MANUAL COMP
MSD-375 BlastMax Medium Stile Doors
Installation and Glazing
MSD-375 BlastMax Medium Stile Door Installation
for Pairs of Doors
REFERENCE OLDCASTLE BULDINGENVELOPE DOOR AND FRAME INSTALLATION AND GLAZING MANUAL FOR TYPICAL DOOR INSTALLATION AND ADJUSTMENT INFORMATION. THE INFORMATION ABOVE IS DESIGNED TO COVER THE SPECIFIC MATERIALS AND GLAZING REQUIRED TO MEET INSTALLATION FOR BLAST PROJECTS.
Optional EAA-1 installation: The EAA-1 energy absorbing anchor is attached to the fg-5100 framing system using (1) FS-27 (#12 x 1/2" PPHSTS). The anchor may be oriented either perpendicular, parrallel or at any angle to the wall that provides adequate access to the perimeter fastener. If locating the anchor parrallel to the framing system it will be necessary to drill a 5/8" access hole through the glazing pocket to access the perimeter fastener. This fastener will be located in the anchor adjacent to the tab of the EAA-1. The perimeter anchor shall be a 1/4" fastener that shall be of type to provide proper attachment to the subsrate around the project opening. When anchoring the door jamb for the FG-5100 system it will be necessary to also install the CH-55 channel support at each anchor and secure this channel to the frame using (2) FS-27 fasteners.
Threshold Installation. Each threshold shall be attached to the frame using a TH-FP-4 clip at each end. The clip will be attached to the door frame using (2) FS-22 (#10-24 x 1 /2" PFHMS) and the threshold to the clip also with (2) FS-22 fasteners. The threshold will be anchored to the perimeter using 1/4" flat head fasteners. These will be located per FIGURE 3.
FIGURE 3
RELIANCE BLASTMAX DOOR MULL/JAMB
FG-5100 BLASTMAX DOOR MULL
FG-5100 BLASTMAX DOOR JAMB
MANUAL COMP
MSD-375 BlastMax Medium Stile Doors
Installation and Glazing
MSD-375 BlastMax Medium Stile Door Installation
REFERENCE OLDCASTLE bUILDINGENVELOPE DOOR AND FRAME
INSTALLATION AND GLAZING MANUAL FOR TYPICAL DOOR INSTALLATION
AND ADJUSTMENT INFORMATION. THE INFORMATION ABOVE IS
DESIGNED TO COVER THE SPECIFIC MATERIALS AND GLAZING REQUIRED
TO MEET INSTALLATION FOR BLAST PROJECTS.
NOTE: SPECIAL DOOR HEIGHT WHEN CALCULATING DOORS FOR BLAST INSTALLATIONS. OVERALL DOOR HEIGHT SHALL BE DOOR OPENING MINUS 1/2". (1/8" AT DOOR HEAD PLUS 3/8" AT THRESHOLD)