PON Series Cast Iron Boilers
on,Operation & Maintenance Manua
General Characteristics of 6PON series Boilers
Boiler Dimensions , Delivery Conditions
7
ormation on the Boiler Plate
Recommended Minimum Distance for Installation
10
Recommended Minimum Distance for Installation
Important Instructions About Boiler Room
N Series Cast Iron Boiler Parts and Spare Parts List
Cast Iron Sections with High Efficiency Design , Boiler Room Ventilation
Cast Iron Sections with High Efficiency Design
ance and Exit Flue Gas Temperature
Important Instructions About Flue and Connecting the Fuel Tank
Standart Control Panel Electric Diagram
Loading and Unloading The Boiler Water
Checking and Starting the Boile
Checking and Starting the Boiler
Care Instructions , Cleaning the Boile
urner Door and Burner Connection
Instructions for Product Disposal , Positioning the Boile
Instructions for Product Disposal
In this manualyou will find the instructions forRima threepass cast iron boilers suitable forbothgas and liquid fuel. ON
get in touch with Rima technical services.
ng,adjusting orrepairingtheboiler excep
Please call Rima services and technical officials for installing the boiler.
Ourlicensed frenchisers and services willgiveyou instructions about workin
rincipals,conditions and care instructions afte
installing and starting the boiler
will be glad to answer all
your questions at any time
Our professionals will be glad to answer all your questions at any time
PON Series boilers are in compliance with ;p;
90/396/EEC)Gas Appliances Directive
(92/42/EEC) Efficiency Directive
Electromagnetic Compatability Directive
EN 303/1: Heating boilers with forced draught burners - Terminology, general
requirements, testing and marking
Part 2: Heating boilers with forced draught burners
requirements for boilers atomizing oil burners
requirements for boilers atomizing oil burners
EN 303/3: Heating boilers-Part 3: Gas fired heating boilers-Assembly comprising a boiler
body and a forced draught burner
PON SERIES CE approved, No: CE-1015BR0261
consider on the standards in installation
t l bi d ddith
ON series cast iron boilers are designed for working with hot water heating and/or hot water plumbing and produced with
the proper technology and materials suitable for this design.This design is restricted to use out of it's aim of use.p p gy gg
ON series boilers are delivered as sections and services assemble the boilers in the operation area The assembling of the
ON series boilers are delivered as sections and services assemble the boilers in the operation area.The assembling of the
b il t b d b Ri thil i Ri bli f th b il h ld l b db
boiler must be made by Rima technical services . Removing or re - assembling of the boiler should also be made byy g g y
licensed Rima services, if not the risk of damage is high.
licensed Rima services, if not the risk of damage is high.
In the assembling of the boiler; there must be a proper and safe concrete platform for to put the boiler on
rom sidesforsafety requirements an
ng and first operation of the boiler must be made by authorized Rima technicians.
Do not add orpump waterto the boiler orplumbing system as it is working and hot . Foradding waterto the boiler orto the
system please wait for water temperature to reach 40ºC. Circulation pump must surely be started while adding water to the
system . If not , the sections may crack.
off from the main shelter/fuse as the boiler is in repair,service or cleaning.
period.)
.
The periodical controls of the boiler and the burner must be done. If not, the boiler may lose efficiency and the fuel amount
.
The capacity choice of the boiler must be made according to the projects that prepared properly in the terms of related
standards.If not , the boiler efficiency will be low.
the boiler efficiency will be low
.
ON series boilers are produced for heating only. For heating the sanitary water another equipment such as water heater or
heat exchanger is needed.For proper efficiency in this operation,correct water heater or heat exchanger must be selected.
heat exchanger is needed.For proper efficiency in this operation,correct water heater or heat exchanger must be selected
seriesboilers aredeliveredw
urners.Forsuitableburnerselection please ge
Suitable burners must be selected for taking high efficiency.
oppedautomaticallybecause ofoverheatingdo notaddcoldwate
wait for the boiler to cool down and re- try starting.If it does not start ,please get in contact with technical services.
eaning, repairandothercare operationsthe originalspare partswhichapprovedandmanufacture
e periodicalandyearly controlso
one properly andontime.Naturalgasisacleanfuelan
make a lot of dirt in the boiler.But the boilers that liquid fuels are used as fuels are much more easily get dirt. Controls and
care operations of the boiler is needed for keeping high efficiency and long life of the boiler.
Repairingandperiodical controls of ON series boilers requiresprofession.In this manual the responsibilities and required
rather than the user or one of our technicians.Please do not try to make adjustment or do not touch any parts of the boilers.
e
boiler room, burnerand boiler electrical connections, grounding line of control panel and boiler must be made by
professionals under the required and related standards.
In this manualyou will find informations onlyforthe boilers. Please do not forget toget the instruction manual of the burne
guarantee for the burner that you purchase. Please get the guarantee cer
or the burner from your supplier.
Please be sure that the front doo
burnerdoor)forthe boiler is strictlyclosed and burnerconnections areproperlymade as
ways observe the following safety instructions and regulations.
lways perform the following steps prior to inspection work.
Always perform the following steps prior to inspection work
ose the gas shut-off valve.
Close the heating feed and return
Danger!
If you smell gas, risk of poisoning and explosion due to a malfunction!
If you smell gas, risk of poisoning and explosion due to a malfunction!
Do not switch lights on or off
.
Do not use any other electrical switches.
Do not use any other electrical switches.
Do not use a telephone in the area of the hazard.
Do not use naked flames (such as matches or cigarette lighters)
Close the gas stop cock.
pen the windows and doors.
.
Get out of the house.
y your gas supplier or a suitably qua
Inflammable mixtures of gas and air may explode
.
Do not use or store explosive or easily flammable substances such as petrol or paint in the same room as the applience.
Do not use or store explosive or easily flammable substances such as petrol or paint in the same room as the applience
.
Risk of poisoning and explosion due to a malfunction.
ever put the safety devices out of operation or tamper w
em so as to impair their function.
Inappropriate alterations can cause damage!
system.Never try to carry out maintenance work or repairs on the appliance yourself.
Do not damage or remove seals on components.Only suitably qualified heating engineer or our customer service may
removed sealed components.
removed sealed components.
Do not touch hot water connections or the flue outlet when the boiler is operating.
Do not touch hot water connections or the flue outlet when the boiler is operating.
o notuse sprays, solvents, chlorinatedcleaning agents, paint,adhesives orsimilar substancesinthevicinityo
appliance. These substances can cause corrosion, including in the flue system.
5
General Characteristics of PON series Boilers :
ON series boilers are, blowing burner, cast iron sectioned, between the capacities 163–355 kW with properburne
connection, works with gas or liquid fuel in 7 different ( 5 – 11 sections) type.
co ect o , o s t gas o qu d ue d e e t ( 5 sect o s) type
ON series boilers operating pressure is 6 bar maximum, and working temperature is 90 °C maximum.
ON series boilers operating pressure is 6 bar maximum, and working temperature is 90 C maximum
ncreases the heat transfer a
y of cast iron boiler to the maximum level.
sectionstotheboiler.Thetransportation an
rooms. It is easily to carry or shift position without breaking walls etc.
They are long life boilers according to this special cast iron alloy
ransmits burning energy to the water inside the sections at high level.
and perfect isolation more energy is gained with less fuel. Heat loses are minimized on ON series boilers.
By appropriate burning room, heat transfersurface, turbulator, collectorand isolation high heat transferand optimum flue gas
emission results are provided.
Boiler Dimensions :
Delivery Conditions :
Boiler sections are delivered as not - assembled according to the boiler room specifications and dimensions.In not
assembled deliveries, sections and assembling aparats are delivered on a pallet, cabins,isolation and other elements are
delivered in a box. Rima technicians make the assembling of the boiler.
7