NORTH AMERICAN DRÄGER MINO2 FLOWELIMINATION User manual

RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
KIT,MINO2FLOWELIMINATION
CONVERSIONPROCEDURE:2GASMACHINES
RETURN TO CD-ROM TABLE OF CONTENTS
WARNING: DONOTinstalltheMinimumO
FlowEliminationonmachineshavingalowflow
2
oxygenratiocontroller(ORC)P/N4113229.
machines.
1. TurntheSystemPowerswitchto STANDBYandremoveACpower fromthemachine.
8. Cutanytiestrapssecuringthe flexibletubing,andremovethe tubingalongwiththeassociatedtee fitting.
2. Close all cylinder valves and disconnectallpipelinesupplies.
9. Removethehosebarbfittingfrom therightsideofthe4-wayfitting,
3. Removethebackcoverofthe flowmeterhousing.
andinstallawasher(P/N4102165) andplug(P/N4103801)asshownin thelowerviewofFigure1.
4. Removethebackcoverofthevapor box to gain access to the ORM/ORMC.
10. Connecta35in.lengthofflexible tubing(P/NML08003)andpress-on hoseclamptothehosebarbatthe
5. Removethepress-onhoseclamp
O
restrictorhousing.
2
anddisconnecttheflexibletubing fromtherightside(viewedfrom therear)oftherestrictorhousing4­wayfitting.SeeFigure1,upper view. (Earlier machines are configuredwitha3-wayfitting.)
11. Connecttheotherendofthetubing tothehosebarbattheO
porton
2
theORMorORMC.Installagreen O
label(PN4109871)ateachend
2
ofthetubing.
6. Removethepress-onhoseclamp anddisconnecttheflexibletubing fromthehosebarbattheO restrictorhousing.
7. Removethepress-onhoseclamp anddisconnecttheflexibletubing fromtheO
portattheORMor
2
ORMC.SeeFigure2.
12. Restorepowertothemachineand re-connectthepipelinesupplies(or
2
openthecylindervalves).
NOTE: Forlatermachineswithout
the O
O ratio alarm
2/N2
lamp,skiptoStep15.
1
REAR VIEW OF FLOWMETER HOUSING
TEE FITTING (REMOVE)
TUBING FROM O2 RESTRICTOR (REMOVE)
TUBING FROM ORMC TO O2 RESTRICTOR (INSTALL)
PLUG (INSTALL)
WASHER (INSTALL)
O2 RESTRICTOR CONNECTION
TUBING
(REMOVE)
HOSE BARB
FITTING
(REMOVE)
EARLIER MACHINES
CONFIGURED WITH
3-WAY FITTING
SP89001
TUBING FROM ORMC (REMOVE)
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
CONVERSION PROCEDURE: 2 GAS MACHINES (continued)
Figure 1: TUBING REMOVAL/INSTALLATION (MIN. O2FLOW ELIMINATION)
2
SP89002
VAPOR BOX TOP VIEW
OXYGEN RATIO
MONITOR CONTROLLER
O2 CONNECTION
MPL SWITCH ADJUSTMENT (TURN CLOCKWISE TO DECREASE SETPOINT)
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
CONVERSION PROCEDURE: 2 GAS MACHINES (continued)
Figure 2: ORMC O2CONNECTION AND MPL SWITCH LOCATION
3
LABEL
FRONT VIEW OF MACHINE
7/8"
1/8"
SP89003
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
CONVERSION PROCEDURE: 2 GAS MACHINES (continued)
13. Open the N several turns. Slowly open the O flow control valve and observe the O
O ratio alarm lamp.
2/N2
The alarm lamp should be lighted when the N ml/min.
Slowly close the O valve; the alarm lamp should be off when the N ml/min.
O flow control valve
2
O flow is above 800
2
flow control
2
O flow is below 700
2
14. If necessary, adjusttheMPL switch
2
on the ORM or ORMC (see Figure
2) until the alarm lamp responds as noted in Step 13.
15. Reinstall the vapor box back cover, and reinstall the flowmeter housing back cover.
16. Install the Minimum Flow Elimination label on the front of the machine at the top right of the flowmeter housing - positioned as shown in Figure 3.
17. Perform a complete PMS on the machine.
Figure 3: MIN. O2FLOW ELIMINATION - LABEL LOCATION
4
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
CONVERSION PROCEDURE: 3 AND 4 GAS MACHINES
1. Turn the System Power switch to STANDBY and remove AC power from the machine.
2. Close all cylinder valves and disconnect all pipeline supplies.
3. Remove the back cover of the flowmeter housing.
4. Remove the back cover of the vapor box to gain access to the ORM/ORMC.
5. Remove the press-on hose clamp and disconnect the flexible tubing from the side hose barb on the minimum flow cut-off valve.
Refer to Figure 1 for machines with Air.
Refer to Figure 2 for machines without Air. (Earlier machines may be configured as shown in the alternate view.)
8. Cut any tie straps securing the flexible tubing, and remove the tubing along with the associated tee fitting.
9. Remove the hose barb fitting from the minimum flow cut-off valve, and install a washer (P/N 4102165) and plug (P/N 4103801) as shown in the lower view of Figure 1 and Figure 2.
10. Connect a 35 in. length of flexible tubing (P/N ML08003) and press-on hose clamp to the hose barb at the O
restrictor housing.
2
11. Connect the other end of the tubing to the hose barb at the O
port on
2
the ORM or ORMC. Install a green O
label (PN 4109871) at each end
2
of the tubing.
12. Restore power to the machine and re-connect the pipeline supplies (or open the cylinder valves).
6. Remove the press-on hose clamp and disconnect the flexible tubing from the hose barb at the O restrictor housing.
7. Remove the press-on hose clamp and disconnect the flexible tubing from the O
port at the ORM or
2
ORMC. See Figure 3.
NOTE: For later machines without
the O
2
lamp, skip to Step 15.
13. Open the N several turns. Slowly open the O
O ratio alarm
2/N2
O flow control valve
2
2
flow control valve and observe the O
O ratio alarm lamp.
2/N2
5
CONVERSION PROCEDURE: 3 AND 4 GAS MACHINES (continued)
REAR VIEW OF FLOWMETER HOUSING
TUBING FROM ORMC (REMOVE)
TEE FITTING (REMOVE)
TUBING FROM O2 RESTRICTOR (REMOVE)
TUBING FROM ORMC TO O2 RESTRICTOR (INSTALL)
PLUG (INSTALL)
WASHER (INSTALL)
O2 RESTRICTOR
CONNECTION
TUBING (REMOVE)
HOSE BARB
FITTING (REMOVE)
MINIMUM FLOW
CUTOFF VALVE
SP90002
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
Figure 1: TUBING REMOVAL/INSTALLATION,3&4GASMACHINES WITH AIR
(MIN. O
FLOW ELIMINATION)
2
6
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
CONVERSION PROCEDURE 3 AND 4 GAS MACHINES (continued)
REAR VIEW OF FLOWMET ER HOU SING
MINIMUM FLOW CUTOFF VALVE
TUBING FROM ORMC (REMOVE)
TEE FITTIN G (REMOVE)
TUBING (REMOVE)
HOSE BARB FITTING (REMOVE)
TUBING FROM O2 RESTRI CT OR (REMOVE)
TUBING FROM ORMC T O O2 RESTRICT OR (INSTALL)
PLUG (INSTALL)
EARLIER MACHINE
CONFI GURA T I ON
WASHER (INSTALL)
O2 REST RI CT OR CONNECTION
SP90001
Figure 2: TUBING REMOVAL/INSTALLATION,3&4GASMACHINES WITHOUT AIR
(MIN. O
FLOW ELIMINATION)
2
7
SP89002
VAPOR BOX TOP VIEW
OXYGEN RATIO
MONITOR CONTROLLER
O2 CONNECTION
MPL SWITCH ADJUSTMENT (TURN CLOCKWISE TO DECREASE SETPOINT)
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
CONVERSION PROCEDURE: 3 AND 4 GAS MACHINES (continued)
Figure 3: ORMC O2CONNECTION AND MPL SWITCH LOCATION
8
LABEL
FRONT VIEW OF MACHINE
7/8"
1/8"
SP89003
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
CONVERSION PROCEDURE: 3 AND 4 GAS MACHINES (continued)
The alarm lamp should be lighted when the N
O flow is above 800
2
ml/min. Slowly close the O
flow control
2
valve; the alarm lamp should be off when the N
O flow is below 700
2
ml/min.
14. If necessary, adjust the MPL switch on the ORM or ORMC (see Figure
3) until the alarm lamp responds as noted in Step 13.
15. Reinstall the vapor box back cover, and reinstall the flowmeter housing back cover.
16. Install the Minimum O
2
Flow Elimination label on the front of the machine at the top right of the flowmeter housing - positioned as shown in Figure 4.
17. Perform a complete PMS on the machine.
Figure 4: MIN. O2FLOW ELIMINATION - LABEL LOCATION
9
NORTH
RETURN TO SERVICE PROCEDURE TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTSRETURN TO CD-ROM TABLE OF CONTENTS
AMERICAN DRÄGER
Technical Service Department 3122 Commerce Drive Telford, PA 18969 (215) 721-5402 (800) 543-5047 (215) 723-5935 Fax
Quality Service for Life
SM
Part Number: SP00089 Rev: B Date: July 10, 1996 © 1996 N.A.D., Inc.
Loading...