Nelson Heat Trace ALT-BC, ALT-BCL Installation Guide

NELSON™ HEAT TRACING SYSTEMS INSTALLATION

ALT-BC STANDARD POWER CONNECTION KIT

DESCRIPTION
The ALT-BC Standard Power Connection Kit is constructed of cast aluminum for use with all versions of Nelson Heat Tracing Systems’ LT, CLT, HLT and NC heater cables. Compatible for use with any vendor’s heater cables smaller than 11mm (0.44”) diameter.
Power Termination
Junction Box
Conduit Plug
*Ground Wire
(for grounding of braid)
KIT CONTENTS
1 Junction Box 1 Power Termination 1 Label 1 Washer 1 Terminal Block 1 Ground Screw 1 Conduit Plug 1 End Seal 1 Sealing Grommet 1 Tube of Silicone 1 Stand-off 2 Pipe Clamps
Silicone
Box Cover Gasket
INSTRUCTIONS
Box Cover
Washer; metal **Sealing Grommet
*Conduit & Drain
*Heater Cable; braided cable optional
(see warnings)
End Seal
Stand-off
Pipe Clamp
**Sealing Grommet
J-Grommet - Overjacket Products B-Grommet - Base Products U-Grommet - Double Entry or non-standard construction
(For dual connections 1 additional power termination and end will be included in kit.)
*ITEMS NOT INCLUDED IN KIT
Note: This detail shows Braided “CB” Product only. For Overjacket “J” or “JT” Products, see diagram on sheet 8.
!
WARNINGS:
Article 427 of the National Electric Code requires that all heaters shall have metal coverings and
be provided with branch circuit ground-fault protection.
If nuisance tripping of ground fault breakers occurs due to condensation in the junction box, electrical connections should be moisture proofed by use of a coating or sealant.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1865 Rev. 6
Sheet 1 of 8
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BC STANDARD POWER CONNECTION KIT
INSTRUCTIONS

STAND-OFF POSITIONING

Section View A A
(recommend installing at the
4 or 8 o'clock positions.)
!
WARNING:
Do not place pipe clamps
8 o'clock
4 o'clock
254mm (10")
A
over the heater cable.
Pipe Clamps
A
Fiberglass Tape
not included in kit
Stand-off
Fiberglass Tape
not included in kit
Stand-off
Sealing Grommet
Mark pipe where stand-off will be mounted. See drawing above. Push heater cable through bottom opening of stand-off. Place stand-off on pipe and fasten with pipe clamps included. Slide the sealing grommet over the heater cable and position inside stand-off opening:
For Braided “CB” Products only: See “Sealing Grommet Installation for Braided “CB” Products” on sheet 3.
Apply silicone around the heater cable on top of the sealing grommet and fill any voids in sealing grommet. Prepare heater cable for power termination:
for Braided “CB” Products, see sheet 3. for Overjacket “J” or “JT” Products, see sheet 4.
Terminate heater cable, see sheet 7.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1865 Rev. 6
Sheet 2 of 8 September 2005
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BC STANDARD POWER CONNECTION KIT

SEALING GROMMET INSTALLATION FOR BRAIDED “CB” PRODUCTS

13mm (.5")
Slide braid back, allowing at least 13mm (.5”) of
heater cable exposed.
Cut and remove the exposed heater cable.

BRAIDED “CB” PRODUCTS

Slide braid back over heater cable and twist excess
braid into a pigtail.
Slide the sealing grommet over the heater cable and
position inside stand-off opening.
Continue with step 5 on sheet 2.
INSTRUCTIONS
127mm (.5")
Bend heater cable and work it through the braid
opening.
Secure heater cable braid with fiberglass tape,
allowing 127mm (5”) of cable for stripping.
114mm (4.5")
Slide braid back towards the fiberglass tape creating
a bulge.
At the bulge, separate the braid to make an opening.
Pull the braid tigh t.  Proceed to “LT, CLT & HLT Products” on sheet 5.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1865 Rev. 6
Sheet 3 of 8
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BC STANDARD POWER CONNECTION KIT

OVERJACKET PRODUCTS

127mm (5")
!
WARNING:
DO NOT CUT BRAID
Lightly cut around heater overjacket 127mm (5")
from the end. Bend cable to break overjacket.
Lightly cut overjacket up the center between first
cut mark and the cable end. Bend cable to break overjacket.
At the bulge, separate the braid to make an opening.
INSTRUCTIONS
Remove overjacket from heater cable.
Move braid back toward the overjacket, creating
a bulge.
While bending the heater cable, work it through the
braid opening.
114mm (4.5")
Pull the braid tight. Proceed to “LT, CLT & HLT Products” on sheet 5.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1865 Rev. 6
Sheet 4 of 8 September 2005
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BC STANDARD POWER CONNECTION KIT

FOR ALL NELSON LT, CLT & HLT PRODUCTS

(See sheet 6 for an alternate stripping method for HLT products.)
102mm (4")
Lightly cut around cable outer jacket 102mm (4")
from the end. Bend cable to break outer jacket.
Lightly cut the outer jacket up the center between
the first cut mark & the cable end. Bend cable to break outer jacket.
Starting at the end, pull each bus wire away from
the core material.
Remove exposed core material.
INSTRUCTIONS
Remove the jacket from the heater cable.
!
DO NOT CUT BUS WIRES
Cut 6mm (0.25") off the end of each bus wire. Proceed to “Power Termination” on sheet 7.
Shave the core material from the outside of
each bus wire.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1865 Rev. 6
Sheet 5 of 8
September 2005
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BC STANDARD POWER CONNECTION KIT

HLT PRODUCTS ALTERNATE STRIPPING METHOD

102mm (4")
Lightly cut around cable outer jacket 102mm (4")
from the end. Bend cable to break outer jacket.
Lightly cut the outer jacket up the center between
the first cut mark & the cable end. Bend cable to break outer jacket.
Starting at the end, in the same plane as the cable,
pull each bus wire away from the core material.
INSTRUCTIONS
Remove the exposed core material.
Remove the jacket from the heater cable.
Remove the remaining core material off the outside
Make a cut inside each bus wire.
of each bus wire.
Cut 6mm (0.25") off the end of each bus wire. Proceed to “Power Termination” on sheet 7.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1865 Rev. 6
Sheet 6 of 8 September 2005
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BC STANDARD POWER CONNECTION KIT

POWER TERMINATION

!
WARNING:
Bus wires must not touch or cross while
inserting into power termination.
Only power terminations / end seals
specifically approved for the vendors style and type of heater cable must be used.
apply silicone here
Insert bus wires into power termination.
Squeeze power termination opening and fill with
silicone.
END SEAL
Fiberglass Tape
not included in kit
Push power termination to overlap jacket. The silicone will set up in about 30 minutes with a
complete cure after 24 hours.
Proceed to “Power Termination” on sheet 8.
apply silicone here
INSTRUCTIONS
13mm (.5")
Braided “CB” Products only:
Cut braid back 25mm (1") & tape in place with
fiberglass tape.
Overjacket “J” or “JT” Products only:
Remove 13mm (0.5") of overjacket exposing the
braid, then remove the 13mm (0.5”) of exposed braid.
Make a 10mm (0.4") cut at the end of the heater
cable.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
Squeeze end seal and fill with silicone. Push end seal over the heater cable.
Overjacket “J” or “JT” Products only: The end seal should overlap the overjacket.
The silicone will set up in about 30 minutes with a
complete cure after 24 hours.
Proceed to “Power Connection” on sheet 8
!
WARNING:
Do not megger or hi-pot until
silicone is completely secured.
Braid must be kept away from
bus wires or shorting will occur.
GA-1865 Rev. 6
September 2005
Sheet 7 of 8
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BC STANDARD POWER CONNECTION KIT

POWER CONNECTION

Terminal Block
Ground Wire
*Ground Wire
Braid
Power Termination
TERMINAL BLOCK CONNECTION
Ground Wire Power Leads
INSTRUCTIONS
Braid Heater Cable
*Conduit & Drain; not included in kit
(must be positioned lower than the junction box)
Note: This detail shows Overjacket “J” or “JT” Products. For Braided “CB” Products, see diagram on sheet 1.
Slide washer over heater cable and position at the sealing grommet.
Secure junction box onto stand-off until tightly fitted. DO NOT OVER TIGHTEN. Connect the power wiring and heater cable to terminal block.
Connect ground wire to terminal block inside junction box using the ground screw. See diagram on sheet 1. Connect ground wire and braid to terminal block. See diagram above.
For Overjacket J or JT Products only:
Apply silicone at point braid leaves the overjacket.
Push all wires, cable and terminal block inside junction box. Install box cover gasket and box cover onto junction box.
Apply label to the smooth side of junction; fill-in the Voltage, Catalog No. & Wattage blocks on the label with the
actual field installed data.
Nelson Heat Tracing Systems products are supplied with a limited warranty. Complete Terms and Conditions may be found on Nelson's website at
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1865 Rev. 6
Sheet 8 of 8 September 2005
www.nelsonheaters.com.
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BCL STANDARD POWER CONNECTION KIT
DESCRIPTION
The ALT-BCL Standard Power Connection Kit is constructed of cast aluminum for use with Nelson Heat Tracing Systems’LLT heater cables.
Power T erm ina tion
Label
Junction Box
Conduit Plug
KIT CONTENTS
1 Junction Box 1 Power Termination 1 Label 1 Washer 1 Terminal Block 1 Ground Screw 1 Conduit Plug 1 End Seal 1 Sealing Grommet 2 Tubes of Silicone 1 Stand-off 2 Pipe Clamps
Silicone
*Ground Wire (for grounding of braid)
INSTRUCTIONS
Box Cover Gasket
Washer, metal
Sealing Grommet
*Conduit & Dr ain
End Seal
*Heater Cab le
Standoff
Pipe Clamps
*TH E SE IT E M S N O T IN C L U D E D IN K IT .
!
WARNINGS:
Article 427 of the National Electric Code requires that all heaters shall have metal coverings and
be provided with branch circuit ground-fault protection.
If nuisance tripping of ground fault breakers occurs due to condensation in the junction box, electrical connections should be moisture proofed by use of a coating or sealant.
Box Cover
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-2179 Rev. 1
Sheet 1 of 6
September 2005
NELSON™ HEAT TRACING SYSTEMS
INSTALLATION
ALT-BCL STANDARD POWER CONNECTION KIT INSTRUCTIONS
STAND-OFF POSITIONING
Section View A A
(recommend installing at the
4 or 8 o'clock positions.)
!
WARNING:
Do not place pipe clamps
8 o'clock
4 o'clock
254mm (10")
A
over the heater cable.
Pipe Clamps
A
Fiberglass Tape
not included in kit
Stand-off
Fiberglass Tape
not included in kit
Stand-off
Sealing Grommet
Mark pipe where stand-off will be mounted. See drawing above. Push heater cable through bottom opening of stand-off. Place stand-off on pipe and fasten with pipe clamps included. Slide the sealing grommet over the heater cable and position inside stand-off opening:
Apply silicone around the heater cable on top of the sealing grommet and fill any voids in sealing grommet. Prepare heater cable for power termination:
See sheet 3.
Terminate heater cable, see sheet 5.
.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-2179 Rev. 1
Sheet 2 of 6
September 2005
NELSON™ HEAT TRACING SYSTEMS
INSTALLATION
ALT-BCL STANDARD POWER CONNECTION KIT INSTRUCTIONS
OVERJACKET STRIPPING PROCEDURES
1
0
8
m
m
(
4
.
!
WARNING:
DO NOT CUT BRAID
2
5
"
)
Lightly cut around heater overjacket 127mm (5")
from the end. Bend cable to break the overjacket.
Lightly cut overjacket up the center between first
cut mark and the cable end. Bend cable to break
outer jacket will be removed in a subsuquent operation do not puncture it with the awl.
102mm(4" )
After the braid has been unraveled so that it looks
similar to the illustration above pull it tight and twist the loose wires together.
Proceed to “Outer Jacket Stripping Procedures”,
sheet 4.
Remove overjacket from heater cable.
Using an awl or other sharp pointed device, unravel
the braid from the cable. Even though most of the
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-2179 Rev. 1
Sheet 3 of 6
September 2005
NELSON™ HEAT TRACING SYSTEMS
INSTALLATION
ALT-BCL STANDARD POWER CONNECTION KIT INSTRUCTIONS
OUTER JACKET STRIPPING PROCEDURES
Lightly cut around heater outer jacket 102mm (4")
from the end. Bend cable to break outer jacket.
Lightly cut the outer jacket up the center between
the first cut mark & the cable end. Bend cable to break outer jacket.
Starting at the end, pull each bus wire away
from the core material. Do not disturb the “lay” of the wire stranding. Failure to comply will prevent installation of the power termination boot.
Remove exposed core material.
Remove jacket from the heater cable.
Proceed to “Power Termination Procedures”,
sheet 5.
!
DO NOT CUT BUS WIRES
Shave core material from the outside of
each bus wire.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-2179 Rev. 1
Sheet 4 of 6
September 2005
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BCL STANDARD POWER CONNECTION KIT
POWER TERMINATION
!
WARNING:
Bus wires must not touch or cross while
inserting into power termination.
Only power terminations / end seals
specifically approved for the vendor’s style and type of heater cable must be used.
apply silicone here
Before installing the boot, slightly cock the end of
each wire away from the other and apply a small amount of silicone to the open end of the boot.
Insert bus wires into power termination (boot).
END SEAL
Squeeze power termination opening and fill with
silicone.
Push power termination to overlap jacket. The silicone will set up in about 30 minutes with a
complete cure after 24 hours.
Proceed to “Power Connection” on sheet 8.
INSTRUCTIONS
13mm (.5")
apply silicone here
Squeeze end seal and fill with silicone. Push end seal over the heater cable.
Remove 13mm (0.5") of overjacket exposing the
braid, then remove the 13mm (0.5”) of exposed braid.
Make a 5mm (0.2") cut at the end of the heater
cable, as shown above.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
The end seal should overlap the overjacket.
The silicone will set up in about 30 minutes with a
complete cure after 24 hours.
Proceed to “Power Connection” on sheet 8
!
WARNING:
Do not megger or hi-pot until
silicone is completely secured.
Braid must be kept away from
bus wires or shorting will occur.
GA-2179 Rev. 1
September 2005
Sheet 5 of 6
NELSON™ HEAT TRACING SYSTEMS INSTALLATION
ALT-BCL STANDARD POWER CONNECTION KIT
POWER CONNECTION
* Ground W ire
Terminal Block
Braid
Ground W ire
Pow e r T erm ina t ion
TERM INA L BLOCK CONNECTION
Ground Screw in enclosure
Ground W ire Pow er Lea ds
INSTRUCTIONS
* Ground W ire
Braid Heater Cable
* Conduit and Dra in; not included
(should be positioned lower than t he junct ion box)
Slide washer over heater cable and position at the sealing grommet.
Secure junction box onto stand-off until tightly fitted. DO NOT OVER TIGHTEN. Connect the power wiring and heater cable to terminal block.
Connect ground wire to terminal block inside junction box using the ground screw. See diagram on sheet 1. Connect ground wire and braid to terminal block. See diagram above. Apply silicone at point braid leaves the overjacket.
Push all wires, cable and terminal block inside junction box. Install box cover gasket and box cover onto junction box.
Apply label to the smooth side of junction; fill-in the Voltage, Catalog No. & Wattage blocks on the label with the
actual field installed data.
Nelson Heat Tracing Systems products are supplied with a limited warranty. Complete Terms and Conditions may be found on Nelson's website at
www.nelsonheaters.com.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-2179 Rev. 1
Sheet 6 of 6
September 2005
NELSON™ HEAT TRACING SYSTEMS
ALT-BS SPLICE CONNECTION KIT
INSTALLATION INSTRUCTIONS
DESCRIPTION
The ALT-BS Splice Connection Kit is constructed of cast aluminum for use all versions of Nelson Heat Tracing Systems’ LT, CLT, HLT and NC heater cables. Compatible for use with any vendor’s heater cables smaller than 11mm (0.44”) diameter. Minimum installation temperature –40°C (-40°F).
Power Terminations
Junction Box
Conduit Plug
Terminal Block
KIT CONTENTS
1 Junction Box 2 Power Terminations
Terminal Block 1 Washer
1
Conduit Plugs 1 Ground Screw
2
Sealing Grommet 1 Tube of Silicone
1
Stand-off 2 Pipe Clamps
1
Silicone
Box Cover Gasket
Box Cover
Washer; metal
Sealing Grommet
U-Grommet - Double Entry or non-standard construciton
Stand-off
Braid
*ITEMS NOT INCLUDED IN KIT
Pipe Clamps
Ground Screw
(for use with braided cables only)
Note: This detail shows external grounding of braid. For internal grounding of braid
(overjacket products), see sheet 8.
!
WARNINGS:
Canadian Div. 2 Hazardous installations must use internal ground connection of braid. See sheet 8. Article 427 of the National Electric Code requires that all heaters shall have metal coverings and be
provided with branch circuit ground-fault protection.
If nuisance tripping of ground fault breakers occurs due to condensation in junction box, electrical
connections should be moisture proofed by use of a coating or sealant.
P.O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-1866 Rev. 7
Sheet 1 of 8
January 2010