Appliances for Use at High Altitudes”.
NOTICE: This installation must conform with local codes. In the absence of local codes you must comply with the National Fuel Gas Code, ANSI Z223.1- latest edition in the U.S.A. and the CAN/CGA B149 Installation Codes in Canada.
A. Appliance Certication
NOT INTENDED FOR USE AS A PRIMARY HEAT SOURCE.
This appliance is tested and approved as either supplemental
room heat or as a decorative appliance. It should not be factored as primary heat in residential heating calculations.
1
Product Specic and Important Safety Information
MODELS: GARN-MBK-IPI-B, GARN-DPMH-IPI-B,
GARN-DMBK-IPI-B, GARN-DCSB-IPI-B
LABORATORY: Underwriters Laboratories, Inc. (UL)
TYPE: Direct Vent Heater
STANDARD: ANSI Z21.88-2014/CSA 2.33-2014
D. High Altitude Installations
NOTICE: If the heating value of the gas has been reduced, these rules do not apply. Check with your local gas utility or authorities having jurisdiction.
When installing above 2000 feet elevation:
• In the USA: Reduce input rate 4% for each 1000 feet above 2000 feet.
• In CANADA: Input ratings are certied without a reduction
of input rate for elevations up to 4500 feet (1370 m)above
sea level. Please consult provincial and/or local authorities having jurisdiction for installations at elevations above 4500 feet (1370 m).
Check with your local gas utility to determine proper orice size.
E. Non-Combustible Materials Specication
Material which will not ignite and burn. Such materials are
those consisting entirely of steel, iron, brick, tile, concrete,
slate, glass or plasters, or any combination thereof.
Materials that are reported as passing ASTM E 136,
Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 ºC shall be considered non-
combustible materials.
F. Combustible Materials Specication
Materials made of or surfaced with wood, compressed paper,
plant bers, plastics, or other material that can ignite and burn, whether ame proofed or not, or plastered or unplastered shall be considered combustible materials.
G. Electrical Codes
NOTICE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA
70-latest edition or the Canadian Electric Code CSA C22.1.
• A 110-120 VAC circuit for this product must be protected
with ground-fault circuit-interrupter protection, in compliance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near
sinks.
Models
(U.S. or Canada)
Maximum
Input
BTU/h
Minimum
Input
BTU/h
Orice
Size
(DMS)
AFUE
State
Steady
Efciency %
P4 %
GARN-MBK-IPI-B GARN-DPMH-IPI-B GARN-DMBK-IPI-B GARN-DCSB-IPI-B
(NG)
(0-2000 FT) 14,500 10,500 49 68.6% 63% 62%
GARN-MBK-IPI-B GARN-DPMH-IPI-B GARN-DMBK-IPI-B GARN-DCSB-IPI-B
(LP)
(0-2000 FT) 13,000 9,750 57 69.4% 63% 62%
Page 5
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/155
H. Requirements for the Commonwealth of
Massachusetts
For all side wall horizontally vented gas fueled equipment
installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where
the side wall exhaust vent termination is less than seven (7) feet above nished grade in the area of the venting,
including but not limited to decks and porches, the following
requirements shall be satised:
Installation of Carbon Monoxide Detectors
At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gas tter shall observe that a hard wired carbon monoxide detector
with an alarm and battery back-up is installed on the
oor level where the gas equipment is to be installed. In addition, the installing plumber or gas tter shall observe that a battery operated or hard wired carbon monoxide
detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side
wall horizontal vented gas fueled equipment. It shall be the
responsibility of the property owner to secure the services
of qualied licensed professionals for the installation of hard wired carbon monoxide detectors.
In the event that the side wall horizontally vented gas fueled
equipment is installed in a crawl space or an attic, the hard
wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent oor level.
In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said
thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
Approved Carbon Monoxide Detectors
Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certied.
Signage
A metal or plastic identication plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) in. in size, “GAS VENT DIRECTLY
BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
Note: The following requirements reference various
Massachusetts and national codes not contained in this
document.
Inspection
The state or local gas inspector of the side wall horizontally
vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes
carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.
Exemptions
The following equipment is exempt from 248 CMR 5.08(2)
(a)1 through 4:
• The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and
• Product Approved side wall horizontally vented gas fueled
equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part
for residential purposes.
MANUFACTURER REQUIREMENTS
Gas Equipment Venting System Provided
When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting
system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
• Detailed instructions for the installation of the venting
system design or the venting system components; and
• A complete parts list for the venting system design or venting system.
Gas Equipment Venting System NOT Provided
When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the ue gases, but identies “special venting systems”, the following requirements shall be satised by the manufacturer:
• The referenced “special venting system” instructions shall
be included with the appliance or equipment installation instructions; and
• The “special venting systems” shall be Product Approved
by the Board, and the instructions for that system shall
include a parts list and detailed installation instructions.
A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all
venting instructions, all parts lists for venting instructions,
and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
See Gas Connection section for additional Commonwealth of Massachusetts requirements.
Page 6
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/156
2
Getting Started
A. Design and Installation Considerations
Heat & Glo direct vent gas appliances are designed to
operate with all combustion air siphoned from outside of the
building and all exhaust gases expelled to the outside. No additional outside air source is required.
Installation MUST comply with local, regional, state and
national codes and regulations. Consult insurance carrier, local building inspector, re ofcials or authorities having jurisdiction over restrictions, installation inspection and permits.
Before installing, determine the following:
• Where the appliance is to be installed.
• The vent system conguration to be used.
• Gas supply piping requirements.
• Electrical wiring requirements.
• Whether optional accessories—devices such as a fan or remote control—are desired.
C. Inspect Appliance and Components
• Carefully remove the appliance and components from the packaging.
• The vent system components and optional accessories may be shipped in separate packages.
• If packaged separately, the log set must be installed.
• Report to your dealer any parts damaged in shipment, particularly the condition of the glass.
Read all of the instructions before starting the
installation. Follow these instructions carefully during the installation to ensure maximum safety
and benet.
WARNING! Risk of Fire or Explosion! Damaged parts could impair safe operation. DO NOT install damaged, incomplete or substitute components. Keep appliance dry.
B. Tools and Supplies Needed
Before beginning the installation be sure that the following
tools and building supplies are available.
Tape measure Framing material
Pliers Hammer
Phillips screwdriver Manometer
Gloves Framing square
Voltmeter Electric drill and bits (1/4 in.)
Plumb line Safety glasses
Level Reciprocating saw
Flat blade screwdriver
Non-corrosive leak check solution
1/2 - 3/4 in. length, #6 or #8 Self-drilling screws
Caulking material (300 ºF minimum continuous exposure
rating)
One 1/4 in. female connection (for optional fan).
Hearth & Home Technologies disclaims any responsibility for,
and the warranty will be voided by, the following actions:
• Installation and use of any damaged appliance or vent system component.
• Modication of the appliance or vent system.
• Installation other than as instructed by Hearth & Home Technologies.
• Improper positioning of the gas logs or the glass door.
• Installation and/or use of any component part not approved by Hearth & Home Technologies.
Any such action may cause a re hazard.
WARNING! Risk of Fire, Explosion or Electric Shock! DO NOT use this appliance if any part has been under water.
Call a qualied service technician to inspect the appliance
and to replace any part of the control system and/or gas control which has been under water.
Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. For assistance or additional information, consult a qualied service technician, service agency or your dealer.
Installation and service of this appliance should be
performed by qualied personnel. Hearth & Home Technologies suggests NFI certied or factory trained professionals, or technicians supervised by an NFI certied professional (www.ncertied.org).
Page 7
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/157
3
Framing and Clearances
A. Appliance Dimension Diagram
Dimensions are actual appliance dimensions. Use for reference only.
Figure 3.1 Appliance Dimensions
Location Inches Millimeter Location Inches Millimeter
A 17-7/8 454 E 18-1/8 451
B 15-3/8 391 F 17-3/8 441
C 23-5/8 600 G 18-1/4 464
D 8-15/16 227 H 14-1/4 362
NOTE: Side view diagram show gas appliance equipped with optional blower, Part # BK-GAS
GAS
LINE
ELECTRICAL
CORD
SIDE
BACK
FRONT
TOP
E
D
C
F
A
B
H
G
Page 8
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/158
B. Clearances to Combustibles
When selecting a location for the appliance it is important to
consider the required clearances to walls. See Figure 3.2.
WARNING! Risk of Fire or Burns! Provide adequate clearance around air openings and for service access. Due to high temperatures, the appliance should be located out of
trafc and away from furniture and draperies.
NOTICE: Illustrations reect typical installations and are FOR DESIGN PURPOSES ONLY. Illustrations/diagrams are not
drawn to scale. Actual installation may vary due to individual design preference.
NOTICE: Some carpet materials may be sensitive to radiant heat from the appliance causing discoloration or odor.
Figure 3.2 Appliance Locations
A
B
F
E
A
"A"
measurement is from stove top, not side
or *B
D* G*
H
G**
D**
EXTERIOR WALL
CEILING
C
C
or *C
or *C
A
G*
A
G**
C. Hearth Extension/Floor Protection
CAUTION! Risk of Fire or Injury! Install appliance on
a stable, level, platform or oor strong enough to support
appliance without tipping.
A non-combustible hearth pad is not required. However,
the floor beneath the appliance must be stable, level, and strong enough to support the appliance without a tipping
hazard. It is permissible to place the appliance on carpet.
NOTE: Flooring beneath appliance may reach 90° plus room ambient temperature. Check with flooring manufacturer for maximum temperature allowed on flooring surfaces.
Note: Dimensions are minimums as shown and may not be typical for all applications. An alcove installation is shown above on left.
Note: If optional BK-GAS fan kit is desired, appliance should be changed to *B or *C dimensions.
Alcove Installation
Model A B *B C *C D* D** E F G* G** H
GARN-MBK-IPI-B GARN-DPMH-IPI-B GARN-DMBK-IPI-B GARN-DCSB-IPI-B
Inches
6 2 5 2 5 55-1/4 43 36 30 32-1/2 20-1/4 3
Millimeters
152 51 127 51 127 1403 1092 762 762 826 514 76
D* and G*= Vented with minimum vertical pipe as shown. D** and G**= Horizontally vented, no vertical component.
Page 9
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/159
A. Vent Termination Minimum Clearances
Roof Pitch H (Min.) Ft.
Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5*
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0
* 3 foot minimum in snow regions
Figure 4.1 Minimum Height From Roof To Lowest Discharge Opening
HORIZONTAL
OVERHANG
VERTICAL
WALL
GAS DIRECT VENT TERMINATION CAP
12
X
ROOF PITCH
IS X/ 12
LOWEST
DISCHARGE
OPENING
2 FT.
MIN.
20 INCHES MIN.
H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING
4
Termination Location and Vent Information
Fire Risk.
Maintain vent clearance to combustibles as
specied.
DO NOT pack air space with insulation or other materials.
Failure to keep insulation or other materials away from vent pipe may cause overheating and re.
Figure 4.2 Staggered Termination Caps
Gas, Wood or Fuel Oil
Termination Cap
B
Gas
Term
ination
Cap **
A *
*
If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.
**
A B
6 in. (minimum) up to 20 in.
152 mm/508 mm
18 in. minimum
457 mm
20 in. and over 0 in. minimum
In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.
WARNING
!
Page 10
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1510
B. Chimney Diagram
Figure 4.3 Minimum Clearances for Termination
A = 12 inches.................clearances above grade, veranda,
porch, deck or balcony
B = 12 inches.................clearance to window or door that may
be opened, or to permanently closed window
C = 18 inches.................clearance below unventilated soft
18 inches.................clearance below ventilated soft
30 inches .................clearance below vinyl soffits and
electrical service
D = 9 inches...................clearance to outside corner
E = 6 inches...................clearance to inside corner
F = 3 ft. (Canada) ..........not to be installed above a gas
meter/regulator assembly within 3 feet
horizontally from the center-line of the
regulator
G = 3 ft ...........................clearance to gas service regulator vent
outlet
H = 12 inches.................clearance to non-mechanical
(unpowered) air supply inlet,
combustion air inlet or direct-vent
termination
i = 3 ft. (U.S.A.)
6 ft. (Canada) ...........clearance to a mechanical (powered)
air supply inlet
All mechanical air intakes within 10 feet of a termination cap must
be a minimum of 3 feet below termination.
J = 7 ft. ......................... On public property: clearance above
paved sidewalk or a paved driveway.
A vent shall not terminate directly above a sidewalk or paved
driveway which is located between two single family dwellings and
serves both dwellings.
C
J
B
D
B
F
B
A
E
V
V
V
V
V
V
M
H or i
V
G
X
V
H
A
V
V
H
X
= AIR SUPPLY INLET
V
= VENT TERMINAL
= AREA WHERE TERMINAL IS NOT PERMITTED
O
N
P
R
Q
Electrical
Service
V
K
V
K
V
L
C
V
Q
MIN
R
MAX
1 cap 3 feet 2 x Q
ACTUAL
2 caps 6 feet 1 x Q
ACTUAL
3 caps 9 feet 2/3 x Q
ACTUAL
4 caps 12 feet 1/2 x Q
ACTUAL
Q
MIN
= # termination caps x 3 R
MAX
= (2 / # termination caps) x Q
ACTUAL
Covered Alcove Applications
(Spaces open only on one side and with an overhang)
N = 6 inches ........... non-vinyl sidewalls
12 inches ......... vinyl sidewalls
O = 18 inches ......... non-vinyl soft and overhang
42 inches ......... vinyl soft and overhang
P = 8 ft.
Measure horizontal clearances from this surface.
Measure vertical clearances from this surface.
CAUTION! Risk of Burns! Termination caps are HOT, consider proximity to doors, trafc areas or where people may pass or
gather (sidewalk, deck, patio, etc.). Listed cap shields available. Contact your dealer.
• Local codes or regulations may require different clearances.
• Vent system termination is NOT permitted in screened porches.
• Vent system termination is permitted in porch areas with two or more sides open.
• Hearth & Home Technologies assumes no responsibility for the
improper performance of the appliance when the venting system
does not meet these requirements.
• Vinyl protection kits are suggested for use with vinyl siding.
M = 18 inches .................... clearance under veranda, porch, deck,
balcony or overhang
42 inches ................vinyl or composite overhang
Permitted when veranda, porch, deck or balcony is fully open on a
minimum of 2 sides beneath the oor.
K = 6 inches................. clearance from sides of electrical
service
L = 12 inches................ clearance above electrical service
Location of the vent termination must not interfere with access to the electrical service.
Page 11
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1511
C. Approved Pipe
This appliance is approved for use with Hearth & Home Technologies SLP, Simpson Duravent and ICC venting systems. Refer to Section 11.A for vent component information and dimensions.
DO NOT mix pipe, ttings or joining methods from different manufacturers.
The pipe is tested to be run inside an enclosed wall. There is no requirement for inspection openings at each joint within the wall.
WARNING! Risk of Fire or Asphyxiation. This appliance requires a separate vent. DO NOT vent to a pipe serving a separate solid fuel burning appliance.
DO NOT USE FIELD-FABRICATED VENTING COMPONENTS.
This product is approved to be vented either horizontally, through the side wall or vertically through the roof. You may
vent through a Class A or masonry chimney if an approved
adapter is used.
This appliance is a direct vent heater. All combustion air must come directly from the outside of the building. The vent pipe for this unit consists of an inner and an outer pipe. The inner pipe carries the appliance exhaust out of the system, and the outer pipe brings fresh combustion air into the appliance.
• A round support box/wall thimble or heat shield is required when the venting passes through a combustible wall.
• A support box or ceiling restop is required when the venting passes through a ceiling.
• Roof ashing and a storm collar are required when venting passes through the roof.
• Follow instructions provided with the venting for installation of these items.
Page 12
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1512
D. Use of Elbows
Diagonal runs have both vertical and horizontal vent aspects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect. See Figure 4.4.
Two 45º elbows may be used in place of one 90º elbow. On 45º runs, one foot of diagonal is equal to 8-1/2 in. (216 mm) horizontal run and 8-1/2 in. (216 mm) vertical run. A length of straight pipe is allowed between two 45º elbows. See Figure 4.4.
Figure 4.5 shows the vertical and horizontal offsets for SLP elbows.
Figure 4.4
HORIZONTAL
VERTICAL
RUN
RISE
EFFECTIVE
LENGTH
Y
X
Vent Type
X
Inches Millimeters
SLP 11-1/4 286
Figure 4.5 Vertical and Horizontal Offset for SLP Elbows
Vent
Type
X Y
Inches Millimeters Inches Millimeters
SLP 5 127 11-3/4 298
SLP
Pipe
Effective Length Rise/Run
Inches Millimeters Inches Millimeters
SLP4 4 102 2-3/4 70
SLP6 6 152 4-1/4 108
SLP12 12 305 8-1/2 216
SLP24 24 610 17 432
SLP36 36 914 25-1/2 648
SLP48 48 1219 34 864
SLP6A 3 to 6 76 to 152
2-1/8-4-1/4 54-108
SLP12A 3 to 12 76 to 305
2-1/8-8-1/2 54-216
E. Measuring Standards
Vertical and horizontal measurements listed in the vent
diagrams were made using the following standards:
• Pipe measurements are shown using the effective length of pipe. See Figure 11.1 for SLP for information on effective length of pipe components.
• Horizontal terminations are measured to the outside mounting surface (ange of termination cap) (see Figure
4.3).
• Vertical terminations are measured to bottom of termination cap.
• Horizontal pipe installed level with 1/4 inch rise per foot.
Y
X
X
X
Page 13
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1513
G. Vent Diagrams
General Rules:
• SUBTRACT 3 ft. from the total H measurement for each 90º elbow installed horizontally.
• SUBTRACT 1 ft. from the total H measurement for each 45º elbow installed horizontally.
• A maximum of three 90º elbows (or six 45º elbows) may be used in any vent conguration. Some elbows may be installed horizontally. See specic vent diagrams.
• When penetrating a combustible wall, a wall shield restop must be installed.
• When penetrating a combustible ceiling, a ceiling restop must be installed.
F. Venting Guidelines for Horizontal Runs
C
L
Figure 4.6
C
L
REAR VENT (WITH VERTICAL RISE)
2 FT. MINIMUM
Max Horizontal Run, Rear Vent (No Rise)
8 in. (203 mm) See Figure 4.6.
Max Horizontal Run 8 ft (2.4 m) when vertical rise
is 8 ft (2.4 m)
Rear Vent with Vertical Rise
Min of 2 ft vertical (610 mm) must be used prior to any
horizontal run. See Figure
4.6.
Horizontal Run requires a non-combustible support every 3 ft (914 mm), i.e., plumbing tape
Page 14
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1514
Rear Vent - Horizontal Termination
Figure 4.7
No Elbow
H
1
Natural Gas:
Propane:
H1 = 14 in. (356 mm) Maximum
H
1
= 8 in. (203 mm) Maximum
Page 15
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1515
Rear Vent - Horizontal Termination - (continued)
Figure 4.8
Back to Back 90° Elbows Only
H
1
= 24 in. (610 mm) Maximum
H
1
Note: This conguration is recommended for corner installations.
Page 16
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1516
Rear Vent - Horizontal Termination - (continued)
Two Elbows
Figure 4.9
H
1
H
2
V
1
Note: Flue restrictor may need to be adjusted as vertical dimension increases.
Note: For optimum ame appearance, air shutter may need to be adjusted as vertical dimension increases.
2 Elbows to Max. Horizontal
V
1
Minimum H1 Maximum H1 + H2 Maximum
2 ft .61 m 8 in. 203 mm 18 in. .46 m
4 ft. 1.2 m 8 in. 203 mm 3 ft., 3 in. 1 m
6 ft. 1.8 m 8 in. 203 mm 6 ft. 1.8 m
8 ft. 2.4 m 8 in. 203 mm 8 ft. 2.4 m
10 ft. 3.1 m 8 in. 203 mm 7 ft., 3 in. 2.2 m
12 ft. 3.7 m 8 in. 203 mm 6 ft., 4 in. 1.9 m
14 ft. 4.3 m 8 in. 203 mm 5 ft., 5 in. 1.6 m
16 ft. 4.9 m 8 in. 203 mm 4 ft., 6 in. 1.4 m
18 ft. 5.5 m 8 in. 203 mm 3 ft., 7 in. 1.0 m
20 ft. 6.1 m 8 in. 203 mm 2 ft., 8 in. 813 mm
22 ft. 6.7 m 8 in. 203 mm 1ft., 10 in. 559 mm
Page 17
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1517
Figure 4.10
Three Elbows
INSTALLED
HORIZONTALLY
H
3
H
1
H
2
V
1
Note: Flue restrictor may need to be adjusted as vertical dimension increases.
Note: For optimum ame appearance, air shutter may need to be adjusted as vertical dimension increases.
3 Elbows to Max. Horizontal
V
1
Minimum H1 Maximum H
Total
6 ft. 1.8 m 8 in. 203 mm 3 ft. 914 mm
8 ft. 2.4 m 8 in. 203 mm 5 ft. 1.5 m
10 ft. 3.1 m 8 in. 203 mm 4ft., 3 in. 1.3 m
12 ft. 3.7 m 8 in. 203 mm 3 ft., 4 in. 1.0 m
14 ft. 4.3 m 8 in. 203 mm 2 ft., 5 in. 737 mm
16 ft. 4.9 m 8 in. 203 mm 1ft., 6 in. 457 mm
Page 18
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1518
Rear Vent - Vertical Termination
One Elbow
Figure 4.11
H
1
V
1
H1 Minimum H1 Maximum V1 Minimum V1 Maximum
6 in. 152 mm 14 in. 357 mm 6 ft. 1.8 m 25 ft. 7.6 m
Note: Flue restrictor may need to be adjusted as vertical dimension increases.
Note: For optimum ame appearance, air shutter may need to be adjusted as vertical dimension increases.
Page 19
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1519
V
2
V
1
H
2
H
1
Rear Vent - Vertical Termination - (continued)
Three Elbows
Figure 4.12
Note: Flue restrictor may need to be adjusted as vertical
dimension increases.
Note: For optimum ame appearance, air shutter may need to be adjusted as vertical dimension increases.
3 Elbows to Maximum Vertical
V
1
Minimum H1 Maximum H
Total
V1 + V2 MAXIMUM
6 ft. 1.8 m 8 in. 203 mm 3 ft. 914 mm 19 ft., 7 in. 6.0 m
8 ft. 2.4 m 8 in. 203 mm 5 ft. 1.5 m 14 ft., 11 in. 4.5 m
10 ft. 3.1 m 8 in. 203 mm 4 ft., 3 in. 1.3 m 16 ft., 10 in. 5.1 m
12 ft. 3.7 m 8 in. 203 mm 3 ft., 4 in. 1.0 m 19 ft. 5.8 m
14 ft. 4.3 m 8 in. 203 mm 2 ft. 5 in. 737 mm 20 ft., 9 in. 6.3 m
16 ft. 4.9 m 8 in. 203 mm 1 ft., 6 in. 457 mm 23 ft., 2 in. 7.1 m
Page 20
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1520
TERMINATION CAP
(Includ. in Link-Stove Kit)
EXISTING METAL CHIMNEY SYSTEM
TOP ADAPTOR
(Includ. in Link-Stove Kit)
DIRECT VENT PIPE
(Length as required)
FLASHING
(Includ. in Link-Stove Kit)
4 in. (102mm) FLEX PIPE
(Includ. in Link-Stove Kit)
RETRO CONNECTOR
(Includ. in Link-Stove Kit)
Class A Metal Chimney
Prior to installing the gas stove, ensure that the existing chimney is functionally sound and clean.
• Have the chimney and adjacent structure inspected
and cleaned by qualied professionals. Hearth & Home
Technologies recommends that NFI or CSIA certied
professionals, or technicians under the direction of
certied professionals, conduct a minimum of a NFPA 211 Level 2 inspection of the chimney.
• Replace component parts of the chimney and replace as specied by the professionals.
• See section 11 for venting components
Figure 4.15
Figure 4.16
5. Pull the flex pipe down through the ceiling support box, until it protrudes approximately 3 in. (76mm). Connect the flex pipe to the retro connector, and attach with sheet metal screws.
6. Push the flex pipe back up into the ceiling support box,
center the retro connector, and attach it to the support
box with sheet metal screws.
7. The connection between the appliance and the retro
connector may be completed with sections of direct vent
pipe.
Top Adapter
(Included in Link-Stove Kit)
Sheet Metal Screws
4” Flex Pipe
(Included in Link-Stove Kit)
Figure 4.14
Figure 4.13
1. Remove existing chimney cap.
2. Measure the distance from the top of the chimney to the bottom of the ceiling support box, add 3 in. (76mm) to this measurement, and cut a section of 4 in. (101mm) flex pipe to that length (the flex should be fully extended).
3. Connect the end of the flex pipe section to the underside of the top adapter, using four sheet metal screws. See Figure 4.14.
4. Pass the flex pipe down through the center of the
chimney system, and center the top adapter on the top
of the chimney pipe. Drill four 1/8 in. (3mm) diameter
holes through the top adapter, and into the chimney top,
preferably from the side of the top adapter.Ensure that you are drilling into the metal on the chimney. Twist lock the high wind termination cap onto the top adapter. See Figure 4.15 and Figure 4.16.
High Wind Termination Cap
(Part SLP-TVHW)
Sheet Metal Screws
Drill Four 1/8 in. (3mm) Diamater Holes
Page 21
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1521
Existing Masonry Chimney
Prior to installing the gas stove, ensure that the existing chimney is functionally sound and clean.
• Have the chimney and adjacent structure inspected and cleaned by qualied professionals. Hearth & Home
Technologies recommends that NFI or CSIA certied professionals, or technicians under the direction of certied
professionals, conduct a minimum of a NFPA 211 Level 2 inspection of the chimney.
• Replace component parts of the chimney and replaceas specied by the professionals.
NOTE: See section 11 for venting components.
Type C - Up & Out Installation Type D - Hearth Mount
Figure 4.17
Type A & B Co-Axial to Co-Linear
Chimney Liner Termination Cap
(Included in Chimney Liner
Termination Kit)
Co-Axial to
Co-Linear Connector
(Part 46DVA-GCL)
3 in. (76mm) Flex Liner
(Included in Chimney Liner
Termination Kit)
Showing two 25 ft.
(9m) Sections of
Flex Liner
Chimney Liner Termination Cap
(Included in Chimney Liner Termination Kit)
Co-Axial to Co-Linear
Connector
(Part 46DVA-GCL)
25 ft. (9m) of 3 in. (76mm) Flex Liner Exhaust Section
(Included in Chimney Liner Termination Kit)
4 ft. (1m) of 3 in. (76mm) Flex Liner Air Intake Section
The chimney must be sealed from the 4 ft. (1m) section to termination using a smoke shelf or a flue restrictor. The seal should be a minimum of 6 in. (152mm) below the end of the 4 ft.
(1m) Air Intake section.
This section of the chimney must be sealed
TERMINATION CAP
(Included in Link-Stove kit)
FLASHING
(Included in Masonry Chimney Conversion Kit)
4 in. (102mm) FLEX LINER
(Included in Link-Stove kit)
TOP ADAPTOR
(Included in Masonry Chimney Conversion Kit)
RETRO CONNECTOR
(Included in Masonry Chimney Conversion Kit)
90° ELBOW
DIRECT VENT PIPE
(Length as required)
Chimney Liner Termination Cap
(Included in Chimney Liner Termination Kit)
25 ft. (9m) of 3 in. (76mm) Flex Liner Exhaust Section
(Included in Chimney Liner Termination Kit)
4 ft. (1m) of 3 in. (76mm) Flex
Liner Air Intake Section
(Included in Chimney Liner Termination Kit)
Chimney must be sealed from 4 ft. (1m) section to termination using a smoke shelf or a flue restrictor. Seal
should be a minimum of 6 in.
(152mm) below end of 4 ft.
(1m) Air Intake section.
This section of the chimney must be sealed
Co-Axial to Co-Linear Connector
(Part 46DVA - GCL)
Alcove Clearance to Combustibles must be maintained. See Figure 3.2.
See COAXIAL/COLINEAR Section and Figure 4.31.
Page 22
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1522
10 in. x 10 in. (254mm x 254mm) framed opening in wall
Studwall
Masonry Chimney
Retro Connector
(Included in Masonry Chimney Conversion Kit)
(4) Masonry Bolts
(Not Included)
Wall Thimble Cover
(Included in Masonry Chimney Conversion Kit)
Cut and bend flashing as needed to fit
Figure 4.18
3. Secure the flashing to the top of the masonry chimney using a bead of non-hardening sealant-adhesive. If the
flashing is larger than the top of the chimney, cut and fold
flashing as needed to fit chimney. See Figure 4.19.
Figure 4.19
1. Before cutting any holes, assemble the desired sections
of direct vent pipe to determine the center of the masonry
penetration.
2. Once the center point of the penetration has been determined, cut a 6 in. (152mm) diameter hole in the masonry. If the hole is too large, the retro connector
might not mount properly; if the hole is too small, the
appliance might starve for intake air. If there is a frame wall in front of the masonry wall, cut and frame a 10 in.
(254mm) square opening in the wall (centered around
the 6 in. (152mm) masonry opening). If there is sheet rock only (no studs) in front of the masonry the 10 in.
(254mm) opening is still needed, but does not need to be
framed. If the hole is framed a wall thimble is required.
This allows the retro connector to mount directly on the masonry and provide the correct clearances to combustibles. See Figure 4.18.
4. To determine the length of flex needed, measure from 3 in. (76mm) above the top of the flashing down to the level of the opening. Add the distance from the center of the chimney out through the wall. Cut a piece of 4 in. (102mm) flex to this length (extended to its nominal length). Be sure to leave 2-3 in. (51-76mm) of flex above the existing chimney to allow for connection to the termination kit.
5. Connect the flex liner to the top adapter using three sheet metal screws. See Figure 4.14.
6. Feed the flex liner through the flashing into the chimney. Carefully feed the flex liner down the chimney to the
bottom and out the opening in the masonry wall, forming
an angle to line up the flex liner with the vent opening on the appliance.
WARNING! Risk of Fire, Explosion or Asphyxiation!
Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per installation instructions. DO NOT allow vent to sag below connection point to appliance.
7. If additional lengths of flex liner are needed to span the chimney height, use a flex coupler to connect the pieces of flex liner together. Connect the flex to the coupler by using four sheet metal screws for each side. See Figure
4.20.
NOTE: For hearth applications, refer to page 24 for the use of a co-axial to co-linear appliance connector.
Page 23
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1523
High Wind Termination Cap
(Part SLP-TVHW)
Top Adaptor
(Included in Link-Stove Kit)
(3) Sheet Metal Screws
Flashing
(Included in Link-Stove Kit)
Figure 4.21
9. Attach the flex to the retro connector. Use three sheet metal screws to attach the flex liner to the connector.
Mount the retro connector to the masonry wall using
masonry bolts. See Figure 4.22. Redrill larger holes on connector as needed. Be careful to ensure that the
connector is centered in the opening and the mounting
holes line up with the masonry wall.
6 in. (152mm) diameter opening in masonry wall
(3) Masonry Bolts (Not included)
Retro Connector
(Included in Masonry Chimney Conversion Kit)
(4) Masonry Bolts
(Not included)
Retro Connector
(Included in Masonry Chimney Conversion Kit)
Wall Thimble Cover
(Included in Masonry Chimney Conversion Kit)
Figure 4.20
8. Secure the top adapter to the flashing. Use three sheet
metal screws through the side of the top adapter into the
flange on the flashing See Figure 4.21. Twist lock the high wind termination cap on to the top adapter.
Flex Liner
(3 in. Part 3DFA-35) (4 in. Part 4DFA-35)
Flex Coupler
(3 in. Part 3DFA-FC) (4 in. Part 4DFA-FC)
Sheet Metal Screws
Figure 4.23
Figure 4.22
10. Slide wall thimble cover over retro connector and secure with masonry bolts. See Figure 4.23. If you have a
framed wall in front of the masonry, use wood screws to mount wall thimble cover to framed wall, over retro
connector and 10 in. (254mm) square framed opening See Figure 4.18. If needed, add a section of direct vent pipe to the retro connector in order to extend through the opening in the wall thimble cover.
11. The connection between the appliance and the retro
connector may be completed with sections of direct
vent pipe.
Page 24
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1524
EXHAUST VENT PIPE
INLET AIR VENT PIPE
Coaxial to Colinear Venting
The coaxial to colinear adapter (DV-46DVA-GCL) is
approved for installations into solid fuel masonry or factory
built replaces that have been installed in accordance with the National, Provincial, State and local building codes.
Figure 4.24 Coaxial/Colinear Appliance Connector
WARNING! Risk of Fire! Coaxial to colinear venting
conguration may only be used in existing non-combustible
chimney. Installation in any other venting application could
cause re.
CAUTION! DO NOT       
This may result in poor ame appearance, sooting, pilot
malfunction, or overheating.
WARNING! Risk of Fire, Explosion or Asphyxiation! Do
NOT connect this gas appliance to a chimney ue serving a
separate solid fuel or gas burning appliance.
• May impair safe operation of this appliance or other appliances connected to the ue.
• Vent this appliance directly outside.
• Use separate vent system for this appliance.
Page 25
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1525
A
B
10 in.
D
10 in.
10 in.
C
10 in.
MEASURED FROM FLOOR
A. Pipe Clearances to Combustibles
WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:
• Between ceiling restops
• Between wall shield restops
• Around vent system
Failure to keep insulation or other material away from
vent pipe may cause overheating and re.
5
Vent Clearances and Framing
Figure 5.2 Wall Penetration
Figure 5.1 Horizontal Venting Clearances To Combustible Materials
* When using SLP pipe, minimum clearances from the vent pipe to combustible
materials at inside wall firestops are: Top: 2-1/2 in. (64 mm) Bottom: 1/2 in. (13 mm) Sides: 1 in. (25 mm)
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
• If wall thickness is less than 4 in. the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. a DVP-HSM-B will be required.
SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to 194 mm thick).
• If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed. If wall thickness is greater than 7-5/8 in. a DVP-HSM-B will be required.
(SLP Pipe Shown)
1 in. (25 mm) clearance bottom & sides
Heat Shield
Wall
Shield
Firestop
WALL
Heat Shield
Wall
Shield
Firestop
WALL
3 in. (76 mm)
top clearance
1 in. (25 mm) clearance around vertical sections
3 in. (76 mm)
top clearance *
Heat Shield
1 in. (25 mm) clearance bottom & sides
3 in. (76 mm)
top clearance *
Heat Shield
B. Wall Penetration Framing/Firestops
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield restop(s). The wall shield restop maintains minimum clearances and prevents cold air inltration.
• The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.
• SLP pipe - A wall shield restop must be placed on each side of an interior wall. A minimum 1-1/2 in. (38 mm) overlap of attached heat shields must be maintained.
• See Section 7-F for information for regarding the installation of a horizontal termination cap.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by non­combustible materials such as concrete, a hole with
diameter one inch greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the wall
shield restop is only required on one side and no heat shield is necessary.
A B C D
Inches 53-3/4 17-3 /4 53-3/4 17- 3/4
mm 136 5 4 51 1365 451
Page 26
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1526
C. Ceiling Firestop/Floor Penetration Framing
A ceiling restop MUST be used between oors and attics.
SLP Pipe - Frame opening 9 in. x 9 in. (229 mm x 229 mm) whenever the vent penetrates a ceiling/oor (see Figure
5.3).
• Frame the area with the same sized lumber as used in ceiling/oor joist.
• The ceiling restop may be installed above or below the ceiling joists when installed with an attic insulation shield. It must be under joists between oors that are not insulated. Refer to Figure 5.4.
• Secure with three fasteners on each side.
WARNING! Risk of Fire! DO NOT pack insulation around the vent. Insulation must be kept back from the pipe to prevent overheating.
D. Install Attic Insulation Shield
WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies requires the use of an attic shield.
The International Fuel Gas Code requires an attic shield constructed of 26 gauge minimum steel that extends at least 2 in. (51 mm) above insulation.
• Attic insulation shields must meet specied clearances to
combustible materials and be secured in place.
• An attic insulation shield kit is available from Hearth & Home
Technologies. Contact your dealer to order. Install attic insulation shield according to instructions included with kit.
Figure 5.3 Installing Ceiling Firestop
Figure 5.4 Installing the Attic Shield
INSTALL ATTIC INSULATION SHIELDS
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM
CEILING FIRESTOP
INSTALLED BELOW CEILING
CEILING FIRESTOP
INSTALLED ABOVE CEILING
ATTIC ABOVE
A
PIPE
SLP
A
9 in. (229 mm)
A
Page 27
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1527
6
Appliance Preparation
A. Leveling the Appliance
WARNING! Risk of Fire! Prevent contact with combustible materials.
WARNING! Risk of Fire! Failure to maintain air space
clearance may cause overheating and re.
Figure 6.1
1. Thread Allen bolts through nuts until ush.
NOTE: Two Allen bolts and two nuts are included in the
component bag. Normally, only one is required on the leg not touching the oor.
Figure 6.3
3. Use a 5/32 in. (4mm) Allen wrench to adjust legs up and down to desired level.
Figure 6.2
2. Slide assembled nuts and bolts into slots on legs with the nuts on the bottom.
Page 28
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1528
7
Venting and Chimneys
Figure 7.1 High Temperature Silicone Sealant
A. Assemble Vent Sections
To attach the rst vent component to the starting collars of
the appliance:
• Lock the vent components into place by sliding the pipe section onto the collar.
• Align the seam of the pipe and seam of collar to allow engagement. Rotate the vent component to lock into place. Use this procedure for all vent components. See Figure
7.2.
• Slide the gasket over the rst vent section and place it ush to the appliance. This will prevent cold air inltration. Caulk with a minimum of 300°F continuous exposure rating may be used to hold the part in place.
• Continue adding vent components, locking each succeeding component into place.
• Ensure that each succeeding vent component is securely tted and locked into the preceding component.
Required Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications
For Installation into a commercial, multi-family (multi-level exceeding two stories) or high-rise applications: All outer pipe joints must be sealed with high temperature silicone (300°F minimum continuous exposure rating), including the slip section that connects directly to the horizontal termination cap.
• Apply a bead of silicone sealant (300°F minimum continuous exposure rating) inside the female outer pipe joint prior to joining sections. See Figure 7.1.
• Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer ues shall be sealed in this manner, unless otherwise stated.
WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when removing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak.
Figure 7.2 Adding Venting Components
Note: Align seams to engage pipe, then rotate counterclockwise to lock
Page 29
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1529
B. Assemble Slip Sections
• Slide the inner ue of the slip section into the inner ue of the pipe section and the outer ue of the slip section over the outer ue of the pipe section. See Figure 7.3.
• Slide together to the desired length.
Figure 7.4 Screws into Slip Section
• Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”
NOTICE: If slip section is too long, the inner and outer ues
of the slip section can be cut to the desired length.
 Apply a bead of silicone sealant (300ºF minimum
continuous exposure rating) inside the female outer pipe joint prior to joining sections.
 Only outer pipes are sealed, sealing the inner ue is not
required.
 All unit collar, pipe, slip section, elbow and cap outer ues
shall be sealed.
Figure 7.3 Slip Section Pilot Holes
• Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.
• Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 7.4.
Pilot hole
Page 30
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1530
D. Disassemble Vent Sections
• Rotate either section (see Figure 7.7) so the seams on both pipe sections are aligned as shown in Figure 7.8.
• Pull carefully to separate the pieces of pipe.
120º
Figure 7.5 Securing Vertical Pipe Sections
120º
Figure 7.6 Securing Horizontal Pipe Sections
Figure 7.8 Align and Disassemble Vent Sections
Figure 7.7 Rotate Seams for Disassembly
C. Secure the Vent Sections
• Vertical runs originating off the top of the appliance, with no offsets, must be supported every 8 ft. (2.44 m) after the maximum allowed 25 ft. (7.62 m) of unsupported rise.
• Vertical runs originating off the rear of the appliance, or after any elbow, must be supported every 8 ft. (2.44 m).
• Horizontal runs must be supported every 5 feet (1.52 m).
• Vent supports or plumbers strap (spaced 120º apart) may be used to support vent sections. See Figures 7.5 and
7.6.
• Wall shield restops may be used to provide horizontal support to vent sections.
• SLP ceiling restops have tabs that may be used to provide vertical support.
WARNING! Risk of Fire, Explosion or Asphyxiation!
Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per installation instructions. DO NOT allow vent to sag below connection point to appliance.
Page 31
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1531
Install Decorative Ceiling Components
A decorative ceiling thimble can be installed on a at ceiling through which the vent passes. The decorative ceiling thimble is used to cover the restop.
• Seal the gap between the vent pipe and restop using high
temperature silicone (300°F minimum continuous exposure rating) to prevent cold air inltration.
• Install the decorative ceiling thimble by sliding it up to the ceiling and attaching it using the provided screws.
A decorative cathedral ceiling support box can be installed on a cathedral ceiling through which the vent passes.
• Use a plumb-bob to mark the center line of the venting
system on the ceiling and drill a small hole through the
ceiling and roof at this point. Locate the hole and mark the outline of the cathedral ceiling support box on the outside roof.
• Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in. (3 mm) larger than the support box outline.
• Lower the support box through the hole in the roof until its bottom is at least 2 in. (51 mm) below the ceiling (Figure
7.9).
• Level the support box both vertically and horizontally and
temporarily tack it in place through the inside walls into the
roof sheathing.
• Use tin snips to cut the support box from the top corners down to the roof line and fold the resulting aps to the roof. See Figure 7.10.
• Nail the aps to the roof AFTER running a bead of non hardening sealant between the aps and the roof.
WARNING! Risk of Fire! Clean out ALL materials from
inside the support box and complete the vertical vent run and termination.
LEVEL
CATHEDRAL CEILING SUPPORT BOX
2 in. (51 mm) MIN. BELOW FINISHED CEILING
CUT HOLE 1/8 in. (3 mm) GREATER IN SIZE THAN PATTERN OF SUPPORT BOX AS IT IS PROJECTED ONTO ROOF LINE
Figure 7.9
Figure 7.10
Page 32
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1532
E. Vertical Termination Requirements
Install Metal Roof Flashing
• See minimum vent heights for various pitched roofs (Figure
7.11) to determine the length of pipe to extend through the roof.
• Slide the roof ashing over the pipe sections extending through the roof as shown in Figure 7.12.
Roof Pitch H (Min.) Ft.
Flat to 6/12........................................1.0*
Over 6/12 to 7/12 ............................ 1.25*
Over 7/12 to 8/12 .............................. 1.5*
Over 8/12 to 9/12 .............................. 2.0*
Over 9/12 to 10/12 ............................ 2.5*
Over 10/12 to 11/12 ......................... 3.25
Over 11/12 to 12/12 ........................... 4.0
Over 12/12 to 14/12 ........................... 5.0
Over 14/12 to 16/12 ........................... 6.0
Over 16/12 to 18/12 ........................... 7.0
Over 18/12 to 20/12 ........................... 7.5
Over 20/12 to 21/12 ........................... 8.0
* 3 foot minimum in snow regions
HORIZONTAL
OVERHANG
VERTICAL
WALL
GAS DIRECT VENT TERMINATION CAP
12
X
ROOF PITCH
IS X/ 12
LOWEST
DISCHARGE
OPENING
2 FT. MIN.
20 INCHES MIN.
H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING
Figure 7.11 Minimum Height From Roof To Lowest Discharge Opening
NOTICE: Failure to properly caulk the roof ashing and pipe
seams may permit entry of water.
• Caulk the gap between the roof ashing and the outside diameter of the pipe.
• Caulk the perimeter of the ashing where it contacts the roof surface. See Figure 7.15.
• Caulk the overlap seam of any exposed pipe sections that are located above the roof line.
CAULK
Ceiling Firestop
Nails
Minimum 1 in. (25mm) Clearance
Minimum 1 in. (25mm) Clearance
Minimum 1 in. (25mm) Clearance
Minimum 1 in. (25mm) Clearance
Figure 7.13
Figure 7.12
• Any occupied areas above the rst oor, including closets
and storage spaces, which the vertical vent passes through
must be enclosed. See Figure 7.13 for required clearances between vent and enclosure.
WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles around vent system. Failure to keep insulation or other material
away from vent pipe may cause overheating and re.
Page 33
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1533
Assemble and Install Storm Collar
CAUTION!       
Wear protective gloves and safety glasses during installation. Sheet metal edges are sharp.
• Slide the storm collar onto the exposed pipe section
and align brackets.
• Insert a bolt (provided) through the brackets and install
nut. Do not completely tighten. See Figure 7.14.
Figure 7.14 Insert Bolt into Brackets
• Slide the assembled storm collar down the pipe section
until it rests on the roof ashing.
• Tighten nut and make sure the collar is tight against the
pipe section.
• Caulk around the top of the storm collar. See Figure 7.15.
Termination Cap
(1 of 3)
Storm Collar
Caulk
Screws
Figure 7.15
Install Vertical Termination Cap
• Attach the vertical termination cap by sliding the inner collar of the cap into the inner ue of the pipe section while placing the outer collar of the cap over the outer ue of the pipe section.
• Secure the cap by driving three self-tapping screws
(supplied) through the pilot holes in the outer collar of the
cap into the outer ue of the pipe (see Figure 7.15).
Page 34
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1534
Important Notice: Heat shields may not be eld constructed.
Heat Shield Requirements for Horizontal
Termination
WARNING! Risk of Fire! To prevent overheating and re,
heat shields must extend through the entire wall thickness.
DO NOT remove the heat shields attached to the
wall shield restop and the horizontal termination cap
(shown in Figure 7.17).
• Heat shields must overlap 1-1/2 in. (38 mm) minimum.
There are two sections of the heat shield. One section is factory-attached to the wall shield restop. The other section is factory-attached to the cap. See Figure 7.17.
If the wall thickness does not allow the required 1-1/2 in. (38 mm) heat shield overlap when installed, an extended heat shield must be used.
• If the wall thickness is less than 4-3/8 in./ 111 mm, the heat shields on the cap and wall shield restop must be trimmed. A minimum 1-1/2 in. (38 mm) overlap MUST be maintained.
• Use an extended heat shield if the nished wall thickness is greater than 7-1/4 in. (184 mm).
• The extended heat shield may need to be cut to length maintaining sufcient length for a 1-1/2 in. (38 mm) overlap between heat shields.
• Attach the extended heat shield to either of the existing heat shields using the screws supplied with the extended heat shield. Refer to vent components diagrams in the back of this manual.
• Rest the small leg on the extended heat shield on top of the pipe section to properly space it from the pipe section.
Figure 7.16 Wall Thimble
F. Horizontal Termination Requirements
Install Decorative Wall Components (SLP only)
A decorative wall thimble can be installed on wall through
which the vent passes. The decorative wall thimble is used to cover the wall shield restop.
Slide the decorative wall thimble over the last section of horizontal pipe before connecting the termination cap to the pipe.
Once the pipe section and the termination cap have been
connected, slide the wall thimble up to the interior wall
surface and attach with screws provided. See Figure 7.16 .
Page 35
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1535
Figure 7.17 Venting through the wall
Note: When using termination caps with factory-supplied
heat shield attached, no additional wall shield restop is required on the exterior side of a combustible wall.
Install Horizontal Termination Cap
WARNING! Risk of Fire! The telescoping ue section of the
termination cap MUST be used when connecting vent.
• 1-1/2 (38 mm) minimum overlap of ue telescoping
section is required.
Failure to maintain overlap may cause overheating and re.
• Vent termination must not be recessed in the wall. Siding may be brought to the edge of the cap base.
• Flash and seal as appropriate for siding material at outside edges of cap.
• When installing a horizontal termination cap, follow the cap
location guidelines as prescribed by current ANSI Z223.1 and CAN/CGA-B149 installation codes and refer to Section
6 of this manual.
CAUTION! Risk of Burns! Local codes may require
installation of a cap shield to prevent anything or anyone from touching the hot cap.
NOTICE: For certain exposures which require superior
resistance to wind-driven rain penetration, a ashing kit and
HRC caps are available. When penetrating a brick wall, a brick extension kit is available for framing the brick.
INTERIOR
HEAT SHIELD OR
EXTENDED
HEAT SHIELD
WALL SHIELD
FIRESTOP
VENT DEPTH FROM BACK OF APPLIANCE TO
OUTSIDE SURFACE OF EXTERIOR WALL
SLIP SECTION
CAN BE EXTENDED
INNER VENT
OUTER VENT
HEAT SHIELD
1-1/2 IN. (38 MM) MIN.
OVERLAP
SHEATHING
EXTERIOR
Page 36
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1536
A. General Information
WARNING! Risk of Shock or Explosion! DO NOT wire
110-120 VAC to the valve or to the appliance wall switch.
Incorrect wiring will damage controls.
NOTICE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA 70-latest edition or the Canadian Electric Code CSA C22.1.
• Plug the cord from the appliance junction box to unswitched 110-120 VAC. This is required for proper operation of the appliance.
• A 110-120 VAC circuit for this product must be protected with
ground-fault circuit-interrupter protection, in compliance with the applicable electrical codes, when it is installed in
locations such as in bathrooms or near sinks.
• Low voltage and 110-120 VAC voltage cannot be shared within the same wall box.
WARNING! Risk of Shock! Plug 3-pronged (grounding) plug directly into a properly grounded 3-pronged receptacle.
DO NOT cut or remove grounding prong from plug.
Accessories Requirements
• This appliance may be used with a wall switch, wall mounted thermostat and/or a remote control.
Wiring for optional Hearth & Home Technologies approved accessories should be done now to avoid reconstruction. Follow instructions that come with those accessories.
Electrical Service and Repair
WARNING! Risk of Shock! Label all wires prior to
disconnection when servicing controls. Wiring errors can
cause improper and dangerous operation. Verify proper
operation after servicing.
WARNING! Risk of Shock! Replace damaged wire with type 105º C rated wire. Wire must have high temperature insulation.
8
Electrical Information
Page 37
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1537
B. Wiring Requirements
Intellire Plus Ignition System Wiring
• Plug the cord from the appliance junction box to 110-120 VAC for proper operation of the appliance.
WARNING! Risk of Shock or Explosion! DO NOT wire IPI controlled appliance junction box to a switched circuit. Incorrect wiring will override IPI safety lockout.
• Refer to Figure 8.1, IPI Wiring Diagram.
• This appliance is equipped with an IntelliFire Plus™ control valve which operates on a 6 volt/1.5 AMP system.
• Plug the 6 volt transformer plug into the appliance junction box to supply power to the unit OR install 4 AA cell batteries (not included) into the battery pack before use.
NOTICE: Batteries should only be used as a power source in the event of an emergency power outage. Batteries should not be used as a primary long-term power source. Battery polarity must be correct when installing batteries.
Do not store batteries in the battery pack when the appliance is powered by the 6 volt transformer connected to
permanent electrical service.
Figure 8.1 IPI Wiring Diagram
TO JUNCTION
BOX (110V)
MODULE
FLAME SENSE
IGNITER
RC100 RC200 RC300
(OPTIONAL CONTROLS)
GROUND
ORANGE
(PILOT)
GREEN
(MAIN)
BROWN
BLACK
RED
BATTERY PACK
6V DC
FLAME
MODULATION
BLACK
BLACK
RED
BROWN
Page 38
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1538
Wall Switch Installation for Fan (Optional)
If the box is being wired to a wall mounted switch for use with a fan (See Figure 8.2):
• The power supply for the appliance must be brought into a switch box.
• The power can then be supplied from the switch box to the appliance using a minimum of 14-3 with ground wire.
• At the switch box connect the black (hot) wire and red (switch leg) wire to the wall switch as shown.
• At the appliance connect the black (hot), white (neutral) and green (ground) wires to the junction box as shown.
• Add a 1/4 in. insulated female connector to the red (switch
leg) wire, route it through the knockout in the face of the
junction box, and connect to the top fan switch connector (1/4 in. male) as shown.
Red
Switch
Switch Box
Red
Black
Black
Green
Green
White
Power
Supply
Wires
White
Red
Black
Green
White
Minimum 14-3 AWG with Ground
Junction Box
Knockout
Figure 8.2 Junction Box Wired to Wall Switch or BC10
Page 39
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1539
Optional Fan Installation
KIT CONTENTS:
1 - Blower Mounted in Housing 2 - Speed Control Knob 3 - Pal Nut
4 - Ceramic Snap Disk
5 - Speed Control (Rheostat) 6 - Wire Harness (attached to Blower)
7 - 12 Screws
8 - 12 inch Glass Tape
9 - 1 Zip Tie 10 - Bracket #1 11 - Thermostat Bracket
TOOLS REQUIRED: Short #2 Philips screwdriver; 11/16 in. wrench, 3/8 in. wrench.
Installation
1. Open and inspect contents of the blower kit. The contents
of the kit are listed above and shown below in Figure
8.3. If any of the parts are missing or damaged, please contact your dealer for replacements.
NOTE: Not all parts will be used for this install.
Figure 8.3 Fan Kit Contents
2.
Lift off the appliance top and place it on a flat surface, with the porcelain side up to prevent damage. Remove the
back shield by removing the two screws along the top of
the shield.
See Figure 8.4. Place the blower on the oor
behind the appliance and route the ends of the wiring
harness through the rubber grommet on the underside.
3.
Holding the blower in place, attach it to the appliance with four of the screws provided. See Figure 8.5.
Figure 8.4 Remove Back Shield
Figure 8.5 Attach Blower with Four Screws
4. Install the snap disc. A snap disc bracket is located in the appliance’s component bag. Bend the two spade teminals on the snap disc from a horizontal to a vertical position. Insert the snap disc through the hole in the
snap disc bracket and attach the two white wires from
the wiring harness to the snap disc. See Figure 8.6.
NOTE: The mounting ange is on top of the bracket.
Figure 8.6 Install Snap Disc
3 2
4
1
5
6
10
11
9
7
8
SNAP DISC
SPADE
TERMINALS
SNAP DISC
BRACKET
Page 40
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1540
5. Attach the snap disc bracket to the stud located under
the left side of the appliance using the 10-32 nut also
located in the appliance component bag. Tighten until snug using the 3/8 in. wrench. See Figure 8.7 and Figure
8.8.
Figure 8.7 Attach Snap Disc Bracket
Figure 8.8 Mount Speed Control Using Pal Nut
6. Install the speed control (rheostat). The speed control mounts to the right rear corner of the component tray.
Insert the stem of the speed control through the hole
located on the right side of the cover. Secure with the pal nut using an 11/16 in. (17.5 mm) wrench. Attach
the black and white wires routed under the appliance
indicated in Figure 8.9 (wiring diagram), to the variable speed switch wires. Use the blue jumper wire provided in
the appliance component bag to make the connection on
junction box terminals as shown in Figure 8.9. Push the speed control knob onto the stem. Secure any extra wire up and out of the way using the zip tie provided.
7. Plug the fan into the receptacle labeled “FAN” on the junction box. See Figure 8.9. The blower will not run
until the appliance has heated up enough to activate the
snap disc. This can take up to 15 minutes depending on the temperature of the room. Likewise, the blower will
not automatically turn off until the appliance has cooled
off enough to turn off the snap disc.
Turning the control knob to the left (counterclockwise) until
you hear an audible click will turn the blower “OFF”. Turning
the control knob to the right (clockwise) until you hear a click
will turn the blower “ON”. Turning the control knob further to the right will reduce the speed of the blower.
JUMPER
(BLUE)
WHITE
BLACK
VARIABLE SPEED SWITCH
BLACK
WHITE
FAN
Figure 8.9 Fan Wiring Diagram
Page 41
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1541
Installation with optional RC-200 or RC-300 Remote Control
1. Install the Aux box supplied with the RC-200 or RC-300 into the component tray. Plug the auxiliary box into the receptical labeled REM/AUX on the junction box.
2. Plug the fan into the receptical on the auxiliary box.
3. Connect the two white wires from the fans wiring harness together using the 2 inch male to male jumper wire supplied with the optional fan kit.
4. Plug the wiring harness extending from the auxiliary box
into the IPI module supplied with the stive. See gure
8.10 (Wiring Diagram)
Remove Variable
Speed Switch and
Connect Terminal
ends Together
Jumper
WhiteWhite
Black
Fan
Junction Box
Jumper
(Blue)
IPI Module
Aux Box
Figure 8.10 Fan Wiring Diagram
Page 42
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1542
A. Fuel Conversion
• Make sure the appliance is compatible with available gas
types.
• Conversions must be made by a qualied service technician
using Hearth & Home Technologies specied and approved parts.
B. Gas Pressure
• Optimum appliance performance requires proper input
pressures.
• Gas line sizing requirements will be determined in ANSI
Z223.1 National Fuel Gas Code in the USA and CAN/CGA B149 in Canada.
• Pressure requirements are:
C. Gas Connection
• Refer to Reference Section 3 for location of gas line access in appliance.
• Ensure that gas line does not come in contact with outer wrap of the appliance. Follow local codes.
• Connect incoming gas line to the 1/2 in. (13 mm) connection on manual shutoff valve.
WARNING! Risk of Fire or Explosion! Support control when attaching pipe to prevent bending gas line.
• A small amount of air will be in the gas supply lines.
WARNING! Risk of Fire or Explosion! Gas build-up during line purge could ignite.
• Purge should be performed by qualified service
technician.
• Ensure adequate ventilation.
• Ensure there are no ignition sources such as sparks or
open ames.
Light the appliance. It will take a short time for air to purge from lines. When purging is complete the appliance will light and operate normally.
WARNING! Risk of Fire, Explosion or Asphyxiation!
Check all ttings and connections with a non-corrosive
commercially available leak-check solution. DO NOT use
open ame. Fittings and connections could have loosened
during shipping and handling.
WARNING! Risk of Fire! DO NOT change valve settings. This valve has been preset at the factory.
D. High Altitude Installations
NOTICE: If the heating value of the gas has been reduced, these rules do not apply. Check with your local gas utility or authorities having jurisdiction.
When installing above 2000 feet elevation:
• In the USA: Reduce input rate 4% for each 1000 feet above 2000 feet.
• In CANADA: Input ratings are certied without a reduction
of input rate for elevations up to 4500 feet (1370 m)above
sea level. Please consult provincial and/or local authorities having jurisdiction for installations at elevations above 4500 feet (1370 m).
Check with your local gas utility to determine proper orice size.
WARNING! Risk of Fire or Explosion! High pressure will
damage valve. Low pressure may cause explosion.
• Verify inlet pressures. Verify minimum pressures when other household gas appliances are operating.
• Install regulator upstream of valve if line pressure is greater than 1/2 psig.
9
Gas Information
Gas Pressure Natural Gas Propane
Minimum inlet pressure 5.0 in. w.c. 11.0 in. w.c.
Maximum inlet pressure 10.0 in. w.c. 13.0 in. w.c.
Manifold pressure 3.5 in. w.c. 10.0 in. w.c.
Note: Have the gas supply line installed in accordance with local codes, if any. If not, follow ANSI 223.1. Installation should be done by a qualied installer approved and/or licensed as required by the locality. (In the Commonwealth of
Massachusetts installation must be performed by a licensed
plumber or gas tter).
Note: A listed (and Commonwealth of Massachusetts
approved) 1/2 in. (13 mm) T-handle manual shut-off valve and exible gas connector are connected to the 1/2 in. (13 mm) control valve inlet.
• If substituting for these components, please consult
local codes for compliance.
Fire Risk.
Explosion Hazard.
High pressure will damage valve.
• Disconnect gas supply piping BEFORE
pressure testing gas line at test pressures
above 1/2 psig.
• Close the manual shutoff valve BEFORE
pressure testing gas line at test pressures
equal to or less than 1/2 psig.
WARNING
!
Page 43
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1543
E. Air Shutter Setting
Air shutter settings should be adjusted by a qualied service technician at the time of installation. The air shutter is set fully open at the factory for minimum vertical vent run. Adjust air shutter for longer vertical runs. See Figure 9.1.
• Loosen the wing nuts.
• Slide the wing nut to the right to close the air shutter.
• Slide the wing nut to the left to open the air shutter.
• Tighten the wing nuts.
NOTICE: If sooting occurs, provide more air by opening the air shutter.
Figure 9.1 Air Shutter
WING NUTS FOR SHUTTER ADJUSTMENT
Page 44
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1544
A. Remove Fixed Glass Assembly
WARNING! Risk of Asphyxiation! Handle xed glass
assembly with care. Inspect the gasket to ensure it is undamaged and inspect the glass for cracks, chips or scratches.
DO NOT strike, slam or scratch glass.
DO NOT operate replace with glass removed, cracked,
broken or scratched.
Replace as a complete assembly.
1. Remove safety barrier from appliance.
2. Gently remove top casting from unit and set aside on
prepared work surface. See Figure 10.1
3. Remove front casting by grasping it at the top and sliding
straight up. Set aside on prepared work surface. See Figure 10.1.
4. Using a Phillips screwdriver, remove the three screws
on the front glass assembly and take the glass off the
appliance. See Figure 10.2.
10
Appliance Setup
B. Remove the Shipping Materials
Remove shipping materials from inside or underneath the
rebox.
C. Clean the Appliance
Clean/vacuum any sawdust that may have accumulated inside the rebox or underneath in the control cavity.
Figure 10.2 Remove Glass Frame
Figure 10.1 Remove Casting
TOP CASTING
FRONT CASTING
SAFETY BARRIER
FASTENERS FOR GLASS FRAME
Page 45
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1545
D. Install the Log Assembly
Log Set Assembly
CAUTION: Logs are fragile, handle with care. Log #1 (7016-172): Gently remove top of unit and set aside. Remove cast face by sliding straight up and set aside. Remove the glass by removing the three Phillips head fasteners at the top of the glass frame assembly. Lean glass frame forward and lift out. Place the notch in the Rear Log over the pilot assembly.
Push
the log all the way to the rear of the firebox and center the log from left to right. See Figure 10.3.
LOG PLACEMENT INSTRUCTIONS
Figure 10.3.
Log #2 (7016-171): Align hole on bottom of Log #2 with locating pin on Log #1. Position bottom of Log #2 into notch on
left front of burner.
See Figure 10.4.
Log #3 (7016-170): Align hole on bottom of Log #3 with locating pin on Log #2. Position bottom of Log #3 into the notch on the right front of burner. See Figure 10.5.
Figure 10.4
Figure 10.6Figure 10.5
LOG #1 (7016-172)
LOG #2 (7016-171)
LOG #3 (7016-170)
LOCATING PIN
LOCATING PIN
LOCATING PIN
LOCATING PIN
Page 46
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1546
E. Install Fixed Glass Assembly
WARNING! Risk of Asphyxiation! Handle xed glass
assembly with care. Inspect the gasket to ensure it is undamaged and inspect the glass for cracks, chips or scratches.
DO NOT strike, slam or scratch glass.
DO NOT operate replace with glass removed, cracked,
broken or scratched.
Replace as a complete assembly.
Reinstall the glass frame by fastening the (3) phillips head screws at the top of the glass frame. Tighten until snug. Do not overtighten. See Figure 10.1 & 10.2 for reference. Reinstall front casting.
F. Adjust Flue Restrictor
The ue restrictor may need to be installed if there is a large amount of vertical pipe installed in the vent run.
Installation of the ue restrictor requires the removal of the bafe located inside the rebox. Remove the bafe by rst removing the two screws holding the bafe in place (one on each side). Angle the bafe slightly and remove it from the rebox. See Figure 10.6.
Figure 10.6
With the bafe removed, loosen the two screws located in the back of the rebox. See Figure 10.7.
Adjust the ue restrictor as required.

• If the vertical pipe on the vent run is between 15-20 feet, the restrictor should be approximately 20% closed.
• If the vertical pipe on the vent run is between 20-25 feet, the restrictor should be approximately 33% closed.
Figure 10.7
Loosen Screws
Bafe
Screws
Page 47
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1547
11
Reference Materials
A. Vent Components Diagrams
Figure 11.1 SLP Series Vent Components
8-3/4 in. 222 mm
6-1/2 in. 165 mm
6-5/8 in. 168 mm
6 in.
152 mm
6-1/2 in. 165 mm
6-5/8 in. 168 mm
9-7/8 in. 251 mm
6-1/2 in. 165 mm
9-1/4 in. 235 mm
SLP45
45° Elbow
SLP90
90° Elbow
Effective
Height/
Length
SLP PIPE
SLP-HVS
Horizontal Pipe
Support
SLP-FS
Ceiling Firestop
SLP-WS
Wall Shield Firestop
10-7/8 in.
276 mm
8-7/8 in. 225 mm
1-1/2 in.
38 mm
8-11/16 in.
220 mm
8-11/16 in.
220 mm
1-1/2 in.
38 mm
12 in.
305 mm
12 in.
305 mm
5-1/2 in. 146 mm
Effective Height/Length
Pipe
inches mm
SLP4 4 102
SLP6 6 152
SLP12 12 305
SLP24 24 610
SLP36 36 914
SLP48 48 1219
SLP6A 2 - 6 51 - 152
SLP12A 2 - 12 51 - 305
SLP-FLEX-2 24 610
SLP-FLEX-3 36 914
SLP-FLEX-5 60 1524
SLP-FLEX-10 120 3048
Page 48
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1548
A. Vent Components Diagrams 
SLP-WT-BK
Wall Thimble-Black
26 in.
660 mm
DVP-HSM-B
Extended Heat Shield
SLP-TRAP
Horizontal Termination Cap
15-1/8 in.
(384 mm)
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.
Heat
Shield
Term Cap
Minimum
Effective Length
Maximum
Effective Length
Trap1
3-1/8 in. 4-3/4 in.
79 mm 121 mm
Trap2
5-1/4 in. 9-1/4 in.
133 mm 235 mm
8 in.
(203 mm)
12 in.
(305 mm)
Max
Effective
Length
14-7/16 in.
367 mm
14-7/16 in.
367 mm
2-5/16 in.
59 mm
Figure 11.2 SLP Series Vent Components
Page 49
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1549
SLP-FLEX-TRAP
Horizontal
Termination Kit
14 in.
356 mm
14-1/16 in.
357 mm
7-1/2 in. 192 mm
10-3/4 in.
273 mm
10-9/16 in.
269 mm
14 in.
356 mm
SLP-CCS-BK
Cathedral Ceiling
Support Box-Black
13 in.
330 mm
13 in.
330 mm
1-5/16 in.
34 mm
SLP-DCF-BK
Ceiling Firestop
Black
12-1/2 in.
318 mm
12 in.
305 mm
SLP-TVHW
Vertical
Termination Cap
A. Vent Components Diagrams 
Figure 11.3 SLP Series Vent Components
SLP-LPC
SLP Low Prole Cap
12-1/2 IN. (318 mm)
15 IN.
(381 mm)
16-11/16 IN.
(424 mm)
16 IN.
406 mm
9-3/16 IN. (233 mm)
4-1/2 IN. 114 mm
16-11/16 IN.
424 mm
13-5/8 IN. (346 mm)
17-7/8 IN.
454 mm
7-3/8 IN. 187 mm
14 IN.
356 mm
12 IN.
305 mm
SLP-TB1
Horizontal Termination Cap
STOVEDV-BK
Simpson Duravent
Pipe Adapter Collar
STOVEDV-BK
ICC
Pipe Adapter Collar
Page 50
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1550
DV-46DVA-GCL
Coaxial/Colinear Appliance Connector
LINK-DV30B
Flex Liner Kit
768-380A
Stainless Steel Flex Pipe
COAXIAL to COLINEAR VENTING
Figure 11.4 SLP Series Vent Components
A. Vent Components Diagrams 
LINKSQC-DV30 (COPPER)
LINKSQB-DV30 (BLACK)
Page 51
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1551
B. Vent Components List
Description
HHT SL-P
M= Multi Pack (6)
Simpson
Dura-Vent
DirectVent Pro
ICC
Chimney
4” Pipe Length, Galvanized SLP4M - -
4” Pipe Length, Black SLP4-BK - -
6” Pipe Length, Galvanized SLP6M 46-DVA-06 DL6
6” Pipe Length, Black SLP6-BK 46-DVA-06B DL6B
7” Pipe Length, Galvanized - - -
7” Pipe Length, Black - - -
9” Pipe Length, Galvanized - 46-DVA-09 DL9
9” Pipe Length, Black - 46-DVA-09B DL9B
12” Pipe Length, Galvanized SLP12M 46-DVA-12 DL1
12” Pipe Length, Black SLP12-BK 46-DVA-12B DL1B
18” Pipe Length, Galvanized - 46-DVA-18 -
18” Pipe Length, Black - 46-DVA-18B -
24” Pipe Length, Galvanized SLP24M 46-DVA-24 DL2
24” Pipe Length, Black SLP24-BK 46-DVA-24B DL2B
36” Pipe Length, Galvanized SLP36M 46-DVA-36 DL3
36” Pipe Length, Black SLP36-BK 46-DVA-36B DL3B
48” Pipe Length, Galvanized SLP48M 46-DVA-48 DL4
48” Pipe Length, Black SLP48-BK 46-DVA-48B DL4B
Adjustable Length, 3”-6”, Black SLP6A-B - -
Adjustable Length, 3”-6”, Galvanized SLP6AM - -
Adjustable Length, 3”-7”, Galvanized - 46DVA-08A -
Adjustable Length, 3”-7”, Black - 46DVA-08AB -
Adjustable Length, 3”-12”, Black SLP12A-BK - DLS1
Adjustable Length, 3”-12”, Galvanized SLP12AM - DLS1B
Adjustable Length, 3”-14.5”, Galvanized - 46DVA-16A -
Adjustable Length, 3”-14.5”, Black - 46DVA-16AB -
Adjustable Length, 7”, Galvanized - - -
Adjustable Length, 7”, Black - - -
Adjustable Length, 11”-14”, Galvanized - - -
Adjustable Length, 11”-14”, Black - - -
Adjustable Length, 12”, Galvanized - 4DTAJ12 -
Adjustable Length, 12”, Black - 4DTAJ12- -
Adjustable Length, 16”, Galvanized - 46DVA-16A DLS2
Adjustable Length, 16”, Black - 46DVA-16AB DLS2B
Adjustable Length, 24”, Galvanized - - -
Adjustable Length, 24”, Black - - -
2’ Flexible Pipe Length SLP-FLEX-2 - -
3’ Flexible Pipe Length SLP-FLEX-3 - -
5’ Flexible Pipe Length SLP-FLEX-5 - -
10’ Flexible Pipe Length SLP-FLEX-10 - -
3” x 35’ Flex Extension - 3DFA-35 -
4” x 35’ Flex Extension - 4DFA-35 -
45° Elbow, Galvanized SLP45M -
4DE45
45° Elbow, Black SLP45-BK See Swivel
4DE45B
45° Elbow, Swivel, Galvanized - 46DVA-E45
-
Page 52
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1552
B. Vent Components List 

NOTES: 
2

SL IS NOT INTERCHANGEABLE WITH SLP.
Description
HHT SL-P
M= Multi Pack (6)
Simpson
Dura-Vent
DirectVent Pro
ICC
Chimney
45° Elbow, Swivel, Black - 46DVA-E45B
-
90° Elbow, Galvanized SLP90M See Swivel
4DE90
90° Elbow, Swivel, Galvanized - 46DVA-E90
-
90° Elbow, Swivel, Black - 46DVA-E90B
4DE90B
Adjustable Flashing, 0/12-6/12 SLP-RF6M 46DVA-F6
4FA
Adjustable Flashing, 7/12-12/12 SLP-RF12M 46DVA-F12
4FB
Attic Insulation Shield - Cold Climates 36” - -
-
Attic Insulation Shield 12” SLP-AS2M -
-
Attic Insulation Shield, Adjustable 11”-20” - 46-DVA-IS
4AS
Cathedral Support Box SLP-CCS-BK 46DVA-CS
4SS
Ceiling Support - 46DVA-DC
4CS
Co-Axial to Co-Lineal Appliance Connector - 46DVA-GCL
CAA
Decorative Ceiling Firestop - Black SLP-DCF-BK -
4TR
Decorative Radius Cover DRC-RADIUS -
-
Firestop Spacer/Ceiling Firestop SLP-FSM 46DVA-FS
-
Flex Trap Cap with Firestop
SLP-FLEX-TRAP
-
-
Flex Trap Cap with Firestop and 30’ Flex Pipe
SLP-FLEX-TRAP30
-
-
Masonry Chimney Conversion Kit - 46DVA-KMC
-
Offset Support - 46DVA-ES
OS
Offset Wall Thimble, Black SLP-WT-BK -
-
Silicone Roof Flashing, 4” to 8” pipes (6) RF4-8M -
-
Storm Collar SLP-SCM 46DVA-SC
SC
Trim Plate, Black - -
4TP
Wall Support Band SLP-HVSM 46-DVA-WS
WS
Wall Thimble Support Box/Ceiling Support - -
4WT
Wall Thimble, Black SLP-WSM 46DVA-WT
-
TERMINATION CAPS & KITS
Basic Horizontal Termination Kit (A) - 46DVA-KHA
-
Chimney Liner Termination Kit - 46DVA-GK
-
Horizontal Square Termination Cap SLP-HHW2 46DVA-HC
HT
RHVK Snorkel Kit - 844-8921
-
Snorkel Termination 14” SLK-SNKD 46DVA-SNK14
ST14
Snorkel Termination 36” - 46DVA-SNK36
ST36
*Stove Adaptor Kit (Vertical Cap Kit) LINK-STOVE -
-
Trapezoid Termination Kit (3-1/8”-4-3/4”) SLP-TRAP1 -
-
Trapezoid Termination Kit (5-1/4” X 9-1/4”) SLP-TRAP2 -
-
Vertical Termination Cap SLP-TVHW 46DVA-VCH
VT
Page 53
Quadra-Fire • GARN-MBK-IPI-B, GARN-DPMH-IPI-B, GARN-DMBK-IPI-B, GARN-DCSB-IPI-B Installation Manual • 2345-983_R2 • 07/1553
B. Accessories
Install approved accessories per instructions included with
accessories. Contact your dealer for a list of approved accessories.
WARNING!    Use ONLY
Hearth & Home Technologies-approved optional accessories with this appliance. Using non-listed accessories could result in a safety hazard and will void the warranty.
Remote Controls, Wall Controls and Wall
Switches
Follow the instructions supplied with the control installed to operate your replace:
For safety:
• Install a switch lock or a wall/remote control with child protection lockout feature.
• Keep remote controls out of reach of children.
See your dealer if you have questions.
Fan
Follow the instructions supplied with the fan kit to operate your fan. See your dealer if you have questions.
Quadra-Fire, a brand of Hearth & Home Technologies
352 Mountain Huse Road, Halifax, PA 17032
www.quadrare.com
Please contact your Quadra-Fire dealer with any questions or concerns.
For the location of your nearest Quadra-Fire dealer, please visit www.
quadrare.com.
Printed in U.S.A. - Copyright 2015