Outback Power Systems FW-IOB-Q-120VAC Installation Instructions

FW-IOB-Q-120VAC
Input/Output/Bypass Assembly
Installation Instructions
The OutBack Power Systems FW-IOB-Q-120VAC allows manual switching between the FX Series Inverter/ Charger and a second AC source, facilitating maintenance and power continuity.
About OutBack Power Systems
OutBack Power Systems is a leader in advanced energy conversion technology. Our products include true sine wave inverter/chargers, a maximum power point charge controller, system communication components, as well as breaker panels, breakers, accessories, and assembled systems.
Notice of Copyright
FW-IOB-Q-120VAC Installation Instructions Copyright © 2006 All rights reserved.
Disclaimer
UNLESS SPECIFICALLY AGREED TO IN WRITING, OUTBACK POWER SYSTEMS: (a) MAKES NO WARRANTY AS TO THE ACCURACY, SUFFICIENCY OR SUITABILITY OF ANY TECHNICAL OR OTHER INFORMATION PROVIDED IN ITS MANUALS OR OTHER DOCUMENTATION. (b) ASSUMES NO RESPONSIBILITY OR LIABILITY FOR LOSS OR DAMAGE, WHETHER DIRECT, INDIRECT, CONSEQUENTIAL OR INCIDENTAL, WHICH MIGHT ARISE OUT OF THE USE OF SUCH INFORMATION. THE USE OF ANY SUCH INFORMATION WILL BE ENTIRELY AT THE USER’S RISK.
Date and Revision
November 1, 2006 1.0
Contact Information
OutBack Power Systems 19009 62nd Ave. NE Arlington, WA 98223 Phone (360) 435-6030 Fax (360) 435-6019 www.outbackpower.com
Requirements and Warnings
The OutBack FW-IOB-Q-120VAC is intended as a system component and is included in a listing by
ETL as indoor enclosures to UL standard UL 508A Industrial Control Panels.
This enclosure is intended for battery circuits congured for 12 to 48 volts nominal.
Grounding Instructions – Each enclosure should be connected to a grounded, permanent wiring
system. For most installations, the negative battery conductor should be bonded to the grounding
system at one (and only one) point in the DC system. All installations must comply with all national
and local codes and ordinances. System grounding as required by the National Electric Code,
ANSI /NFPA 70-1996, is the responsibility of the system installer.
The equipment ground is marked with this symbol:
Loading...
+ 5 hidden pages