REFRIGERATORS AND FREEZERS
Installation, Operation and
Maintenance Instructions
INSPECTION
When the equipment is received, all items should be carefully checked against the bill of lading
to insure all crates and cartons have been received. All units should be inspected for
concealed damage by uncrating the units immediately. If any damage is found, it should be
reported to the carrier at once, and a claim should be filed with the carrier. This equipment has
been inspected and tested in the manufacturing facility and has been crated in accordance
with transportation rules and guidelines. Manufacturer is not responsible for freight loss or
damage.
INSTALLATION
GENERAL
After the unit crate and crate base have been removed, locate the casters or legs found inside
the cabinet. (Not applicable for Roll-In models). Attach the casters or legs to the unit base by
screwing them into the same threaded fittings that were used to secure the crate base to the
cabinet. Insure that the legs or casters are screwed completely into the base. The cabinet
should also be levelled when it is placed in its permanent location.
For shipping purposes, the condensing unit compressor is secured on the extra low
temperature models. Remove the spring clips and loosen the mounting bolts prior to
operation. See the label attached to the condensing unit.
If the doors are out of alignment on the cabinet, the doors can be adjusted. This can be
accomplished by opening the door(s) and loosening the screws that hold both the top and
bottom hinges to the cabinet. After adjusting the door so that it is aligned correctly, tighten the
screws to securely hold the hinges in place.
VAPORIZER INSTALLATION
Some of the Refrigerators and all of the Extra Low Temperature Freezers require the
installation of the condensate vaporizer which is shipped inside the unit compartment. The
vaporizer should be mounted to the cabinet bottom. Reference View 1. In lieu of the vaporizer,
these units can be plumbed to a floor drain following local plumbing codes. The Freezers,
Pass-Thru and Roll-In Refrigerators use a hot gas vaporizer. Customer installation is not
required.
1 06/11 Rev. B 127717
Note: Disconnect power prior to installation.
1. Connect the power cord to the vaporizer and place it in
the vaporizer bracket.
2. Attach the vaporizer bracket to the back of the unit using
the four screws as shown, making sure the plastic drain
tube is in the vaporizer pan.
LOCATION
The refrigeration system located at the top of the cabinet
requires free air access for proper operation. Allow a minimum
four (4) inch clearance on the top, rear, and sides of the
cabinet. The cabinet should also be levelled when it is placed
in its permanent location. There are no provisions for easily levelling the Roll-In models except
by the use of shims. Only minimal shimming is allowable. A cabinet that will sit directly on the
floor without casters should be levelled when placed in its permanent location. If casters are
not used, it is required by NSF that the cabinet be sealed to the floor with an approved sealant
such as Dow Corning #732 silicone.
ELECTRICAL
Check the proposed outlet to be used to insure that the voltage, phase and current carrying
capacity of the circuit from the electrical panel correspond to the requirements of the cabinet.
NEVER use an extension cord to wire any unit. On permanently connected units, those not
furnished with a plug-in service cord, all inter-wiring between the electrical panel and the unit
must be done in accordance with the National Electric Code and all state and local codes.
Refer to the serial tag for all pertinent electrical information.
Observe all Warning Labels. Disconnect power supply to eliminate injury from
electrical shock or moving parts when servicing equipment.
GENERAL OPERATION
The refrigerators and freezers employ a unit cooler evaporator located outside the cabinet as
the heat removing source. Through the refrigeration process, heat is captured in the
evaporator, transferred to the condensing unit on top of the cabinet, and expelled to the
surrounding outside air. It is extremely important to allow a four (4) inch clearance on the top,
rear, and sides of the unit for the refrigeration process to function properly.
These refrigerators and freezers utilize a programmable controller to control the
temperature and defrost settings. The controller, which is located on the facade of the
unit, is factory set. Please see the default settings sheet and separate instructions that
are included on the operation of this controller.
2 06/11 Rev. B 127717
REFRIGERATORS
During the operation of a refrigerator unit, frost will periodically form on the coil surface. Each
time the compressor cycles "off", the evaporator fans will continue to run, which will keep the
internal temperature uniform and at the same time remove any frost build up on the coil. The
water produced will collect in the unit cooler drain pan and travel down the drain tube to the
condensate vaporizer.
FREEZERS
After shutting the door on freezer models, a short amount of time must be allowed before the
door can be reopened. This is due to the tight seal maintained between the door and the
cabinet. Waiting a few moments for the pressure to equalize permits the door to be opened
easily.
A positive defrost is required to remove frost from the coil in freezer models. This is
accomplished by energizing heaters during the defrost cycle that are positioned on the coil
surface. The programmable controller is factory set to allow four defrosts per day.
As the preset defrost time is reached, the controller automatically terminates the refrigeration
process by turning off the condensing unit and unit cooler fan motors, and energizes the
defrost heaters. As the coil temperature increases, the frost begins to melt producing water
which runs down the coil to the unit cooler drain pan and exits through the drain tube to the
vaporizer. After all the frost has been removed and the coil temperature reaches
approximately 50°F [10ºC], the defrost is terminated through the action of the defrost
termination control located on the unit cooler, and the refrigeration process resumes. In order
to insure that any excess water remaining on the coil is not sprayed into the cabinet interior,
and all heat generated by the defrost is removed, the unit cooler fans will not operate until
the coil temperature reaches approximately 25°F [-4ºC].
Note: Running a cold wall model freezer in an unconditioned environment may result in frost
build-up inside the cabinet.
GENERAL MAINTENANCE
PERIODIC CLEANING
Beginning with the initial installation, the interior surfaces of the cabinet should be periodically
wiped down with a solution of warm water and baking soda. This solution will remove any
odors from spillage that has occurred. The exterior of the cabinet should also be cleaned
frequently with a commercial grade of glass cleaner.
Monthly cleaning of the condenser will aid the heat transfer characteristics of the refrigeration
system and increase its efficiency. To accomplish this, remove the cover panel from the
cabinet and use a wire brush to loosen any dirt particles that are attached to the fins. Use a
vacuum cleaner to remove the loosened particles. Failure to keep the condenser coil clean
and clear of obstructions could result in temperature loss and damage to the
compressor.
The shelving and pilasters should be periodically cleaned. The shelving should be removed
from the cabinet interior and washed with warm water and mild detergent using a soft bristle
brush or may be washed in a dishwasher large enough to accommodate the shelving size.
Pilasters may be removed from the cabinet interior by using a Philips screwdriver. Unscrew the
Philips head screws securing the pilasters to the cabinet interior walls. Retain the screws in a